Plot Time: 14:23
<br />•
<br />•
<br />•
<br />FINALPUD DEVELOPMENT PLAN
<br />LOT 2A ,BLOCK 1
<br />T1'IEPARKATCTC
<br />IHEPARKAI CTCREPLATB:
<br />A REPEAT OF LOTS 2 & 3, BLOCK 1, THE PARK AT CTC
<br />NOTES:
<br />1) THE MONUMENT SIGN SHALL BE USED TO
<br />IDENTIFY PRIMARILY THE PROJECT
<br />IDENTIFICATION
<br />2) A SEPARATE SIGN PERMIT 16 REc.IIRED
<br />PER THE INDUSTRIAL DEVELOPMENT DESIGN
<br />STANDARDS AND GUIDELINES
<br />MONUMENT SIGN
<br />A0.01 1 /4" = 1 '-0"
<br />T4E PARK AT
<br />CTC
<br />SITE
<br />PIERCE AVE
<br />6'-0"
<br />•r
<br />VICINITY MAP
<br />NOSCALE
<br />SOUTH 104th ST
<br />CONC PANEL TO
<br />HATCH SLOG. -
<br />ALTERNATE MATL.:
<br />FLAGSTONE
<br />3/4" REVEAL, TVP.
<br />0
<br />zcr
<br />loc
<br />SIGNAGE AREA: 248F -
<br />MAX. ALLOWABLE: 25 SF
<br />-c-Tc BOULEVARD
<br />DOGWOOD ST
<br />CHERRY ST..
<br />DILLON RD
<br />SITE DEVELOPMENT DATA:
<br />ZONING CLASSIFICATION: INDUSTRIAL (I)
<br />BUILDING HEIGHT: 33'-3"
<br />TOTAL SITE ACREAGE:
<br />BUILDING COVERAGE:
<br />PHASE I:
<br />PHASE II:
<br />LANDSCAPE COVERAGE:
<br />PHASE is
<br />PHASE 11:
<br />4ARDSCAPE COVERAGE:
<br />PHASE I:
<br />PHASE II:
<br />OFF STREET PARKING:
<br />BASE I:
<br />PARKIN RATIO:
<br />PHASE II:
<br />PARKING RATIO:
<br />6b55 ACRE OR 290,032 SF.
<br />COVERAGE SHALL NOT EXCEED 50% OF LOT
<br />31,255 SF (13%)
<br />18290 SF (21%)
<br />25% OF TOTAL. SITE REQUIRED
<br />111,810 SF (55%)
<br />86,8% SF (30%)
<br />80,861 SF (28%)
<br />124,846 SF (43%)
<br />•121 SPACES (4 HANDICAP SPACES)
<br />32 SPACES/1,000 SF
<br />• 39 SPACES DEFERED AS
<br />DELIVERY TRUCK PARKIN
<br />•115 SPACES (4 HANDICAP SPACES)
<br />2.3 SPACES/1,000 SF
<br />• 42 SPACES DEFERED AS
<br />DELIVERY TRUCK PARKIN
<br />SITE DEVELOPMENT NOTES
<br />1 PARKIN RATIOS SHALL SATISFY REQUIREMENTS AS DETERMINED BY THE
<br />CITY OF LOUISVILLE PLANNING DEPARTMENT, AND BUILDING OCCUPANCY
<br />USES SHALL CONFORM TO THESE STANDARDS SET FORTH AS FOLLOWS:
<br />OFFICE USES:4:1000 SF
<br />MANUFACTURING, PROCESSING, R40 USES: 2:1000 SF
<br />WAREHOUSE USES: 1:1000 5F.
<br />TWE APPLICANT CONFIRMS TWAT UPON APPROVAL OF T418 PUD APPLICATION,
<br />THE PREVIOUS FINAL PUD AND RELATED ENTITLEMENTS FOR AMERICAN
<br />VARISEAL IS HEREBY REPEALED ANT, REVOKED.
<br />3. THE APPLICANT CONFIRMS THAT APPROVAL OF T415 PUD APPLICATION DOES
<br />NOT AUTHORIZE THE APPLICANT TO BOTTLE OR SELL LOUISVILLE WATER.
<br />•
<br />SIGNATURE BLOCKS: SHEET INDEX:
<br />PLANNING COMMISSION CERTIFICATE:
<br />RECOMMENDED FO APPROVAL THIS 22nd DAY OF JUNE, 2000
<br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE,
<br />COL0. RESOL TION 22 SERIES NO. 1000
<br />/" /Fr -
<br />A A SECRETARY
<br />CITY COUNCIL CERTIFICATE:
<br />APPROVED T1415 let DAY OF AUGUST 2000 BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE,
<br />COLORADO. RESOLUTION NO SERIES 0.2000
<br />Tom, .)'
