Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />May 12, 2016 <br />Page 2 of 13 <br />Published in the Boulder Daily Camera on April 24, 2016. Posted in City Hall, Public Library, <br />Recreation Center, and the Courts and Police Building and mailed to surrounding property <br />owners and property posted on April 22, 2016. <br />Staff Report of Facts and Issues: <br />Lauren Trice presented from Power Point: <br />• Located in the CTC between Pierce Avenue and Taylor Avenue <br />• Property zoned Industrial (I) and required to follow the IDDSG <br />• 27% landscape coverage whereas 25% is required <br />• Four access points <br />• Two scenarios <br />o Warehousing with loading <br />o Office without loading (requesting parking waive <br />Parking Plan <br />Required <br />Proposed <br />Total <br />Warehousing With Loading <br />Office Without Loading <br />1 space per 1,000 SF (63 spaces) <br />4 spaces per 1,000 SF (250 spaces) <br />1.7 spaces per 1,000 SF <br />3.6 spaces per 1,000 SF <br />• Tilt -up concrete and board -formed concret <br />• Signs comply with IDDSG <br />• The applicant is requesting the following waiv <br />o The "office without loading" amount of 3. <br />a waiver from the IDDSG. Staff believes <br />recommends approval. <br />o The proposed landscaping <br />requesting a waiver to alto <br />request because it will reduc. . e <br />of the regulations. <br />Staff Recommendations: <br />Staff recommends Planning Commission move tprove Lots 6 & 10, Block 3, CTC 1 Final <br />PUD, Resolution No. 11, Series 2016. <br />106 spaces <br />228 spaces <br />ces per 1,000 square feet requires <br />ver request is acceptable and <br />except the applicant is <br />turf. Staff supports the <br />w' meeting the aesthetic intents <br />Commission Questions of Staff:: <br />Moline asks if someone can split the uses on this lot, would they have to do a lot split in order to <br />have warehousing on one side and office on the other side. <br />Trice says Staff has seen a combination of office and warehouse. They divide up the parking <br />requirements based on the square footage of office and square footage of warehouse. At tenant <br />finish, Staff would do parking counts. <br />Hsu says part of the IDDSG says you will have box -like structures, but don't make it look like a <br />box. Can you give me Planning Department's view of that requirement with this property? <br />Trice says on the rendering, there is articulation in the way the concrete is put on the facade. <br />Staff looks for fenestration as well as a variety of colors that break up the facade. <br />Applicant Presentation: <br />Keith Conrad, Powers Brown Architecture, 1580 Lincoln Street, Suite 400, Denver, CO <br />Home address: 1485 Foxtail Drive, Broomfield, CO <br />John Comunale, 1855 South Pearl Street, Suite 20, Denver, CO <br />I am representing the applicant tonight. To answer questions, in terms of how we are breaking <br />up the facade, we have a wide variety of projecting planes of the tilt -up concrete going in and <br />out. There are lots of reveals in and out and the same with the glazing. We have different paint <br />colors, different projected planes in and out, and the same with the fenestration. We recess it <br />