Laserfiche WebLink
x 102.5 <br />BLOCK 6 <br />EOGE OF <br />CHERRY �--_ <br />ST <br />(ROAD <br />x 105.33 <br />REEr <br />NOT BUILT) <br />S 80°06'43„ <br />LINE OF' EXISTING <br />CURB <br />TURF—CURB—' <br />INTERSECTION <br />x 101.4 <br />237.82, <br />BERM WITH LANDSCAPE <br />SCREEN 0 THIS AREA, <br />SEE LANDSCAPE PLAN <br />PARKING LOT LIGHTING STANDARD, <br />18 FT HIGH, GLARE -SHIELD <br />103.8 x <br />N <br />SEE CIVIL o <br />WGS. FOR t <br />R TYPES AND <br />CEMENT ai <br />BUILDING -MOUNTED PARKING <br />LIGHTING, ® 24' HIGH, <br />GLARE -SHIELDS APPLIED <br />50.0' Railroad <br />R.O.W. & <br />Drainage Easement <br />104.9 x <br />/ NOTE: Future Phase 2 Exponsion <br />shall be approved by <br />City of Louisville PLanning <br />commission prior to the <br />issuance of building permit. <br />CONCRETE <br />WALKWAY. <br />BLOCK 7 <br />....liali. ., -- —W <br />ERM TH LANDSCAPE <br />SCREEN ® THIS AREA, <br />SEE LAN SCAPE PLAN <br />O$ <br />LP <br />CHERRY STREET. <br />BLOCK 2 <br />73 <br />SIDEWALK IMPROVEMENTS <br />PER CTC P.U.D. R'q'MNTS. <br />30' <br />30' <br />LOCATI0OF <br />FUTURE HASE 2 <br />CURB CU ENTRY <br />x 104.0 <br />99.1 x <br />576.23'20 <br />rchitecturaSite PRan <br />9 November 1995 scale 1"=20' <br />1 <br />��LL nor_=—a•`.'.`_.Jtl� .rte h .. a•r <br />COLORADO TECHNOLOGICAL <br />CENTER • • • FIRST FILING <br />wt.... —1 <br />-" <br />Vicinity Map <br />No scale <br />PLANNING COMMISSION CERTIFICATE <br />Mt • <br />li 1 <br />Site Review Process <br />APPROVED THIS /7' DAY OF . klLmber , 199 BY THE <br />PLANNING COMMISSION OF THE CITY OF LOUISVILLE, <br />COLORADO. RESOLUTION NO. 56 SERIES 1995 <br />fi <br />MAYOR <br />44t4A4& <br />'4414444 4,14414:4°Ar <br />SECRETARY <br />CITY COUNCIL CERTIFICATE <br />APPROVED THIS 041 DAY OF btttirrt! , 199. BY THE CITY <br />COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. RESOLUTION <br />NO. 1b SERIES )196 <br />CITY CLERK <br />CLERK AND RECORDER CERTIFICATE <br />COUNTY OF BOULDER) <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED OFFICE <br />AT ': 111 O'CLOCK, ,� . M., THIS /,54% -DAY OF <br />, IS <br />PAID CORDED IN PLAN <br />3G 3 9 <br />FILE fl' /C^H tt 3 Z, 33, 31, <br />, FEE r%/. <br />— , RECEPTION /7,./..6... / 3s. , 38 <br />Z.40,-/atle 144 sfi�r� <br />RECORDER <br />DEPUTY <br />idev)-Ai <br />PROJECT PERSONNEL DIRECTORY <br />Owner: <br />Sounds True Inc. <br />735 Walnut Street Boulder CO 80302 <br />tel 303 449 6229 fax 303 449 9226 <br />Architect: Jack Rudd - Architect <br />954 Pearl Street Boulder CO 80302 <br />tel 303 449 7245 fax 303 444 3140 <br />Civil <br />Engineer: <br />Landscape <br />Design: <br />Charles Keim Associates <br />1711 15th Street Boulder CO 80302 <br />tel 303 447 0990 fax 303 447 9141 <br />Anne Christhilf Land Design <br />776 14th Street Boulder CO <br />tel 303 447 0347 <br />Surveyor: Flagstaff Surveying Inc. <br />637 South Broadway Boulder CO 80303 <br />tel 303 499 9737 <br />PROJECT INFORMATION <br />Project Description <br />The project wilt provide new offices, distribution center, and warehousing for Sounds <br />True Inc. Sounds True Inc. is a recording company specializing in spoken word books <br />and information. ht addition to recording functions, the company will also produce, <br />market, assemble, warehouse, and distribute recording packages from the Colorado <br />Technological Center. <br />Sounds True recordings are in the form of audio and video magnetic tape cassettes and <br />compact laser -read discs. 