Laserfiche WebLink
Historical Tap Fee Infrastructure Cost History <br />Historical Price of Colorado Big Thompson (CBT) Units <br />S18A00 $zs.000 <br />C 5>zpm <br />os. a <br />$ s.,...0 k L <br />s.,000 _ 5 <br />6 <br />Kom <br />$2,000 <br />iiilIIIIIIIIIIIIIIIIIIItl <br />IIIIIIOI <br />1 <br />$o 1 LL $o <br />$30,000 <br />$25,000 <br />$20,000 <br />$15,000 <br />Year $ /Share <br />• 1990 $1,600 $10,000 <br />O 2000 $16,000 <br />O 2003 $14,000 $5,000 <br />• 2010 $7,000 <br />O 2015 $22,000 $ <br />• Tap Fee Basis ($13,000) <br />Initial <br />Fee <br />O O t--1 ,--I N N m d- d- 111 111 to N N 00 00 0l Q1 O s-1 a1 N N m d- d' Lf1 <br />O O O O O O O O O O O O O O O O O O r-1 r1 t -I ,--1 c-1 c-1 , -I c-1 c-1 <br />ci c—I c-1 • c▪ -1 • c-I • c-1 t• -1 c1 i• -▪ 1 • c-1 ▪ c-1 i• -1 • c-1 • c-1 • c-1 • c-1 r1 • <-I t• 1 c-1 ▪ c-1 <• -1 c-1 e1 ei r. i c-1 <br />c-1 00 M • 0 LIl • N • I. N • Ql • di- • c-1 • to • , -1 co • m • O 111 • N • 1, Ni ▪ Q1 dr r-1 • LO c-I 00 M <br />c-1 c-1 c-I c-1 c-1 c-1 <br />-Tap Fee <br />-ENR CCI 1 Share CBT (1/2 AF) <br />