My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2016 03 10
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2016 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2016 03 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:10 AM
Creation date
10/14/2016 8:45:28 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2016 03 10
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />February 11, 2016 <br />Page 4 of 18 <br />new Coal Creek Station development and the extension of Kaylix through the <br />Kestrel development, which includes the middle portion of Kaylix. The northern <br />portion extends through the RV Storage currently there. The City has an <br />easement through the Christopher Plaza development that would be turned into <br />a full street. Currently, the road at Steel Street goes into the North Main <br />Apartments as a right -in. Staff is proposing some modifications of the Main Street <br />intersection to turn it into a right -in / right -out. Drivers can get from Steel Ranch to <br />South Boulder Road without going out to Highway 42. There are dash lines which <br />represent connections that may not be public streets but private streets or public <br />easements through existing or new developments. They create an opportunity to <br />move through the corridor easier to get to these developments. <br />o Trail Improvements. Staff suggests new trails and sidewalk improvements which <br />include widening or improving the sidewalk along South Boulder Road and <br />Highway 42 where there is room. In some places, there is no room, especially <br />along the south side. Staff is proposing a new trail connection parallel to South <br />Boulder Road. For people not comfortable walking or riding a bike along South <br />Boulder Road, there will be a parallel connection to move east to west through <br />the corridor without having to be on South Boulder Road. Staff is proposing three <br />underpasses. Two are already planned; one on Highway 42 at the Kestrel/North <br />End development north of Hecla and one under the railroad at Bullhead Gulch <br />connecting Centennial Drive to Steel Ranch. A new third underpass is proposed <br />at Via Appia and Cottonwood Park to create a better connection across South <br />Boulder Road. Staff has looked at other places because the public mentioned <br />better crossings of South Boulder Road. The only place one would work was at <br />Main Street which involved the realignment of Main Street to line up with <br />Centennial. City Council directed Staff to not pursue this any further. Without the <br />Main Street realignment, there was no room to put in an underpass. <br />o Roadway Improvements. Staff is proposing to take out acceleration/deceleration <br />lanes and make other geometric improvements. We are putting in pedestrian <br />refuges in the center island to make it safer, easier, and more comfortable to <br />cross South Boulder Road. The Santilli property located the far southeast portion <br />of South Boulder Road is currently zoned commercial, and the plan has it <br />remaining commercial. It is long, narrow, and separated from other developments <br />in town, so it is not a great site for commercial development. I spoke with the <br />Open Space Advisory Board (OSAB) last night and brought this item up. They <br />said it does have potential for public land, whether as open space, other park <br />space, or some utility use with drainage improvements. OSAB will consider <br />putting it on their priority acquisition list. This South Boulder Road Plan says to <br />consider this land for open space acquisition if and when it becomes available <br />based on comments from OSAB last night. <br />o Building Heights. Three alternatives were 1 story, 2 story, and 3 story. The public <br />said they don't like the idea of 3 story buildings along South Boulder Road and <br />Highway 42. Staff is proposing 1 story buildings fronting the street with the option <br />of going to 2 stories if they meet certain conditions such as not creating <br />additional shadows on adjoining properties, not blocking views, meeting fiscal <br />performance requirements, and additional benefits to the public realm and design <br />benefits. <br />o Urban Design Elements. Staff presents a conceptual diagram of Village <br />Shopping Center showing what redevelopment could look like under the <br />proposed guidelines. Staff proposes a variety of building types and styles, active <br />pedestrian plazas, 10-20 foot setbacks, parking between buildings, views into the <br />development, wide sidewalks with landscaping, no consistent street wall, and a <br />mix of hard and soft landscaping. Staff presents a conceptual diagram of <br />
The URL can be used to link to this page
Your browser does not support the video tag.