Laserfiche WebLink
2017 -2018 Contributing Projects <br />The following projects and activities will above and beyond the normal services levels are <br />proposed for 2017 and 2018: <br />Planning and Engineering: <br />[Example] Additional Professional Services. Total costs of $XX,XXX allocated 25% each <br />to the Capital Projects Fund and the Water Fund and Waste Water Fund. Justification: The <br />significant increase in street resurfacing during the next two years will require additional <br />engineering, testing and inspection services. Existing staff cannot effectively do this work <br />and contracting out is necessary because.... <br />Transportation Infrastructure Maintenance: <br />Streetscapes: <br />Snow and Ice Removal: <br />3 <br />7 <br />