My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revitalization Commission Agenda and Packet 2017 01 09
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
REVITALIZATION COMMISSION
>
2004-2019 Revitalization Commission Agendas and Packets
>
2017 Revitalization Commission Agendas and Packets
>
Revitalization Commission Agenda and Packet 2017 01 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:20:27 AM
Creation date
1/11/2017 9:24:20 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
RCPKT 2017 01 09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ILZ + ity4}fLDepartment of Planning and Building Safety <br />Q �' tl e 749 Main Street • Louisville CO 80027 • 303.335.4592 • www.louisvilleco.gov <br />COLORADO- SINCE tti74. <br />MEMORANDUM <br />To: Louisville Revitalization Commission <br />From: Department of Planning and Building Safety <br />Subject: Wayfinding Update <br />Date: January 9, 2017 <br />As part of the Small Area Plan processes, the City has been working with <br />ArtHouse Design to engage the community and develop a draft wayfinding plan. <br />An initial draft of the program is attached. Staff's intent is to review this draft with <br />City Boards and Commissions before bringing a final proposal back to City <br />Council. <br />Design <br />ArtHouse Design presented three sign "families" to the community during the <br />Small Area Plan process. The attached draft sign package is in response to the <br />public comments. ArtHouse Design also collaborated with designer for the Open <br />Space, Parks & Trails Wayfinding Plan to ensure the designs were compatible. <br />Approved Funding for Wayfinding <br />The 2016 budget includes funding for fabrication and installation of an initial <br />phase of sign installation. Based on the approved budget and cost estimates, <br />staff developed a Phase I implementation plan. Draft location plans for Phase I <br />along with the full draft sign package (Phase I and II) are attached. <br />Questions for HPC <br />1. Are there any concerns regarding the proposed Phase I sign locations? <br />2. Are there any additional locations that the LRC would recommend? <br />Attached: <br />1. Draft Location Plan & Sign Package <br />2. Supplemental Renderings <br />
The URL can be used to link to this page
Your browser does not support the video tag.