Laserfiche WebLink
..111111110111111111111101 <br />AVISTA ADVENTIST HOSPITALPOB <br />II/ASC <br />FINAL PUD APPLICATION <br />4 4 q 1 <br />i i 1 1i <br />ILLUMINATED BUILDING <br />LOGO Sc SIGNAGE (TO <br />BE COORDINATED W/ <br />CAMPUS SIGNAGE PLAN) <br />i <br />• <br />• <br />EXISTING BUILDING <br />BEYOND <br />TIT <br />Ui <br />LINE OF EXISTING BUILDING <br />IN FOREGROUND <br />CONNECTOR LINK TO <br />EXISTING BUILDING <br />- ____--- <br />OVERFLOW <br />SCUPPER <br />NORTHEAST ELEVATION <br />3132" = 1'-0" <br />STEEL BRAC FRAME <br />ATION <br />T.O. MECHANICAL-`3GREE <br />ELI 1351-0" <br />T_0._MASONRY <br />ELI 12b' -b" <br />T.O. <br />2ND FLOOR 5— <br />EL� 113'-4" <br />IST FLOORS <br />EL+ 100'-O" <br />BASEMENT O. SLA5 -4. <br />ELI 8b'-0" <br />T.O. MECHANICAt` it <br />ELI i35' -v" <br />>I... - — <br />_ ?.O _MA�30_NRY <br />ELI 128'-5" <br />8 <br />2ND FLOOR T.O. <br />ELI i43'-4" <br />-010.1.0011 <br />1,00.1.710.0000, <br />J <br />141 <br />MATERIAL NOTES <br />GK COLOR 1 - ROBINSON "IMPERIAL 30 GRAIN" - TO <br />81 <br />MATCH EXISTING BUILDING <br />COURSE <br />515 BRICK COLOR 1 SOLDIER"CANYON ROSE" - TO MATCH <br />82 BRICK COLOR 2 - SUMMIT <br />EXISTING BUILDING <br />BRICK COLOR 2 ROWLOCK COURSE <br />BRICK COLOR 2 SOLDIER COURSE <br />BRICK COLOR 3 CLALITE "PARK ROSE" - TO MATCH <br />EXISTING BUILDING TO MA -I -GH EXISTING <br />54 BRICK COLOR 4 - ACCENT TILE - <br />BUILDING <br />52R <br />525 <br />53 <br />T1T <br />Ilj <br />SOUTH <br />3/32" = 1'-0" <br />I <br />NEST ELEVATION <br />CONCRETE COLUMN - COLOR * FINISH TO MATCH N'OSPITAL <br />CI CANOPY COLUMNS <br />5S # ALUMINUM STOREFRONT SYS. - BRONZE ANODIZED <br />AL <br />GI GLUM. W/ GREEN GLASS - TO MATCH EXISTING BUILDING <br />TUBE STEEL CANOPY WI METAL ROOF - PAINTED GREEN <br />Ml LOR TO MATCH HOSPITAL CANOPY <br />PAINTED TO MATCH Bl <br />M2 METAL DECK MEGHANIGA � OR TO MATCH 52 <br />REEN - <br />M3 METAL CAP FLA51-TING <br />1ST FLOOR T.O. SLAB <br />EL: 100'-0" <br />- Sggg MENT T^O. 5 <br />ELI bb' -0" <br />KEY PLAN <br />A.S.G. <br />2301 BLAKE ST., STE. #100 <br />DENVER,03.861555 F..3� COLORADO 021.3 <br />5 <br />3 7 <br />0137 MAIN STREET . UNIT C106 <br />POST OFFICE BOX 2711 <br />E30.926 8960 F.970.926.89613 <br />2 <br />9 <br />S <br />I,u'i'''i„,„„„„n,,Inail <br />CHARLES KEIM& ASSOCIATES, INC <br />Consulting Engineers <br />1711 15TH ST., SUITE 200 <br />BOULDER, CO 80302 <br />303.447.0090 F 303.447.9141 <br />2620 East Prospect Road, Suite 100 <br />Fort Collins, Colorado 80525 <br />ISSUE/REVISION <br />FINAL PUD SUBMITTAL <br />REFERRAL COMMENTS <br />BOUNDARY REVISION <br />(970) 493-8747 <br />(303) 296-0383 <br />DATE <br />3/21/02 <br />5/7/02 <br />7/26/02 <br />NO. <br />AVISTA ADVENTIST <br />HOSPITAL <br />100 HEALTH PARK DR. <br />LOUISVILLE, CO <br />CENTURA HEALTH <br />PUD APPLICATION <br />BUILDING ELEVATIONS <br />DRAWN BY <br />CHK'D BY <br />SHEET FILE <br />COPYRIGHT 2000 BY DAVIS PARTNERSHIP P.C. <br />CEW <br />SHEET NUMBER: <br />D.P.A.4 OF 12 <br />PROJECT # <br />