My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2016 03 09
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2016 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2016 03 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:25 AM
Creation date
3/15/2016 2:53:15 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2016 03 09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Percent <br />100% <br />Five -Year Capital Improvement Program <br />Re • uest for Ca • ital E • ui • ment or Capital Improvement Project <br />Project or Equipment Identification <br />Project Namo: Irrigation lock Replacements <br />Version of Request: <br />Submitting Department/Division: Parks & Recreation <br />Impacted Departments/Divisions: Parks 8 Recreation <br />17 -Apr -15 <br />Sourco(s): <br />Open Punch? ace <br />& Parks s Fund <br />Total Funding <br />Department Priority <br />100% <br />42 <br />Project Location Map, Equipment Identification Photo, or Other <br />Project or Equipment Description and Justification <br />Ploaso provido a general project description and include the cost allocation methodology <br />if more than ono funding source is requested: <br />Park and median irrigation controller upgrades. <br />Ploaso doscribo why this project is needed, how it supports City-wido goals and <br />objectives, what realistic options or alternativos havo been considorod, and what payback, <br />or return on investment, has boon calculated: <br />The City of Louisville manages the water use at parks and medians through tho use of a <br />contrat control system. Contra) control enables the Irrigation manager to Input all changes <br />to watering schedules throughout the City through one computer. Tho City has close to <br />100 onste irrigation controllers. The central computer sends the data or schedule <br />changes to each onsite irrigation controller via a radio frequency. For example, shutting <br />off tho water In the City can be accomplished by ono simpto click versus the previous way <br />of having to make the change to each onsito controller. <br />The City bought Into the Sentinel Central Control System close to ton yoars ago. At tho <br />time, as a way to get into tho program more cost-effectively, Sontinol offered a retro -link <br />card option for use in currently owned controllers. This enabled the City to buy into tho <br />program without having to buy all now clocks. <br />As time has progressed the older clocks with the retro -link cards aro losing support from <br />Sontinol. Communication issues with those oldor clocks aro becoming more common and <br />solutions to remedy aro becoming less available. <br />The City has SO of these older clocks with retro -link cards. With the average cost of <br />approximately 65.000 this CIP program allows for tho roplacomont of 3 critical clock <br />replacements In 2016 and 10 clocks annualty for the remaining yoars until tho 50 aro <br />roplacod with all now Sontinol clocks. <br />Please provide a doscription of any grants and/or othor rovonuo associated with this <br />project and the ongoing operational and )maintenance costs associated with this project. <br />Maintenance costs should be minimized with new clocks. <br />1 gsw_y_s1 <br />J A <br />rem <br />Estimated Expenditure Schedule <br />quipmont or <br />Projoct Costs <br />Year 1 <br />2016 <br />Year 2 <br />2017 <br />Year 3 <br />2018 <br />Year 4 <br />2019 <br />Year 5 <br />2020 <br />ive -Year <br />Total <br />Beyond <br />5 Years <br />Land Acquisition <br />Design & Engineering <br />Other Prof Services <br />Construction <br />Other <br />Capital Equipment <br />- <br />- <br />- <br />- <br />- <br />15.000 <br />- <br />- <br />50.000 <br />- <br />- <br />- <br />- <br />- <br />50,000 <br />- <br />- <br />- <br />- <br />- <br />50,000 <br />- <br />- <br />- <br />- <br />- <br />50,000 <br />- <br />- <br />- <br />- <br />215,000 <br />- <br />- <br />- <br />- <br />- <br />35.000 <br />Total Project Costs <br />15.000 <br />50.000 <br />50,000 <br />50,000 <br />50,000 <br />215,000 <br />35.000 <br />Grant(s) or Other <br />Project Revenue <br />- <br />- <br />- <br />- <br />- <br />- <br />.Impact to Annual <br />MaintfOp Costs <br />- <br />- <br />- <br />- <br />- <br />- <br />Project Location Map, Equipment Identification Photo, or Other <br />Project or Equipment Description and Justification <br />Ploaso provido a general project description and include the cost allocation methodology <br />if more than ono funding source is requested: <br />Park and median irrigation controller upgrades. <br />Ploaso doscribo why this project is needed, how it supports City-wido goals and <br />objectives, what realistic options or alternativos havo been considorod, and what payback, <br />or return on investment, has boon calculated: <br />The City of Louisville manages the water use at parks and medians through tho use of a <br />contrat control system. Contra) control enables the Irrigation manager to Input all changes <br />to watering schedules throughout the City through one computer. Tho City has close to <br />100 onste irrigation controllers. The central computer sends the data or schedule <br />changes to each onsite irrigation controller via a radio frequency. For example, shutting <br />off tho water In the City can be accomplished by ono simpto click versus the previous way <br />of having to make the change to each onsito controller. <br />The City bought Into the Sentinel Central Control System close to ton yoars ago. At tho <br />time, as a way to get into tho program more cost-effectively, Sontinol offered a retro -link <br />card option for use in currently owned controllers. This enabled the City to buy into tho <br />program without having to buy all now clocks. <br />As time has progressed the older clocks with the retro -link cards aro losing support from <br />Sontinol. Communication issues with those oldor clocks aro becoming more common and <br />solutions to remedy aro becoming less available. <br />The City has SO of these older clocks with retro -link cards. With the average cost of <br />approximately 65.000 this CIP program allows for tho roplacomont of 3 critical clock <br />replacements In 2016 and 10 clocks annualty for the remaining yoars until tho 50 aro <br />roplacod with all now Sontinol clocks. <br />Please provide a doscription of any grants and/or othor rovonuo associated with this <br />project and the ongoing operational and )maintenance costs associated with this project. <br />Maintenance costs should be minimized with new clocks. <br />1 gsw_y_s1 <br />J A <br />rem <br />
The URL can be used to link to this page
Your browser does not support the video tag.