My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Recreation/Senior Center and Aquatic Center Expansion Task Force Agenda and Packet 2016 01 27
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
RECREATION/SENIOR/AQUATIC CENTER EXPANSION TASK FORCE
>
2016 Recreation/Senior Center and Aquatic Center Expansion Task Force Agendas and Packets
>
Recreation/Senior Center and Aquatic Center Expansion Task Force Agenda and Packet 2016 01 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:07:14 AM
Creation date
2/11/2016 2:17:12 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
RSACETFPKT 2016 01 27
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SINKCOMBSDETHLEFS <br />ARCHITECTURE DESIGN <br />6. Boilers are in a very tight in the pool mechanical, room is too small, not enough <br />ventilation. <br />7. Use Automated Logic DDC controls for this building as well as 3 others in town. <br />Primarily built as HVAC. Ventilation air is very important. Demand control ventilation is <br />in some spaces, no VFD. <br />8. Think that the locker rooms should be completely redone. They have had 3 different <br />types of flooring. Currently, the locker rooms, mainly showers, don't always serve the <br />needs of the swimmers. Consider building new fitness club style lockers to alleviate the <br />current lockers for just pool. <br />9. There are plumbing issues, in lockers and under the kitchen. Cleanouts not conveniently <br />located. <br />10. There are soils issues on this site. Hydrostatic migration issues under slabs, high <br />moisture content. <br />11. Probably need breathable flooring to alleviate the underslab moisture problem. <br />12. Out of capacity on most electrical panels, probably have enough capacity in the main <br />service. <br />13. Went through the process to add solar hot water preheating. Pipes are in place, need to <br />add the collectors. <br />14. Building envelope is poorly insulated and in need of an upgrade, likely upgrades to <br />energy code. <br />15. Roof was replaced in 2010 with PVC Sarnafil, added insulation to R30 -R38, minimized <br />leaks. Metal roof has some challenges, especially around the skylight at the main entry. <br />16. Think we may need to upgrade the entire fire detection system. <br />17. Technology and security - would be good to go to electronic access to the exterior. Do <br />have cameras, no security system. <br />18. Would like to have phone paging capability. <br />19. Need better wireless capability. <br />20. Remember there are 2 cell towers on -site that are being leased. <br />21. Doors are beaten up, likely all need replaced. Hardware probably needs upgraded, <br />grade 1. <br />22. Site lighting also got deferred, crosswalk is dark at night, would like to do bi -level LED <br />to do sensing light. <br />23. Second floor restroom is needed. <br />24. Running track still deflects on the north side. Current flooring surface is great though. <br />Not too "grippy" for walkers. <br />25. Aerobics floor still needs replacement. <br />26. Front entry needs more of an air lock. Wind and leaves are common. Flooring is <br />cracked and tile is discontinued. <br />27. Hot tub mechanical room is in need of upgrading. Too small, dark, etc. <br />Group 7 - General Facilities / Group Exercise / Childcare <br />1. Fitness <br />a. Drop -in fitness classes <br />i. Yoga <br />ii. Zumba - sometimes up to 40 -50 people would attend <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.