My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Adjustment Agenda and Packet 2016 12 21
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BOARD OF ADJUSTMENT
>
2001-2019 Board of Adjustment Agendas and Packets
>
2016 Board of Adjustment Agendas and Packets
>
Board of Adjustment Agenda and Packet 2016 12 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:03:13 PM
Creation date
12/30/2016 11:52:29 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
BOAPKT 2016 12 21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Adjustment <br />Meeting Minutes <br />November 16, 2016 <br />Page 4 of 12 <br />Dillon Road to the north, Coal Creek Circle to the south and southeast, US 36 to the <br />south <br />Proposal to add 40,000 SF addition to existing 120,500 SF office <br />Proposal also includes expansion of the parking to the northeast <br />Flood Regulatory District (100 year floodplain) is the blue areas (floodplain and <br />floodway) and any building expansion requires a floodplain development permit. <br />Turquoise area is the floodplain. Dark blue area is the floodway and water course with <br />higher set of regulations. The proposal is not within the floodway but within the greater <br />area of the floodplain. <br />Parking and landscaping improvements in floodplain do not require a floodplain <br />development permit. Requested parking expansion is in the floodplain and is allowed <br />under code. <br />Proposing reconfiguring some parking drive aisles and aping throughout the site <br />1 111 I <br />A, • \ CEM CREEK CIRCLE __ <br />RgEown <br />LOT 2 <br />;.99 RC <br />RE EMS <br />bo 6hT <br />-DETI <br />P <br />PROEM U. <br />kOr <br />r/ <br />Applicant will apfor a -Planned Unit Development (PUD) and amended plat as part of <br />this development. Those reviews go to Planning Commission and City Council. <br />This is the first stop in the review process. If the floodplain development permit is <br />aapproved, they can proceed with the PUD and amended plat proposal. <br />City's currently adopted floodplain regulatory map is from the December 18, 2012 Flood <br />Insurance Rate Map (FIRM). <br />There is another study called 2014 Flood Hazard Area Delineation (FHAD) study for the <br />area with updated, newer, updated information that will eventually replace the FIRM . <br />Staff has asked the applicant provide an analysis of both sets of data from FIRM and <br />FHAD to make sure under both sets of data, it is meeting our regulations. <br />Black dotted line is outer extent of floodplain and solid black line is the floodway based <br />on the FIRM <br />Yellow and orange lines are FHAD. We think the floodplain will turn into this area once <br />FEMA has an opportunity to adopt it. <br />The proposed addition will be within the FHAD. <br />Applicant has provided another line (pink and orange) which is the estimated existing <br />floodplain based on the FHAD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.