Laserfiche WebLink
AN <br />ENDED P.U.D. SUB <br />v <br />ITTAL <br />VICINITY MAP <br />NEW POLE MOUNTED <br />LIGHT FIXTURE <br />ut <br />17 SPA E5 <br />SITE SUMMARY <br />LEGAL DESCRIPTION <br />Know all men by these presents, that the undersigned being the owner of a tract <br />of land SW 1/4 of Section 16, T1 S, R69W, 6th principal meridian, City of Louisville, <br />State of Colorado, and being more particularly described as follows: <br />LOT 17, 1st FILING, COLORADO TECHNOLOGICAL CENTER, LOUISVILLE, COLORADO <br />TOTAL LOT AREA <br />TOTAL BUILDING COVERAGE <br />Existing <br />Proposed <br />Combined Total <br />DRIVEWAY & OTHER HARD SURFACE AREA <br />Existing <br />Proposed <br />Combined Total <br />LANDSCAPED AREA <br />Existing <br />Proposed <br />Combined Total <br />ZONING CLASSIFICATION <br />CURRENT USE <br />PARKING SPACES <br />40,855 S.F. <br />4,942 S.F. <br />6.030 S.F. <br />10,972 S.F. <br />100.00% <br />26.86% <br />12,393 S.F. 30.33% <br />17,491 S.F. 41.81% <br />I - INDUSTRIAL <br />OFFICE/WAREHOUSE/MANUFACTURING <br />PARKING SUMMARY <br />office (1:250) warehouse (1:1000) <br />Existing - required 4,942 s.f. <br />Proposed -required <br />Total required 4,942 s.f. <br />6.000 s.f. <br />6,000 s.f. <br />Proposed Provided (2 H.C. + 25) <br />1 <br />20 spaces <br />6 spaces <br />26 spaces <br />27 spaces <br />* Parking calculations based on: 1:250sf office, 1:500sf manf, 1:1,000sf warehouse <br />or a minimum of 1:500sf for the entire building. <br />* The 17 existing parking spaces along the south edge of Lot 16 have been replaced by <br />a proposed 10 spaces along the south edge of Lot 16, and an additional 4 spaces <br />on the West side of the building on Lot 15. The final P.U.D. for Lot 16 dated <br />12/01/01 indicates there are 3 more spaces provided than required. <br />• <br />'� 205.77 <br />_ N09°59 15 W <br />16-0' <br />51-0" <br />e' SCREEN WALL, <br />MATCH EXISTING <br />011/110 <br />BUILDING SUMMARY <br />PROPOSED USE <br />NUMBER OF STORIES <br />MAXIMUM HEIGHT OF BUILDING <br />WAREHOUSE <br />ONE <br />18'-0" <br />ARCHITECTURAL MATERIALS <br />EXTERIOR WALLS - FLUTED BLOCK, PAINTED TO MATCH EXISTING <br />ACCENT STRIP - SINGLE SCORED BLOCK, INTEGRAL COLOR <br />METAL, PAINTED <br />SINGLE PLY MEMBRANE - BALLASTED <br />STEEL, ALUMINUM STOREFRONT <br />TRIM <br />ROOF <br />DOORS AND WINDOWS <br />PROJECT DIRECTORY <br />OWNER: PF INVESTMENTS, LLC - RICK PEASE, DAVID FRIEDLANDER <br />637 S. PIERCE ST., LOUISVILLE, CO 80027 <br />303 665-1305 <br />CML <br />ENGINEER: <br />ELECTRICAL <br />ENGINEER: <br />Al <br />A2 <br />A3 <br />C1 <br />C2 <br />— <br />--- S09° —59 �, <br />15 E 210.42 <br />- --_ <br />EXISTING SLD6 <br />aprox 4,842 el. <br />N <br />SIGN (SEE DETAIL 5HT A2) <br />SITE PLAN <br />N 'SCALE I" = 20'-0" <br />L _ _J <br />S06'21'50"E 202.00' <br />ASPHALT - <br />6V-0" <br />EF EAI <br />AFCA <br />/ TPAN:F)1-0R11ER <br />/ rC\ISTIC2 <br />/ / ELEc-. SEF\A:4: <br />1- 11 <br />LoADIN6, AREA C ITIS <br />it Lc: -.)AE -)1N(.3 <br />NEW ADDITION <br />aprox 6,000 s°f. <br />LOT 17 <br />.g4 ACRES <br />PLANTER <br />PIERGE AVE. <br />9 <br />BOLLARD <br />LIGHTS (2) <br />TAPERED CONC. <br />- L.S. WALL (EA. SIDE) <br />} <br />r� <br />x- <br />1)- <br />1\ A—, r <br />l— <br />PHONE CONCRETE <br />PEDESTAL TRANSFORMER PAD <br />24'-0" <br />EXISTING <br />POLE MOUNTED <br />LIGHT FIXTURE <br />.,II <br />HIGH HIGH <br />241-4" <br />I I <br />I I <br />I I <br />.I <br />LOT I6 <br />.98 ACRES <br />PARK ENGINEERING CONSULTANTS - DONALD PARK, P.E. <br />420 21ST AVE. STE 101, LONGMONT, CO 80501 <br />303 651-6626 <br />RG ENGINEERING