'There will be no manufacturing on the site, as blank media <br />are manufactured by suppliers. The tapes as then produced and duplicated by Sounds <br />True. <br />Site Information <br />Legal Description: <br />Site Arca: <br />Zoning <br />Current Use: <br />Density: <br />( FAR) <br />Building Coverage: <br />(Bldg. Footprint) <br />IIardscape Surfaces: <br />(Driveways, Parking) <br />Landscaped Areas: <br />Block1 Lot12 <br />Colorado Technological Center <br />First Filing <br />Louisville Colorado <br />67,529 sf <br />1- Industrial <br />Vacant <br />Phase One Building <br />Phase Two Building <br />Totals <br />Phase One <br />Phase Two <br />Totals <br />Phase One <br />Phase Two <br />Totals <br />Phase One <br />Irrigated Area <br />Non -Irrigated <br />Phase Two <br />Irrigated Area <br />Non -Irrigated <br />Building Information <br />I3uilding Function: <br />Employees: <br />Building Area: <br />Building Height: <br />Occupancy: <br />Fire Protection: <br />Construction Type: <br />Area 12,800 sf <br />Area 6,000 sf <br />18,800 sf <br />7,820 sf <br />3,200 sf <br />11,020 sf <br />20,410 sf <br />5,810 sf <br />26,220 sf <br />19% <br />9% <br />28% <br />12% <br />5% <br />16% <br />30% <br />8.6% <br />38.6 °A) <br />18,245 sf 27% <br />41,465 sf 61% <br />10,125 sf <br />38,565 sf <br />Offices, Warehouse; Distribution, <br />Light Parts Assembly, Recording Studio <br />Phase One - 54 employees <br />Phase Two - 20 employees <br />Phase One <br />Phase Two <br />Top of Parapet <br />Two Floor Levels <br />B1 Sr B2 <br />Sprinklers <br />UI3C Type III -N <br />Parking Information <br />12,800 sf <br />6,000 sf <br />28'0„ <br />Required Parking <br />Space Ratios: Office Space =1 sp / 300 sf <br />Warehouse/Storage =1 sp / 600 sf <br />Required Parking: <br />Disabled Parking <br />Spaces Supplied: <br />Phase One <br />Office 9,300 sf / 300 sf <br />Whse/Stor 3,500 sf/600sf <br />TOTAL REQUIRED <br />TOTAL PROVIDED <br />PROVIDED RATIO <br />Phase Two <br />Office 2,600 sf / 300 sf <br />Whse/Stor 3,500 sf/600sf <br />TOTAL REQUIRED <br />TOTAL PROVIDED <br />PROVIDED RATIO <br />Four <br />Bicycle Parking: Bicycle Rack Provided <br />15% <br />57% <br />31 spaces <br />6 spaces <br />37 spaces <br />52 spaces <br />1 sp/246 sf <br />9 spaces <br />6 spaces <br />15 spaces <br />2.2 spaces <br />1 sp/254 sf <br />SOUNDS TRUE <br />Offices and Distribution,Center <br />Lot 12 Block 1 <br />Colorado Technological Center <br />Louisville Colorado <br />Final P.U.D. Plan <br />Site Review <br />Architectural Site Plan <br />Revised Submission 9 November 1995 <br />Jack Rudd - Architect <br />954 Pearl Street Boulder Colorado 80302 <br />Tel 303 449 7245 Fax 303 444 3140 <br />