Laserfiche WebLink
Summary of Annual <br />Operating Requirements <br />Scenario <br />(Build Out Demand) <br />Louisville <br />(2.54 MGD) <br />Superior <br />(1.72 MGD) <br />Status Quo $1.66M $1.34M <br />Combined Plan $1.41M $0.95M + $0.12M* = <br />$1.07M <br />Annual Savings $250,000 $270,000 <br />* - Additional Cost Required to Move Flow to Louisville