My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2015 09 15
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2015 City Council Minutes
>
City Council Minutes 2015 09 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:13:01 PM
Creation date
10/8/2015 7:54:55 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Original Hardcopy Storage
9C1
Supplemental fields
Test
CCMIN 2015 09 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />September 15, 2015 <br />Page 9 of 20 <br />PRESENTATION — CITY MANAGER'S PROPOSED 2016 BUDGET AND 2016 -2020 <br />CAPITAL IMPROVEMENTS PLAN (CIP) —SET PUBLIC HEARING OCTOBER 20, <br />2015 <br />Mayor Muckle requested a staff presentation. <br />City Manager Fleming presented an overview of the Proposed 2016 Budget and 2016- <br />2020 Capital Improvements Plan (CIP). 2016 Budget Key Sections: Summary of <br />Recommended Significant Changes (Budget increases exceeding $10,000); 2016 <br />Programs, Goals, Sub - Programs and Contributing Projects and Department Summaries <br />and Performance Measures. <br />Financial Overview: <br />• Revenue Assumptions and Expenditure Targets <br />• Recurring Revenue vs Recurring Expenditures <br />• Primary Fund Forecasts (General Fund, Open Space and Parks Fund, Capital <br />Projects Fund, Water, Wastewater, and Storm Water Funds (Combined Utility <br />Fund) and Golf Course Fund <br />2016 Major Capital Projects: <br />• Major upgrades at the Wastewater Treatment Plant to satisfy more stringent <br />federal and state water quality standards <br />• Numerous water system equipment replacements and system improvements <br />• Complete Phase 2 of the Louisville /Lafayette boundary stormwater <br />improvements <br />• Street resurfacing in priority locations throughout the City <br />• Pedestrian safety, intersection and streetscape improvements along the Highway <br />42 Corridor <br />• Finalize implementation of City's centralized data system (ERP) <br />• Open Space and Trails wayfinding projects <br />2016 Increased Service Levels <br />• 3 FTE's and $30,000 in contract funding in Parks and Open Space /weed control, <br />landscape maintenance and controlled burn <br />• 1 FTE and $45,000 in CIP funds to implement body cameras in PD <br />• .6 FTE and $20,152 to fund Historic Preservation Intern and implement elements <br />of Historic Preservation Master Plan <br />• .5 FTE Sustainability Coordinator <br />2016 Building Adequate Reserves <br />• Maintain General Fund reserves above a 20% target reserve through 2020 <br />• Proposed 2016 -2020 5 -Year CIP result in a 2016 year -end reserve exceeding <br />$1.7 Million and 2020 exceeding $3.0 Million <br />
The URL can be used to link to this page
Your browser does not support the video tag.