My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historical Commission Agenda and Packet 2016 08 03 JT
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORICAL MUSEUM ADVISORY BOARD (pka HISTORICAL COMMISSION)
>
2006-2019 Historical Commission Agendas and Packets
>
2016 Historical Commission Agendas and Packets
>
Historical Commission Agenda and Packet 2016 08 03 JT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:08:19 PM
Creation date
8/16/2016 9:50:45 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
HCPKT 2016 08 03 JT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 12 of 150 <br />orientation and then go through to the back to the see the historic buildings, gardens, and <br />outbuildings." As a result of the CAP report's stated concerns with collections items being stored in <br />the Jacoe cellar, the Museum Coordinator, who was also hired in 2004, moved collections items <br />needing climate control and a higher level of protection from the cellar into the Jordinelli House. <br />• 2007 — A strategic planning session for the Museum and the Commission was conducted for the first <br />time. The resulting plan that the Commission adopted was especially helpful in terms of its SWOT <br />(Strengths, Weaknesses, Opportunities, and Threats) analysis and a list of goals for 2007-2008. <br />• 2008 — Louisville voters approved a dedicated city tax for historic preservation, creating the City's <br />Historic Preservation Fund. <br />• 2010 — Within the City's organization, the Museum was moved from the City Manager's Office to be a <br />division in the same department as the Library, with the new departmental name being changed to <br />the Department of Library & Museum Services. <br />• 2011- The City added a fire protection system and security system to the Museum. <br />• 2012 — The Museum Coordinator position was changed from a part time to a full time position, with <br />31 hours to be spent per week on Museum responsibilities and 9 hours per week paid out of the <br />Historic Preservation fund to be spent researching and writing about historic buildings for the <br />Planning Dept. and the public. The most important use of these reports in terms of their use by the <br />City administration is that they provide a factual basis on which the Historic Preservation Commission <br />and City Council can base decisions affecting the rights of Louisville property owners. <br />• 2013 — The Museum produced the 100th issue of The Louisville Historian. <br />• 2014 — Following how other city museums in the area are organized, and how the Library Board of <br />Trustees and the Louisville Public Library Foundation are organized, the fundraising role of the <br />Commission was separated from the role of the advisory board. The names of the nonprofit <br />corporation and 501c3 were changed to The Louisville History Foundation, Inc. The Foundation <br />became a private entity with its own bylaws and mission. The Historical Commission continued <br />serving as an advisory board to the City. <br />The Museum opened the Replica of Original Downtown Louisville, located in a room of the Jordinelli <br />House, to the public for the first time in 2014. <br />Funded by the City of Louisville in partnership with the Louisville History Foundation, Metcalfe <br />Architecture & Design ("Metcalfe") of Philadelphia conducted a Needs Assessment of the Museum. <br />This involved two visits and the organization of two public workshops designed to elicit input about <br />the future direction of the Museum. Metcalfe proposed the construction of a "Community House" <br />building and the renaming of the Museum to be the Louisville Visitor Center & Historical Museum. <br />The resulting Needs Assessment Report is a part of the Master Plan. <br />Through the City's funding of a cataloging intern, the Museum was able to begin digitizing photos and <br />established an online archive to include the County Assessor card images and photographs from the <br />Museum's collections. <br />• 2015 — The City added the position of a part time Museum Technician. The Museum began to use <br />PastPerfect, the museum cataloging software, to keep track of its nearly 700 paying membership <br />records. The Museum increased its hours and was opened to the public 15 hours per week during the <br />Fall/Winter and 20 hours per week during the Spring/Summer. Attendance at the Museum reached <br />2,913 for the year. Commission members began to attend meetings of other boards and commissions <br />to answer questions about, and garner support for, an expanded Museum campus and offerings. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.