Laserfiche WebLink
Historic Preservation Commission <br />Meeting Minutes <br />November 21, 2016 <br />Page 7 of 20 <br />PROPOSED EAST ELEVATION <br />Paoli <br />IQML <br />Eon <br />EEI <br />Can <br />IEN'PI/ORIC O BLU <br />MON <br />PROPOSED SOUTH ELEVATION <br />MOIL <br />orialimg <br />ADDITION <br />ltaT 0160.1111 UN. <br />fau <br />4111.11161, maw. <br />MEW pi Mlle RIO <br />R1Yi <br />• Addition setback torear of the lot <br />• Minimal visual impact from Lincoln Avenue <br />• Height of addition distinguishes it from existing structure <br />• Architectural details on addition: <br />o Columns are simplified <br />o Wood shingles are a slightly different shape <br />o Turned eaves are larger <br />o Shiplap and lap siding have the same exposure <br />GRANT REQUEST <br />• Foundation/Crawlspace - $2,700 <br />• Floor construction - $800 <br />• Roof construction - $1,200 <br />• Exterior walls (repair and replace siding)- $3,000 <br />• Exterior windows (replace all windows) - $8,000 <br />• Exterior door (replace front door) - $2,000 <br />