My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Business Center at CTC Lot 1 Block 2 PUD Mylar
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
PUD (Planned Unit Developments)
>
C
>
CTC - Business Center at
>
Business Center at CTC Lot 1 Block 2 PUD Mylar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 2:37:29 PM
Creation date
3/28/2017 1:10:08 PM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Mylar
Ord/Res - Year
1998
Ord/Res - Number
49
Recordation Number
1966955
Subdivision Name
Business Center at CTC
Signed Date
8/2/1999
Parcel Identification Number
157516011001
Cross-Reference
PC Res 1998-36
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />4 <br />PLANTING DETAILS <br />re.4111V <br />SPECIFIED POSTS. 2 EA. 8' MT. ALIGN AS APPROVED. KEEP FURR! WITH TOPS EVEN. <br />�- DRIVE 3' BELOW GRADE OUTSIDE PLANTING PIT. REMOVE ArTEK <br />ONE GROWING SEASON. ON TREES GREATER THAN 3' CAL. USE GUYS <br />AS PER EVERGREEN TREES. <br />WRAP ENTRE SURFACE OF TRUNK UP TO BRANCHES WITH REQUIRED WRAPPING. <br />WHEN SPECIFIED. REFER TO SPECIFICATIONS. <br />SECURE • TOP WITH DUCT TAPE. <br />L T 1 , <br />BLOCK I <br />1 <br />1 <br />I <br />1 <br />i <br />I <br />1 <br />•I <br />1 <br />1 <br />1 <br />1 <br />I <br />1 <br />/ <br />I <br />1 <br />1 <br />I <br />/ <br />/ <br />1 <br />1 <br />i <br />1 <br />1 <br />I <br />i <br />/1 <br />/ 1 <br />I <br />1 <br />/ I <br />1 <br />1 <br />1 <br />1 <br />\ 1 <br />1 S <br />30' <br />i\ <br />i\ <br />)If <br />II I <br />Nn <br />w <br />0 <br />(5)tltr <br />IMPROVEMENT <br />a �z <br />0 <br />(4)E,la <br />Acgl <br />uch <br />ll <br />0 <br /><14)Coac <br />STEEL EDGE (TYP) <br />(3)Pipo <br />LOT 2, BLOCK 2 <br />(3)Fram <br />TURF (5)Pipo <br />(BUILDING LONG AXIS PARALLEL TO NORTH PROPERTY LINE) <br />FF = 5334.00 <br />II <br />LOT 6, EL % OK 2 <br />iI <br />II <br />II <br />\V\\\\\\\\\\\\\\.\\\\:0\.\\\\\\ <br />(4)Spbu <br />3)JusaB <br />(9)Eual <br />3)JusaB <br />`=-'yIt-(3)Acgt <br />II <br />II <br />+II <br />ITURF <br />II <br />1 <br />(€ Spbu .... <br />(4)JuchG---, <br />(13)rofr <br />(5)Eual <br />LOT 1 <br />52,142 SQ. FT. <br />STONE W/FABRIC <TYP) <br /><3; pbu <br /><4:,Euk,, <br />(5)Spbu <br />(3)Eual <br />r <br />.L EDGE iCTY <br />:;SION ,TR*ANG1 <br />LOT 1n. EL <br />7777777777777777777777 <br />DO NMT GUT LEADER. PRUNE DAMAGED OR DEAD WOOD AFTER <br />PLANTING AND STAKING. KEEP CROWN SHAPE TYPICAL Of SPECIES. <br />12 GAUGE GALV. WIRE <br />WITH 1/2' DIA X W WMITEVG PIPE ON EACH WIRE. <br />SPECIFIED TREE STRAP COLLAR. DO NOT TWIST. <br />4' DEPTH SPECIFIED MULCH. INSIDE 4' WATERING SAUCER. <br />REMOVE SAUCER UPON SODDING/SEEDING N IRRIGATED AREAS. <br />PLANT TREE 2-4' ABOVE SURROUNDING GRADE LEVEL ON UNDISTURBED SOL. <br />SET TRUNK PLUMB. <br />SPECIFIED BACKFILL MIXTURE. AMENDMENTS AS sPEGrED N TOP 12' DEPTH. <br />REMOVE <br />BALL.