Laserfiche WebLink
N D D <br />EWIVERGINGIAMOND <br />I <br />T <br />NTERCHANGE <br />wo large constuction projects are starting soon. <br />Lafayette-Louisville Boundary Area <br />H <br />ave you driven the new Diverging Diamond <br />Improvements <br /> e interchange at US <br /> is project includes the installation of <br /> nished, but <br />storm water infrastructure in areas of <br /> e joint <br />downtown and east of Highway 42 that <br />project between Louisville, Superior, CDOT and RTD <br /> oodplain. <br /> e DDI <br /> c and residents on Spruce <br /> cantly reduce congestion problems along <br />Street from Highway 42 to the BNSF railroad tracks <br />McCaslin by eliminating designated left turns. It ac- <br /> rst, followed by construction on Front Street between <br /> c to <br />Pine Street and South Street. Construction is anticipated <br />the left side of the road through a two-phased signaled <br /> nish on Front <br />interchange. Cars turning left onto US 36 will no longer <br />Street in May 2016. <br /> c to stop before proceed- <br />ing onto the highway. <br />County Road Bridge Replacement - Construction <br /> e project also makes the bridge much safer for <br />plans for the new County Road Bridge are complete <br /> c by giving them a 12-foot <br />and construction is tentatively scheduled to begin in <br />wide path in the center of the bridge. Cyclists will also <br />the Spring. We thank everyone for your patience as we <br />have the option to use a designated bike lane. <br />worked through the Federal and State processes to get <br /> e project includes new "slip ramps" for RTD's <br />the bridge rebuilt at little cost to the City. <br />buses that cross under the McCaslin bridge directly to <br />We ask you for your understanding during construc- <br /> is addition will save the <br />tion and remind everyone to exercise caution when <br />average RTD bus roughly 3 minutes in commute time <br />driving, biking, or walking through a construction zone. <br />one-way. <br />If you have questions about these projects, please con- <br /> rst of <br />tact the Public Works Department at 303.335.4608 or <br />its kind on the front range, keeping our region on the <br />PWorks@LouisvilleCO.gov. <br />cutting edge of transportation technology. <br />T <br /> ese plans are using input <br />from the public to identify the communitys vision and goals for <br />visions and goals into development regulations including allowed <br />structure improvements and public spaces like parks and plazas. <br /> e South Boulder Road Plan is approaching completion … a draft plan, based on all the publ <br /> nement, and consider- <br />ation for adoption. Keep a look out for those meetings for your <br /> e McCaslin Boulevard Plan will have one more community workshop in early 2016 to review d <br /> e meeting will be advertised using signs around town and on the <br />web site. <br /> ank you to those who have participated in the process both by a <br /> e Citys online engagement platform has undergone some changes, <br />questions at www.EnvisionLouisvilleCO.com. You can stay up to da <br />Twitter @Plan4LsvlCO. Any questions or comments can be directed <br />303.335.4596 or ScottR@LouisvilleCO.gov. We want to hear from yo <br /> December 2015 3 <br />