CONSULTANTS - WALTER RABINOVICH <br />75 SO. MADISON ST., STE 100, DENVER, CO 80209 <br />303 355-5534 <br />SHEET INDEX <br />SITE PLAN <br />ELEVATIONS <br />LANDSCAPE & SITE PHOTOMETRIC PLAN <br />UTILITY PLAN <br />GRADING AND' DRAINAGE PLAN <br />LOT 2 <br />�n <br />---------------- <br />CFNAGE EASEMENT — — — — — — <br />AISTIN6 f3UILDIN6 <br />PER P.UD. DATED 12/01/01 <br />10 SPCS <br />g" r <br />�I <br />O <br />N <br />=t <br />—\ <br />owlAW <br />i—h <br />vv. ') <br />TT <br />— — <br />rJ <br />C <br />E'IST _?., - T 1. la_' l 43. `7.1, <br />CERTIFICATES <br />OWNERSHIP BLOCK <br />BY SIGNING THIS PUD, THE OWNER ACKNOWLEDGES AND ACCEPTS ALL THE <br />REQUIREMENTS AND INTENT SET FORTH IN THIS PUD. <br />Witness our hands and seals this „r'=day of <br />PLANNING COMMISSION CERTIFICATE <br />vi)`"'i 2oo_7 <br />OWNER <br />4 <br />APPROVED THIS DAY OF 2007, BY THE PLANNING <br />COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION 13 ,SERIES Z 007 <br />CITY COUNCIL CERTIFICATE 4 <br />APPROVED THIS ca'"' DAY OF Z a , 200 7 BY THE CITY COUNCIL <br />OF THE CITY OF LOUISV LL , LOLORADO. RESP _> sly = "g I , SERIES <br />0 <br />BY <br />BY <br />CITY CLERK <br />CLERK & RECORDER CERTIFICATE <br />COUNTY OF BOULDER) <br />STATE OF COLORADO) <br />HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />i : i/ O'CLOCK, k M., THIS DAY OF •+-urusr , 2007; <br />AND IS DULY RECORDED IN PLAN FILE P -0P F-1#/9• 19,2o ,FEE '31-oo , PAID <br />, FILM NO. , RECEPTION NO. <br />285581.3 <br />,1-4-A04L <br />RECIRDER <br />S09°59'15"E 210.42' <br />regmn <br />ASPI3ALT FOL r ' k <br />PARK LOT L. ;rirt (I •1 -NC <br />er-0" <br />,F TT P. <br />rui-uFE AR+.INcw (4) Nil PARD INC SPACES <br />I-- <br />1 <br />I I <br />I I 6 I <br />I. ._. __ - __ 1 L ._ __ _ __ - I <br />PROVIDE STRIPING AND <br />WHEEL STOPS FOR <br />(4) PARKING SPACES <br />LOT 15 <br />1.04 ACRES <br />`1* <br />1 <br />FIFE <br />H'T CRANT <br />c) <br />-1''Ci II <br />F OLE 11c?C)1ITL:r.% <br />Llr_,hT rI rLJ L <br />(_, <br />E-'<1`=TIf <br />'12.2.x1-11)1 <br />J <br />i <br />NOTICE: DUTY OF COOPERATION <br />Release of these plans contemplates <br />further cooperation among the owner, his <br />contractor and the architect. Design and <br />construction are complex. Although the <br />architect and his consultants have <br />performed their services with due care and <br />diligence, they cannot guarantee perfection. <br />Communication is imperfect, and every <br />contingency cannot be anticipated. Any <br />ombiguity or discrepancy discovered by the <br />use of these plans shall be reported <br />immediately to the architect. Failure to <br />notify the architect compounds <br />misunderstanding and increases <br />construction costs. A failure to cooperate <br />by a simple notice to the architect shall <br />relieve the architect from responsibility for <br />all consequ l....., Changes made from the <br />plans without sit of the architect are <br />unauthorized, and Shall relieve the architect <br />of responsibility for oll consequences <br />arriving out of such changes. <br />✓ <br />o <br />o <br />LL <br />Z b'> <br />O <br />• = 0J <br />® 4o <br />® V <br />Q .43 <br />W c" <br />W •� <br />I— <br />Q —146 <br />ass I <br />\\ <br />s s () (' 11T E s.L t, (' <br />:iCTEEl-IT101 <br />P00-ItT <br />1 -31,EP <br />I I <br />E-1 <br />SEP <br />808 S. Public Rd., Suite 100 1 Lafayette, (0 80226-2194 <br />Phone: 303.6041900 1 Fax: 303.604.2905 <br />JOB NO: 1407 <br />DRAWN: br <br />CHECKED: <br />DATE: 04-17-07 <br />REVISED: 05-31-07 <br />06-20-07 <br />< <br />573.0 <br />CD <br />o �• <br />-, <br />w Cfl <br />