Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />December 10, 2015 <br />Page 3 of 29 <br />Tengler says he requests that the PC honor the applicant's request for continuation. Motion <br />made by Brauneis for denial continuance, seconded by Moline. Roll call vote. <br />Name <br />Vote <br />Chris Pritchard <br />N/A <br />Jeff Moline <br />Yes <br />Ann O'Connell <br />Yes <br />Cary Tengler <br />Yes <br />Steve Brauneis <br />Yes <br />Scott Russell <br />Yes <br />Tom Rice <br />Yes <br />Motion passed /failed: <br />Pass <br />Motion passes 6 -0. <br />> 633 CTC Blvd Final PUD: Resolution 37, Series 2013' resolution recommending <br />approval of a final Planned Unit Development (PUD) to construct a 153,018 sf single <br />story industrial /flex building with associated site improvements on Lots 3, 4, 5, and 6, <br />CTC Filing 2 subdivision. <br />• Applicant/Owner /Representative: Etkin Johnson <br />• Staff Member: Sean McCartney, Principal Planner <br />Conflict of Interest and Disclosure: <br />None. <br />Public Notice Certification: <br />Published in the Boulder Daily Camera , • ber 22, 20 osted in City Hall, Public <br />Library, Recreation Center, the Courts a 'olice Building, an . ied to surrounding property <br />owners on November 20, 2 .. <br />Material board submit otion 'e by R o enter material board into record, seconded <br />by Rice. Motion passe. •y voice <br />Staff Report of Facts and Issues. <br />McCartney presented from Power Poi <br />• Project located on southwest corner of Boxelder and CTC Blvd. To the west is the <br />property discussed last month for the Louisville Corporate Campus. During the <br />development of this property, there was an access constructed from Louisville Corporate <br />Campus to CTC Blvd. The access is in this development. <br />• The property is zoned Industrial (I). It is required to follow the IDDSG. <br />• The building is a 153,018 sf building general flex space. <br />• IDDSG requires maximum coverage of 75% hardscape and 25% soft scape. This <br />proposal is 74% hardscape and 26% soft scape which exceeds IDDSG requirement. <br />• There are five access points: two on CTC Blvd, two on Boxelder, one access from <br />eastern project. <br />• PARKING: <br />o The "warehouse with loading" requires 2 spaces per 1,000 sf (307 spaces) and <br />"office without loading" requires 4 spaces per 1,000 sf (612 spaces). The <br />applicant is proposing 2.73 spaces per 1,000 sf (421 spaces) and 3.7 spaces per <br />1,000 sf (558 spaces). <br />o The "office without loading" amount of 3.7 spaces per 1,000 square feet requires <br />a waiver from the IDDSG. Staff believes the waiver request is acceptable and <br />recommends approval. <br />• SIGNS: <br />o Monument Signs: <br />