�RLMOVEEWARE BASKETS TOP 1/3 WHEN PRALL.ESENUT BURLAP mom TOr <br />INITIAL STAOLIZING SACKFUL 1/3 DEPTH. COMPACTED. <br />UNDISTURBED PIT BOTTOM row ROOT BALL BASE. <br />DECIDUOUS TREE PLANTING <br />NOT TO SCALE <br />Ham <br />GUYING DET/IA <br />3/4' SETBACK <br />EXISTING BUILDING <br />CONCRETE CURB. EDGING OR SIDEWALK. <br />PRUNE ALL DAMAGED OR DEAD <br />WOOD AFTER <br />PLANTING AND MULCHING <br />SET SHRUB AT GRADE GROWN N CONTAINER OR <br />GROWN IN NURSERY. SET TOP OF JUNIPER'S ROOTBALL TO <br />PNISN GRADE OF MULCH. <br />APPLY SPECIFIED MU.CM <br />AT 4' DEPTH OVER LANDSCAPE rABRIG. <br />SPECIFIED LANDSCAPE FABRIC UP TO DANES/TRUNK. <br />SCORE CONTAINER ROOTBALLS WITH CNCRCUNG ROOTS. <br />FLL PLANT PIT WITH SPECIFIED OAGKrLI <br />MX. SCE SPECIrIGATONs FOR COMPOSITION. <br />REMOVE CONTAINER. PLACE ROOTBALL ON <br />UNDISTURBED SOIL. <br />NOTE' <br />DO NOT PLANT ANY PLANT WITH ROOTBALU. NOT 14 CONFORMANCE <br />WITH COLORADO NURSERY ACT REQUIREMENTS. <br />MOLD MULCH GRADE 1' OCLOW EDGE Of WALK. EDGING OR CURD. <br />SHRUB PLANTING <br />NOT TO SCALE <br />n <br />NORTH <br />THE PARK <br />AT C.T.S. <br />(5)Plsy <br />LANDSCAPE PLAN <br />UD6 '„ = 30,_0„ <br />CADFILE: 9809LSCP <br />SCALE: 3 " = 30' <br />0 30 60 90 <br />DO NOT PRUNE LEADER. PRUNE AU. BROKEN AND DEAD <br />BRANCHES AFTER P.ANTNG AND MULCHING. PRUNE,;TO <br />TYPICAL rani OF SPECIES. DO NOT PRUNE UP LOWER BRANDIES. <br />sPECWED TRUNK COLLAR ATTACHMENT. HEAVY DUTY. DO NOT TWIST. <br />-SPECIrEP WIRE GUY PROVIDE 3 • EQUIDISTANT AROUND TREE. <br />II KEEP CLEAR OF BRANCHES TO PREVENT RUB DAMAGE. <br />I STAKES AND GUY AS PER DECIDUOUS TREES PETAL <br />I I <br />SPEGIrIED MULCH. 4' DEPTH. <br />SPECIFIED STAKES AT 4' WATERING SAUCER DRIVEN <br />FLUSH WITH GRADE. 24'. 3 PCR TREE. REMOVE SAUCER UPON <br />SEEDING OR SODDING N IRRIGATED AREAS. <br />PLANT W/TOP OF ROOT BALL 2-4' HIGHER THAN <br />SURROUNDING GRADE LEVEL 14 IRRIGATED AREAS. <br />SPECIFIED BACKFLL MIXTURE. ADMENDMENTS AS SPEGFED N TOP <br />BALL DIA. • 24' \ 12' DEPTH. NTIAI. STABLIZING BAGKR.L., 1/3 DEPTH. COMPACTED. <br />SET ROOT BALL ON EXISTING UNDISTURBED SOIL. <br />DIG PLANT PIT 24' WIDER THAN ROOTBALL. REMOVE TWINE <br />AND BURLAP FROM TOP 1/3 or BALL. REMOVE ALL WIRE BASKETS <br />20' BELOW TOP of BALL. <br />NOTE. GUYING AND STAKING TO BE REMOVED ATTER one GROWING SEASON. <br />EVERGREEN TREE PLANTING <br />NOT TO SCALE <br />PLANT SChtEDULE <br />Symbol Code Scientific Name <br />IShrubs <br />Coac Cottoneaster apiculatus <br />OEual Euonymus alatus 'Compacta' <br />0 JuchG Juniperus Chinesis 