Laserfiche WebLink
Page 60 of 150 <br />Project Cost Estimate <br />Following is a cost estimate for the project to create <br />a new campus for the Louisville Visitor Center and <br />Historical Museum. The estimate includes soft <br />and hard costs for design and construction of the <br />Community House, a range of renovations to the <br />Jordinelli and Tomeo Houses and the Jacoe Store. <br />It includes exhibit fabrication and installation, and <br />the relocation of the Summer Kitchen and Outhouse. <br />Altering the site to accommodate the new "Alley" and <br />access to all the buildings is also included in this <br />estimate. <br />These costs should all be regarded as conceptual. <br />The design phases ahead will articulate the actual <br />costs by determining building systems, materials <br />and finishes selected by the client and design team. <br />Many variables will be weighed to gain the maximum <br />value for the project. Factors including phasing <br />of the project, scope definition, site conditions, <br />LEED certification, in-kind donations of goods and <br />services, among many others, will all play a role in <br />bringing the cost higher or lower. <br />We anticipate that there will be significant <br />opportunities to raise capital outside of the <br />Louisville General Fund for important pieces of the <br />project. Some sources may focus exclusively on <br />museum exhibition projects. Others may support <br />only collections care and storage. Still others fund <br />historic preservation. We intend to research a wide <br />range of options, including the following: <br />• The Historic Preservation Commission <br />• Department of Local Affairs (DOLA) (a state <br />agency) <br />• Colorado State Historical Fund (SHF) <br />• The Institute for Museum and Library Services (a <br />Federal agency) <br />• The National Endowment for the Humanities (a <br />Federal agency) <br />The Louisville History Foundation will conduct a <br />capital campaign, seeking individual and corporate <br />donors to help support the project. <br />Project: Louisville Historical Museum <br />Number:14137E1 <br />Client: Metcalfe Architecture & Design <br />Date: December 1, 2014 <br />Phase: Feasability <br />ESTIMATE SUMMARY <br />BECKER & FRONDORF <br />Construction Cost Consulting • Project Management <br />CODE DESCRIPTION <br />5,175 SF <br />COST <br />New Construction <br />A New Construction - Community House <br />Total - New Construction <br />3,250 SF <br />$606 <br />$1,970,000 <br />$1,970,000 <br />Renovation <br />B Jordinelli House - 870 SF <br />C Jacoe Building - 1,320 SF <br />D Tomeo House - 750 SF <br />E Exterior Structures - Summer Kitchen/Outhouse <br />F <br />Sitework - General <br />Total - New Construction <br />Renovation Area <br />600 <br />1,200 <br />125 <br />SF <br />SF <br />SF <br />$380 <br />$460 <br />$448 <br />$228,000 <br />$552,000 <br />$56,000 <br />$20,000 <br />$229,000 <br />$1,085,000 <br />Total - Construction Hard Costs <br />$590 <br />$3,055,000 <br />Soft Costs/per Arch <br />Architecture Fees <br />Exhibit Design Fees <br />$2,275,000 10% <br />$780,000 25% <br />$227,500 <br />$195,000 <br />Total - Soft Costs <br />$422,500 <br />Total- RtujeOt <br />$3.477.50Q <br />Alternates: <br />New Sprinklers (Preaction) - Jordinelli House w/ A <br />New Sprinklers (Preaction) - Jacoe House w/ Attic <br />New Sprinklers (Preaction) - Tomeo House/no Atti <br />FP - Clean Agent/Premium @ all Houses/Allowano <br />1,520 <br />1,540 <br />750 <br />1 <br />SF <br />SF <br />SF <br />LS <br />Add <br />Add <br />Add <br />Add <br />$16,000 <br />$16,000 <br />$8,000 <br />$100,000 <br />Notes: <br />Hazardous material abatement & removal is not included. <br />Rock Excavation is not Included unless noted. <br />Permitting and fees are not included/per Arch <br />Utility connections beyond standard costs are not included/per Arch <br />The costs for sprinklers assume a fire line connection is available within 100' <br />Stormwater retention system is not included/per Arch <br />LEED certification is not included/per Arch <br />Costs are current, for Fall 2014; escalation is not included. <br />Page 1 <br />