My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Business Center at CTC Lots 15 16 17 Block 1 Pearl Izumi Amended PUD Mylar
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
PUD (Planned Unit Developments)
>
C
>
CTC - Business Center at
>
Business Center at CTC Lots 15 16 17 Block 1 Pearl Izumi Amended PUD Mylar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:10:17 AM
Creation date
3/30/2017 2:25:45 PM
Metadata
Fields
Template:
CITYWIDE
Also Known As (aka)
Pearl Izumi
Doc Type
Mylar
Ord/Res - Year
2012
Ord/Res - Number
69
Recordation Number
3294039
Subdivision Name
Business Center at CTC
Signed Date
3/1/2013
Parcel Identification Number
157516010026
Cross-Reference
PC Res 2012-19
Shimano Pearl Izumi
101 Taylor Ave
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
3/30/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CTC LOT 14 <br />CONCRETE <br />SIDEWALK <br />CONNECTION TO <br />EXISTING TRAIL <br />55' LANDSCAPE <br />AND OPEN <br />SPACE <br />CONSERVATION <br />EASEMENT <br />LOT 15 <br />SITE AREA: 43,507 sf <br />SITE W/O EASEMENT: 36,725 sf <br />UTILITY EASEMENT: 6,782 sf <br />LANDSCAPE COVERAGE W/O EASEMENT: 19,095 sf <br />TOTAL LANDSCAPE COVERAGE/OPEN SPACE: 25,877 sf <br />LOT 16 <br />SITE AREA: 151,856 sf <br />1 SITE W/O EASEMENT: 131,424 sf <br />OPEN SPACE EASEMENT: 20,432 sf <br />LANDSCAPE COVERAGE W/O EASEMENT: 75,322 sf <br />TOTAL LANDSCAPE COVERAGE/OPEN SPACE: 95,754�- <br />1 <br />1 <br />1 <br />1 <br />ACCESS <br />TRAIL <br />INDOOR BIKE <br />ARKING AREA <br />FFE <br />HIGHWAY 42 <br />ECONDARY <br />BUILDING <br />ENTRY <br />01111. <br />sax <br />LOT 17 <br />SITE AREA: 154,577 sf <br />SITE W/O EASEMENT: 134,209 sf <br />OPEN SPACE EASEMENT: 20,368 sf <br />LANDSCAPE COVERAGE W/O EASEMENT: 71,495 sf <br />TOTAL LANDSCAPE COVERAGE/ OPEN SPACE: 91,863 sf <br />BUILDING FOOTPRINT: 41,500 sf <br />BUILDING TOTAL GSF: 55,500 gsf <br />MEZZANINE STORY:15,000 sf <br />166 PARKING SPACES <br />PHASE 2 BUILDING FOOTPRINT:46,700 sf <br />TOTAL BUILDING GSF: 66,000 gsf <br />MEZZANINE STORY:19,300 sf <br />192 PARKING SPACES <br />FIRE LANE <br />—PHASE 2 <br />BUILDING <br />EXPANSION <br />/ RECYCLING <br />AREA <br />FFE <br />5355.66' LOADING <br />DOCK <br />ECREATION <br />TRAIL <br />IRE <br />HYDRANT <br />fRECREATION TRAIL <br />VIEWPOINT AREA <br />—J <br />PONDING AREA, <br />SEE CIVIL <br />PHASE 2 <br />BUILDING <br />EXPANSION <br />86 PARKING <br />STALLS FOR <br />LOT 17 <br />OUTDOOR <br />EMPLOYEE <br />AREA <br />PROTECTED <br />LANDSCAPE <br />AREA <br />FFE <br />5352.66' <br />/ MAIN <br />/ BUILDING <br />ENTRY <br />ACCESS <br />TRAIL <br />aft <br />Nam am. <br />21. <br />ACCESS <br />TRAIL <br />55' LANDSCAPE <br />AND OPEN <br />SPACE <br />CONSERVATION <br />EASEMENT <br />18 C <br />PHASE 2 <br />PARKING <br />PONDING AREA. <br />SEE CIVIL <br />R <br />PARKING <br />AREA <br />16 R <br />PARKING <br />AREA <br />se <br />CV <br />CO <br />FIRE <br />HAMMERHEAD <br />DROP OFF <br />AREA <br />ao <br />b, 70 PARKING STALLS <br />FOR LOT 15 <br />o. <br />LOCATION <br />OUTDOOR <br />BIKE <br />PARKIN <br />ACCESSIBLE, CARPOOL, b <br />AND VISITOR PARKING , <br />AREA Zo <br />O. <br />AT -GRADE <br />CROSSING <br />PONDING AREA, <br />SEE CIVIL <br />50' <br />BUILDING <br />SETBAC <br />25' PARKING <br />SETBACK <br />P-ONDING AREA, <br />SEE CIVIL <br />MONUMEN <br />IGN <br />9 <br />It) <br />PONDING AREA, <br />SEE CIVIL <br />MO lab a <br />.110 MIN <br />57'-6" <br />PARKING <br />AREA <br />16 R <br />FIRE HYDRANT <br />EXISTING GRAVEL <br />TRAIL <br />20' UTIUTY <br />SETBACK <br />/IPONDING ARE <br />SEE CIVIL. <br />TAYLOR AVE <br />—EXISTING 5' <br />WALKWAY WIDENED <br />TO 8' <br />FIRE HYDRANT <br />8/30/2012' 5:57:12 PM <br />>- <br />ce <br />cc <br />CTC LOT 18 <br />PARKING <br />SETBACK <br />SETBACK <br />PARKING <br />SETBACK <br />UTILITY <br />EROPERly <br />LINE <br />0' 20' 40' <br />1 <br />80' <br />IMO <br />Air 00 11111111111111111111111111 <br />111111111111111111111111 <br />I I IA I I 5 I <br />ETA? <br />11111111111111111111111 owe door <br />smommungas LOP <br />MOUE <br />Buro Happold <br />Buro Happold Consulting Engineers, Inc <br />9601 Jefferson Blvd - Suite B <br />Culver City <br />CA 90232 <br />ZG <br />A Pi <br />Consultants <br />ARCHITECT: <br />ZGF ARCHITECTS LLP <br />1223 SW WASHINGTON ST. <br />SUITE 200 <br />T 503-224-3860 <br />ARCHITECT: <br />ARCH 11 <br />3100 CARBON PLACE #100 <br />BOULDER, CO 80301 <br />T 303-546-6868 <br />CIVIL ENGINEER: <br />CREATIVE CIVIL SOLUTIONS <br />940 KIMBARK STREET, SUITE 2 <br />LONGMONT, CO 80501 <br />T 303-684-8484 <br />(OMAR'. LZUNII <br />SHIMANO/ PEARL <br />IZUMI COLORADO <br />HEADQUARTERS <br />ISSUE DATE <br />REVISED <br />1 OCTOBER 2012 <br />AMENDED PUD <br />DEVELOPMENT <br />PLAN <br />CTC Block 1 <br />Lots 15, 16, 17 <br />Date: <br />Job No: <br />Drawn By: <br />Checked By: <br />Drawing Title <br />9 August 2012 <br />P21587.01 <br />T. Thelen <br />SITE <br />DEVELOPMENT <br />PLAN <br />Drawing No. <br />PUD I <br />WfN IEIVd AB 83 <br />cn <br />a <br />a <br />cn <br />73 JO <br />co <br />o <br />81 <br />ru <br />cn <br />cn <br />Will SIHl NO LNI8d A 3803 NOI1ISOd <br />2999 <br />REORDER BY PART NUMBER 6552 <br />V10S3NNIW '3d0H MRN • <br />VIOS3INNI N '3d0H M3N • <br />-17 <br />co <br />8 12 <br />3 <br />1:138Wf1N ONIMVUO <br />8381/1111N ONIMddO <br />CO fg <br />0 <br />o <br />Sri g <br />74 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.