'Pfitzerana Glauca' <br />OJusaB Junperus sabina 'Broadmoor <br />ITrees <br />• <br />I Perennials <br />Pofr Potentilia Fruticosa 'McKay's' <br />Spbu 5piraea bumalda <br />Acgl Acer Glabra <br />Pram Fraxinus americana <br />Gltr Gledtisia Triacanthos 'Inermis' <br />Pipo Pinus ponderosa <br />Pisy Pinus Sylvestris <br />0 Day ttemerocalis 5p. <br />Common Name <br />Peking Cottoneaster <br />Dwarf Burning Eush <br />Slue Pf itzer <br />Broadmoor Juniper <br />McKay's Potentila <br />&maid spirea <br />TYPE* Size Quantity <br />D 5 -Gal 28 <br />D 5 -Gal 53 <br />E 5 -Gal 14 <br />E 5 -Gal 24 <br />D 5 -Gal 20 <br />D 5 -Gal 31 <br />Rocky Mt. Maple D 1.5' -Gal 11 <br />White Ash D 2.5' -Cal 7 <br />Comon Honeylocust D 2.5' -Cal 8 <br />Ponderosa Pine E G' 17 <br />Scotch Pine E 6' 5 <br />Daylily <br />+ P. DECIDUOUS EsEVERGREEN 737. DECIDUOUS 277. EVERGREEN. WOODY PLANT MATERIAL <br />TURF GRASS NOTES <br />ALL SOD TURF AREAS SHALL CONSIST OF A TURF TYPE TALL FESCUE BLEND THAT IS LOCALLY GROWN. <br />PLANTING NOTES <br />1 -Gal 25 <br />1. ALL TOP SOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 6' AND STOCK PILED PRIOR TO CONSTRUCTION. <br />FOLLOWING ROUGH GRADING. TOP SOIL SHALL BE REDISTRIBUTED IN LANDSCAPE AREAS INCLUDING PUBLIC -RIGHT -OF <br />WAY. TOP SOIL SHALL BE FREE OF ALL DEBRIS. <br />2. ALL TOP SOIL SHALL BE AMENDED WITH COMPOST AT A RATE OF 3 CUBIC YARDS PER THOUSAND SQUARE FEET <br />OF LANDSCAPE ARCA. COMPOST SHALL BE MECHANICALLY INTEGRATED INTO THE TOP 6' OF SOIL USING TILLER OR <br />RIPPER TEETH EQUIPMENT. <br />3. ALL SHRUB BED AREAS SHALL Be EDGED WITH STEEL EDGING. ALL EDGING SHALL OVERLAP AT JOINTS A MINIMUM <br />OF 6 -INCHES. ALL EDGING SHALL BE FASTENED WITH A MINIMUM OF 4 PINS/10FT SECTION. <br />4. ALL SHRUB BED AREAS SHALL Be MULCHED W/ ASPEN WOOD CHIPS TO A MINIMUM DEPTH OF 3-0'1CHES. THE CONTRACTOR <br />SHALL INSTALL A WEED BARRIER FABRIC ANCHORED W/GROUND STAPLES. UNDER ALL MULCH (PHILLIPS 66 DUON OR EQUAL) <br />STONE COBBLE AREAS SHALL BE 4-6' DIA WASHED RIVER ROCK W/ SPECIFIED WEED FABRIC <br />5. ALL TREES PLANTED IN LAWN AREAS SHALL HAVE A 3 -FOOT DIAMETER MULCH RING. MULCH SHALL CONSIST OF A 3 -INCH <br />DEPTH OF ASPEN MULCH OR EQUAL. <br />6. ALL TURF GRASS. TREES. SHRUBS. + FLOWERS SHALL BE IRRIGATED BY AN AUTOMATIC IRRIGATION SYSTEM USING <br />SPRINKLER AND DRIP EMITTERS AS REQUIRED TO ADEQUATELY SUPPLEMENT MOISTURE REQUIREMENTS. <br />7. ALL PLANTING PITS SHALL BE 1.5 - 2 TIMES THE WIDTH OF THE PLANT ROOT SALL WITH SCARIFIED WALLS. THE BACKFILL SOIL <br />SHALL CONSIST OF A MINIMUM OF 1/3 PEAT MOSS OR OTHER ORGANIC MATTER HOMOGENEOUSLY MIXED INTO BACKFILL <br />ALONG WITH OSMOGOTE 14-14-14 FERTILIZER AT A RATE PER MANUFACTURE'S RECOMMENDATION. <br />5. NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE MADE WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. <br />q. ALL TREES SHALL BE STAKED WITH NEW 6 -FT GREEN STEEL 'T' POSTS AND GUYED WITH *12 GALVANIZED WIRE <br />THROUGH CANVAS TREE STRAPS FOR A MINIMUM OF 1 YEAR. THE CONTRACTOR MAY SUBSTITUTE 'T' POSTS WITH <br />'DUCK BILL' GUYING SYSTEM. ALL GUY WIRES SHALL BC FLAGGED WITH FLORESCENT TAPE 12-18 INCHES LONG FOR SAFETY. <br />10. ALL TREES. SHRUBS. PERENNIALS. SOD. AND/OR SEED AREAS SHALL BE GUARANTEED TO REMAIN ALIVE AND HEALTHY <br />FOR A 24 MONTH PERIOD AFTER FINAL ACCEPTANCE. PRPLACEMENTS SHALL BE GUARANTEED AN ADDITIONAL 12 MONTHS. <br />ALL REPLACEMENT COSTS SHALL BE BORN BY THE CONTRACTOR. <br />11. THE CONTRACTOR SMALL BE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING. IT IS FURTHER RECOMMENDED <br />THE CONTRACTOR TEST SOILS TO ENSURE NO CONTAMINATION IS PRESENT. VERIFY STATIC WATER PRESSURRE <br />FOR IRRIGATION SYSTEM REQUIREMENTS. AND REVIEW PLANS FOR CONFLICTS. ANY AND ALL CONFLICTS WITHOUT <br />EXCEPTION. SHALL BE REPORTED TO THE LANDSCAPE ARCHITECT IMMEDIATELY. <br />12. ALL PLANT MATERIALS SHALL BE TRUE TO TYPE. SIZE. SPECIES. QUALITY, AND FREE OF INJURY. BROKEN ROOT BALLS. <br />PESTS. AND DISEASES. AS WELL AS CONFORM TO THE MINIMUM REQUIREMENTS DESCRIBED IN THE 'AMERICAN STANDARD FOR <br />NURSERY STOCK'. <br />13. ALL LANDSCAPE CONSTRUCTION PRACTICES. WORKMANSHIP. AND ETHICS SHALL AT A MINIMUM, BE IN ACCORDANCE WITH T <br />INDUSTRY STANDARDS SET FORTH IN THE HANDBOOK FOR LANDSCAPE CONTRACTORS PUBLISHED BY THE COLORADO LANDSCAPE <br />CONTRACTORS ASSOCIATION. <br />14. ALL WIRE BASKETS. CONTAINERS. AND ROPE SHALL BE REMOVED FROM THE ROOT BALL PRIOR TO PLANTING. BURLAP <br />SHALL BE PULLED DOWN FROM AROUND THE TOP OF THE ROOT BALL AND TUCKED DOWN INTO THE PLANTING PIT. <br />15. THE CONTRACTOR SHALL VERIFY THE LOCATION OF AND PROTECT ALL UTILITIES AND STRUCTURES PRIOR TO AND DURING <br />WORK. DAMAGE TO UTILITIES AND STRUCTURES SHALL BC REPAIRED BY THE CONTRACTOR AT THE EXPENSE OF THE <br />CONTRACTOR TO THE SATISFACTION OF THE OWNER. <br />16. DECIDUOUS TREES SHALL NOT BE PLANTED CLOSER THAN 5 -FEET TO STREET ROW AND CONIFEROUS TREES NO <br />CLOSER THAN 10 -FEET TO STREET ROW LINES OK PUBLIC IMPROVEMENTS CIE; SIDEWALKS. CURB, AND GUTTER). <br />17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY GLEAN -UP OF DIRT AND DEBRIS SPILLED ON TO ANY PAVED <br />SURFACES OR PUBLIC ROW. <br />15. PRIOR TO SEEDING OR SODDING THE CONTRACTOR SHALL RAKE SMOOTH OR OTHERWISE LOOSEN THE SURFACE TO <br />OBTAIN A SMOOTH FRIABLE SURFACE FREE OF EARTH CLODS. LUMPS. AND DEPRESSIONS. LOOSE STONES HAVING <br />A DIMENSION GREATER THAN 1/2 -INCH AND DEBRIS BROUGHT TO THE SURFACE DURING CULTIVATION SHALL BE REMOVED ' <br />AND PROPERLY DISPOSED or BY THE CONTRACTOR OFF-SITE. <br />19. ALL SEED SHALL BE APPLIED WITH HYDROMULGH PROCESS. HYDROMULCH AND SEED MIX SHALL BE APPLIED UNIFORMLY. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SUPPLEMENTAL IRRIGATION. REPAIR OF EROSION AREAS AND <br />MAINTENANCE OF SEED AREAS FOR ONE GROWING SEASON OR UNTIL ESTABLISHED. <br />20. PRIOR TO PLANTING ANY PLANT MATERIALS. THE CONTRACTOR SHALL FIELD LOCATE THE PLACEMENT OF ALL PLANT <br />MATERIALS USING WOODEN STAKES. FIELD LOCATED PLANT LOCATIONS SHALL BC REVIEWED AND APPROVED BY THE <br />LANDSCAPE ARCHITECT PRIOR TO EXCAVATION OF PLANTING PITS. APPROVAL Of PLANT LOCATIONS DOES NOT RELEASE <br />THE CONTRACTOR FROM LIABILITY OF DAMAGE OR INJURY TO UTILITIES. STRUCTURES. OR PERSONS ON SITE. <br />21. THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT ONE WEEK PRIOR TO BEGINNING CONSTRUCTION. <br />22. THE LANDSCAPE ARCHITECT SHALL NOT BE RESPONSIBLE FOR DELAYS. PERSONAL INJURIES. PLANT MORTALITY. OR <br />PROPERTY DAMAGE RESULTING FROM OR ASSOCIATED WITH THE IMPLEMENTATION OF THIS PLAN. <br />23. THE ENGINEER IS RESPOSIBLE FOR ALL ASPECTS OF THE SITE GRADING. DRAINAGE. AND SITE PLAN DETAILS. <br />24. THE LANDSCAPE ARCHITECT HAS NOT BE CONTRACTED FOR CONSTRUCTION OBSERVATION SERVICES AND THEREFORE <br />CANNOT GAURANTEE THE OUTCOMES OR IMPLEMENTATION OF THE LANDSCAPE PLAN <br />CERTIFICATION <br />THIS LANDSCAPE PLANTING PLAN WAS PREPARED BY ME OR <br />UNDER MY PERSONAL SUPERVISION AND I AM A DULY REGISTERED <br />LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF WISCONSIN. <br />BY' DATE' <br />THOMAS E. KUPCHO. RLA. WISCONSIN REG. NO. 201 <br />• land Pig <br />• Urban Design <br />• landsatpeArehthecture <br />• land Use & Zoning <br />I N C <br />i W. MAIN Snuff, &Erg 203 s Lerusieg. C8tai8 30120 <br />Phone (3031734-1777 • Fax (303)7341778 <br />u <br />S <br />ccoo <br />V <br />C <br />C <br />E <br />L <br />C <br />C <br />130 <br />C <br />8 <br />w <br />Z <br />w0 <br />QV <br />0J <br />0 <br />J <br />FOR APPROVAL BY PLANNING COMMISSION <br />REV. PER CITY <br />Designed <br />Chocked <br />Roviowed <br />Dots <br />TK <br />TK <br />KD <br />KD <br />05/05/98 <br />Project No. <br />98009 <br />Drawing No. <br />PUD -INITIAL SUBMITTAL <br />FUD G <br />3 <br />of <br />LANDSCAPE <br />m <br />m <br />3Nt1 IUI-NO-1NINd 303963 NOHTSOd <br />-POSITION EDGE Of PRINT ON THIS LINE <br />8VSLO 8380111N A8 830803E1 <br />dVQL0 EI38NI1N A8 830803E1 <br />IiVBL0 83811,1f1N A9 8313803E1 <br />0 <br />I <br />3 <br />i <br />8VSLO 838N11N A8 830803E1 <br />VIN110311V0 `3NIAUI • <br />
The URL can be used to link to this page
Your browser does not support the video tag.