Laserfiche WebLink
Supplement to Exhibit C <br />Grain Elevator Stabilization Scope of Work <br />November 8, 2016 <br />Section New Description <br />3.1 Site 1A.1 Complete final rough grading to ensure drainage away from the <br />building, with the exception of the open excavation on the east side <br />of the building which shall be treated per structural and civil <br />engineering recommendations, and any open foundation areas on <br />west side of building which shall be protected from weather. <br />Foundations on east side of building shall have a minimum of 12" <br />of soil cover with compaction and slope bottom of excavation <br />away from foundations for a minimum of 4 feet from the building. <br />3.1 Site 1A3 Perimeter Drain Removed from Scope of Work <br />3.1 Site 5 (NEW) <br />3.1 Site 6 (NEW) <br />Installation of 6 foot decorative fence (Freedom Standard Sheffield <br />Black Aluminum Decorative Fence Panel, 6' x 6', or similar) on <br />west portion of site and 6 foot chain link fence on east portion of <br />site as shown on attached map. Alternate, on west portion of site <br />provide 6' high cedar privacy fence, painted to match the building. <br />Area to be reseeded as shown on attached map (not eligible for <br />reimbursement). Metal storage shed and dead vegetation to be <br />removed (not eligible for reimbursement). All outside trash and <br />excess dirt to be removed from Site. <br />3.2 Foundations 1A.5 Removed from Scope of Work (Spread footings not needed for <br />stabilization of Structure) <br />3.2 Foundations 1A.6 Removed from Scope of Work (Spread footings not needed for <br />stabilization of Structure) <br />3.7 Interior Finishes 1A.3 Removed from Scope of Work (not necessary for stabilization) <br />ALL SCOPE OF WORK ITEMS TO BE COMPLETE BY NOVEMBER 30, 2016. <br />