Laserfiche WebLink
Sounds True <br />,.,/ ! 1 . �..... <br />.0 '2 3.0C< '64' \C <br />SOUNDS TRUE, INCORPORATED <br />418 SOUTH ARTHUR AVE., LOUISVILLE, COLORADO <br />South Boulde <br />OU15Vilf <br />c <br />6 <br />Lof ayette <br />CO N 42 Empire Rd. <br />a. <br />Cherry St. <br />so .wr 23.7 .21211- <br />; <br />oils , <br />vorilia <br />, uI <br />Dillon Rd. <br />Avi <br />Hos <br />Campus <br />Monarch HS <br />- <br />Health Park Dr. <br />5 <br />Superior ITC, <br />Storage <br />Technology <br />corporattd <br />VICINITY MAP <br />NO 5GAI-E <br />NORTH <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT nTHIS INSTRUMENT WAS FILED MY OFFICE AT <br />3 154, O'CLOCK, T . M., THIS DAY OF Pia <br />,pi. � RRECORDED © RECEPTION <br />IS PLAN FILE o��.3 , F�E r 00 <br />PAID <br />TI ON �Q �� <br />14 <br />RE�OR"d�R tkifl <br />PLANNING DIRECTOR CERTIFICATE <br />APPROVED THIS /f'7i`� DAY OF /API , 2067 BY THE <br />PLANNING DIRECTOR OF THE CITY OF LOUISVILLE, COLORADO. <br />PLrWrvi GUIRECTOR <br />PLANNI G DIRECTOR <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS .3 DAY OF <br />--- 7,2 <br />SMI ON CHRISTENSEN LLC. (OWNER) <br />TA <br />INa4 <br />9 {,.ft.% s,tteK <br />7 17 hp <br />ACCEPTS ALL <br />• 200. <br />PROJECT DATA <br />OWNER/CLIENT: <br />SIMON CHRISTENSEN LLC.. <br />413 SOUTH ARTHUR AVENUE <br />LOUISVILLE, COLORADO 80021 <br />303-665-3151 <br />ARCHITECT: <br />RVP ARCHITECTURE AND CONSULTING, P.G. <br />4141 ARAPAHOE AVENUE, SUITE 100 <br />BOULDER, COLORADO 80303 <br />303-443-5355 <br />CIVIL ENGINEER: <br />JLB ENGINEERING CONSULTANTS <br />I8 ELDORADO LANE <br />LOUISVILLE, COLORADO 80027 <br />303-604-1634 <br />LAND USE BREAKDOWN <br />USE <br />BUILDING COVERAGE (TOTAL): <br />EXISTING <br />NEW ADDITION <br />PARK I NG/DRI VES/51 DEWALKS: <br />EXISTING <br />NEW (NET) <br />LANDSCAPE AREA (TOTAL): <br />EXISTING <br />NEW <br />TOTAL: LOT 51 Z <br />AREA <br />I1,522 S.F. <br />8,0g2 5.F. <br />3,460 S.F. <br />28,056 S.F. <br />23,104 S.F. <br />4,852 S.F. <br />21,651 5.F. <br />36,03ct 5.F. <br />(8,402) 5.F. <br />61,235 5.F. <br />1.54 ACRES <br />PERCENT <br />TOTAL BUILDING AREA (2 STORIES): 20,186 S.F. t <br />41.1% <br />41.2% <br />I00% <br />r <br />4 <br />S.,80°u6'43» E <br />C H E R R Y <br />S <br />(STREET NOT BUILT)R E <br />EXISTING LIGHT POLE <br />TO REMAIN - TYP. <br />EXISTING PARKING <br />(4 SPACES) TO BE <br />REMOVED <br />RELOCATED <br />BIKE RACK <br />R. 0 W <br />237,8, <br />EXISTING ASPHALT PARKING LOT <br />EXISTING SPACE <br />TO BE DESIGNATED <br />AS H.G. <br />MOD <br />SANITARY <br />SEWER <br />CLEANOUT <br />FOUND #5 REBAR <br />W/ PLASTIC CAP <br />L.S. 18978 <br />FOUND #5 REBAR <br />(NO CAP) <br />BENCHMARK: <br />100.00' <br />1 <br />1 <br />1 1 <br />1 t <br />ASPHALT <br />ENTRY <br />1 <br />, t <br />1 <br />t-4 <br />X I ST'G <br />SPACES <br />REMA ICN <br />Wr <br />0 <br />Z <br />c <br />t <br />NEW <br />ARKING d <br />DRIVE AREA <br />OWN <br />SHADED <br />11 <br />EXISTING TREES, SHRUB5, <br />AND PATIO/PICNIC TABLE <br />IN THIS AREA TO BE <br />RELOCATED/REPLACED <br />TO OTHER AREAS <br />ZONING AND PARKING INFORMATION <br />ZONING: INDUSTRIAL (PUD) <br />SETBACKS (PRINCIPAL BUILDINGS): <br />FRONT (ARTHUR STREET): 20' <br />REAR: 20' <br />SIDE (SOUTH): 10' <br />SIDE (NORTH - CHERRY 5T. R.O.14): 20' <br />SETBACKS (PARKING): <br />FRONT (ARTHUR STREET): <br />REAR: <br />SIDE (SOUTH): <br />51 DE (NORTH) : <br />PROPOSED BUILDING HEIGHT: 28'-8" + RTU SCREENING <br />PARKING: <br />SPACES REQUIRED: <br />MANUFACTURING AND RESEARCH AND DEVELOPMENT: <br />= I SPACE PER 500 S.F. <br />= 20,186 5.F. / 500 = <br />SPACES PROVIDED: <br />EXISTING (NET OF 4 TO BE REMOVED): <br />- THIS INCLUDES 2 HANDICAP SPACES TO REMAIN. <br />AND 1 REGULAR SPACE TO BE DESIGNATED A5 H.G. <br />(ITS CURRENT SIZE AND ADJACENT RAMP ALLOW IT <br />TO BE DESIGNATED AS H.G. WITHOUT MODIFICATIONS) <br />NEW: <br />- ALL NEW SPACES ARE 8'-6" HIDE BY 17'-O" DEEP <br />AS INDICATED ON THE EXISTING PUD. <br />TOTAL PARKING PROV I DED : <br />20' <br />20' <br />10' <br />20' <br />42 SPACES <br />= 48 SPACES <br />22 SPACES <br />10 SPACES <br />RP <br />;PROPOSED <br />,TWO-STORY <br />GNU ADDITION <br />6,820 S.F.t/ <br />EXISTING TWO-STORY ©. <br />CMU BUILDING <br />13,000 S.F, t <br />UNDERMINED AREA (PLAT) -}j <br />Il M <br />U1 'INt up <br />EXISTING <br />POND <br />00 <br />219• <br />FOUND #5 REBAR <br />W/ PLASTIC CAP <br />L.S. 18978 <br />3 <br />\ PC <br />.41 <br />s <br />GENERAL NOTES: <br />I . PUD AMENDMENT 15 TO THE "SOUNDS TRUE OFF I GES AND <br />DISTRIBUTION CENTER" FINAL PUD PLAN, SITE REVIEW AND <br />ARCHITECTURAL PLAN, DATED q NOVEMBER Ic 15 AND <br />RECORDED MAY 15, Igor. <br />2. THE PROPOSED PARKING LOT EXPANSION IS LOCATED <br />AND SIZED PER THE EXISTING/APPROVED PUD. <br />3. THE PROPOSED NEW DRIVE CUT 15 LOCATED AND SIZED <br />PER THE EXISTING/APPROVED PUD. <br />4. THE PROPOSED IMPROVEMENTS WERE ANTICIPATED AND <br />ACCOUNTED FOR IN THE "FINAL DRAINAGE REPORT, <br />SOUNDS TRUE, LOT 12, BLOCK 1, COLORADO <br />TECHNOLOGICAL CENTER, LOUISVILLE, COLORADO, <br />PREPARED BY CHARLES KEIM AND ASSOCIATES, DATED <br />JANUARY 26, Ig446. <br />NORTH <br />P.U.D. PLAN <br />1 is <br />5.5 TREES AND APPROXIMATELY 8 SHRUBS IN THE AREA OF <br />THE BUILDING ADDITION WILL BE REPLACE/RELOCATED A5 <br />REQUIRED. NO TREES OR SHRUBS ARE IMPACTED BY THE <br />PARKING LOT EXPANSION. THE IRRIGATION SYSTEM <br />LOCATED IN THE AREAS OF PROPOSED IMPROVEMENTS <br />WILL BE MODIFIED AS REQUIRED. <br />6. BU I LD I NG MATERIALS TO BE SMOOTH FACED CMU AND <br />WILL MATCH EXISTING. WINDOW FRAMES TO BE DARK <br />BRONZE AND WILL MATCH EXISTING. <br />1. NO NEW SIGNAGE 15 PROPOSED AS PART OF THESE <br />IMPROVEMENTS. <br />1 <br />RIP <br />IN' <br />IN' <br />INCORPORATED <br />(i) <br />0 <br />z <br />0 <br />O M <br />O 0 <br />r- <br />3 3 <br />N <br />0 <br />m <br />3 1• <br />c <br />m u. <br />Q <br />0 ts <br />t <br />aO <br /><o <br />0 <br />1. W <br />J <br />LL <br />1-- <br />LL <br />1- <br />0 0 <br />J <br />c <br />H <br />0 <br />J <br />u3 <br />to <br />a <br />c) <br />l0 <br />a <br />COLORADO <br />O <br />'c7 J <br />PROJ NO: 06-03 <br />DATE: DEC.12, 2006 <br />REV: JANUARY 25, 2007 <br />Copyright ©2007 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. All design <br />drawings and written material <br />herein may not be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />SHEET 1 OF 2 <br />