<br />MAYOR CITY CLE
<br />BOULDER COUNTY CLERK AND RECORDER:
<br />ARCHITECTURAL:
<br />40.01
<br />A1.01
<br />41.01
<br />43.01
<br />43.02
<br />Cti/tL:
<br />C1:1
<br />CI
<br />C2
<br />C3
<br />LANDSCAPE:
<br />L1.0I
<br />L1.02
<br />COVER SWEET
<br />PUD PLAN- P4ASE I
<br />PUP PLAN- PHASE II
<br />BUILDING ELEVATIONS: P4ASE 1
<br />BUILDING ELEVATIONS: PHASE II
<br />REPLAT B
<br />GRADING AND DRAINAGE PLAN
<br />MASTER UTILITY PLAN
<br />PHASE I PLAN
<br />PUD PLAN- PHASE I
<br />PUP PLAN- PHASE II
<br />ELECTRICAL:
<br />SE -1 SITE PIOTOMETRICS- PHASE I
<br />COUNTY OF BOULDER,,STATE OF COLORADO SE -2 SITE PHOTOMETRICS- PHASE 11
<br />1 I-IEREBY CERTIFY TWAT THIS INSTRUMENT WAS FILED IN
<br />T1418 OFFICE AT 12.:0 O'CLOCK, P M., T1416 DAY OF 511- S i ..ary
<br />2002. .O 'PAID
<br />IS RECORDE IN THE PLAN FILE P-3-2 F-, Alp, �{ I�f2 q3 li`{,y5�1iyrys
<br />, H9,50 51
<br />FEE (PAID' I-'O''FILM N0— ED 4PSVia!
<br />C6 . „4>,
<br />RECORDER DEPUTY
<br />OWNERSHIP SIGNATURE BOCK:
<br />BY SIGNING THIS PUP, THE OWNER ACKNOWLEDGES AND
<br />ACC =j " •1 L T ' j QUIREMENTS AND INTENT SET
<br />,1 .aCr
<br />SEALS THIS 1 AY OF IVO 200.Q
<br />OWNER OWNER
<br />y-Zg-oZ
<br />c_.__. f., •
<br />KERRY fr wL
<br />NOTARY PUBLIC, 6TATE COLORAO
<br />is.
<br />ELDORADO
<br />ARTESIAN
<br />SPRINGS, INC.
<br />LOT2A, BLOCK 1
<br />THE PARK AT CTC
<br />LOUISVILLE, COLORADO
<br />O'CONNOR
<br />DEVELOPMENT, LLC
<br />287 CENTURY CIRCLE, SUITE 101
<br />LOUISVILLE, CO. 80027
<br />TEL 303.443.4575
<br />FAX 303.664.5141
<br />SEIBERT
<br />ARCHITECTS, LLC
<br />1350 LAWRENCE STREET, S. 100
<br />DENVER, CO. 80204
<br />TEL 303.893.3304
<br />FAX 303.446.0958
<br />SCOTT COX AND
<br />ASSOCIATES, INC.
<br />CIVIL CONSULTANTS
<br />1530 55th STREET
<br />BOULDER, CO. 80303
<br />TEL 303.444.3051
<br />FAX 303.444.3387
<br />THE PLANNING
<br />GROUP
<br />LANDSCAPE ARCHITECTURE
<br />1135 PEARL STREET, SUITE 3
<br />BOULDER, CO. 80306
<br />TEL 303.444.1548
<br />FAX 303.444.6011
<br />GIVIN &
<br />ASSOCIATES, INC.
<br />ELECTRICAL CONSULTANTS
<br />12345 W. ALAMEDA PARKWAY, SUITE 310
<br />LAKEWOOD, CO. 80228
<br />TEL 303.716.1270
<br />FAX 303.716.1272
<br />PROJECT #:
<br />DATE:
<br />03.23.00
<br />04.17.00
<br />05.31.00
<br />07.10.00
<br />00001.00
<br />ISSUE:
<br />PUD
<br />PUD (REVISED)
<br />PUD (REVISED)
<br />PUD (REVISED)
<br />DRAWN BY: TFS
<br />CHECKED BY: TFS
<br />SHEET:
<br />COVER SHEET
<br />A0.0'
<br />SHEET: 01 OF:13
<br />2999 U V'J IN label A8 a3Qa038
<br />Sl3fl00Ejd 003VS
<br />SlOflOOUd 00dVS
<br />1:138VVnN ON1NWHO
<br />838VJf1N ONIMVHO
<br />`400z •Nvr
<br />0
<br />
|