Laserfiche WebLink
DRAWING NUMBER <br />DRAWING NUMBER <br />DRAWING NUMBER <br />cc <br />ca <br />O <br />I - <br />z <br />zE <br />aW <br />I <br />wz <br />z <br />Qo <br />• a to <br />m W <br />CD <br />DwCC y <br />❑ E, <br />o w <br />cc cc <br />a <br />LL <br />4 <br />0 <br />w <br />4 co <br />z <br />in <br />Ow <br />I < <br />z� <br />Uw <br />Q <br />Ouw <br />a¢ <br />U <br />LL <br />THE FOLLOWING IS A RESPONSE TO YOUR CONCERNS ABOUT <br />THE REAR FACE OF THE BUILDING BEING TOO BLANK: <br />1. WE HAVE BROKEN UP THE WEST FACADE OF THE BUILDING <br />WITH A WIDE RANGE OF MATERIALS, TEXTURES AND COLORS. <br />WE HAVE CHOSEN A GROUND FACE CONCRETE BLOCK <br />(COLOR#1) FOR THE LOWER PORTION OF THE BUILDING IN A <br />BEIGE COLOR, FOR THE BANDS, WE HAVE CHOSEN A SPLIT <br />FACE OR HEAVILY TEXTURED CONCRETE BLOCK (COLOR#2) <br />SET IN A VERTICAL (SOLDIER) PATTERN OF A DEEP BRICK/MAROON <br />RED. THE UPPER PORTION OF THE BUILDING, WHICH WILL BE <br />SET BACK FROM THE CONCRETE BLOCK BELOW, IS COMPOSED <br />OF TWO COLORS AND TEXTURES OF STUCCO (EIFS). THE MAIN <br />COLOR OF THE STUCCO WILL BE A LIGHTER BEIGE (COLOR#3) <br />COMPARED TO THE CONCRETE BLOCK BELOW TO GIVE THE <br />ILLUSION OF DEPTH. THE HEAVILY TEXTURED STUCCO BANDS <br />(COLOR#4) ON THE UPPER PORTION WILL BE A NICE CONTRAST <br />TO THE MORE SMOOTH APPEARANCE OF THE STUCCO. <br />2. IN ADDITION TO THE VARYING MATERIALS, TEXTURES AND COLORS, <br />WE HAVE ADDED CONTROL JOINTS TO EITHER SIDE OF THE WINDOWS <br />TO SIMULATE COLUMNS AND GIVE VERTICAL INTEREST. <br />3. THE WINDOWS ON THE GROUND FLOOR AS WELL AS ON THE <br />UPPER FLOOR ARE INSET INTO THE BUILDING, WHICH CREATES <br />SHADOW LINES AND BREAKS UP THE FLAT PLANE OF THE FAQADE <br />WITH ADDING DEPTH. THE ADDITION OF HORIZONTAL MULLIONS ON <br />THE GROUND FLOOR WINDOWS PROVIDES VARIETY & DIFFERENTIATION <br />BETWEEN THE TO TWO FLOORS OF WINDOWS. <br />PREFINISHED METAL ROOFING, <br />COLOR #5 <br />PREFINISHED METAL PARAPET CAr' <br />TEXTURED STUCCO FINISH, COLOR #4 <br />TEXTURED STUCCO FINISH, COLOR #3 <br />t0 <br />N <br />• <br />A <br />0 <br />• <br />tgiriNe <br />9'X9' STACKING GLASS DOORS <br />EIFS REVEAL LINES <br />SOLAR BRONZE VISION GLASS <br />STEEL GUARDRAIL, COLOR #6 <br />TEXTURED CONCRETE <br />BLOCK, COLOR #2 <br />TEXTURED CONCRETE <br />BLOCK, COLOR #1 <br />SOUTH ELEVATION <br />1 /8" = 1,_o>, <br />EIFS REVEAL LINES <br />SOLAR BRONZE VISION GLASS <br />STEEL GUARDRAIL, COLOR #6 <br />::;1',., TEXTURED CONCRETE <br />�� BLOCK, COLOR #2 <br />PREFINISHED METAL ROOFING, <br />COLOR #5 <br />\ <br />0 <br />cO <br />N <br />• <br />• <br />• <br />SOLAR BRONZE <br />VISION GLASS <br />STEEL GUARDRAIL, <br />COLOR #2 <br />TEXTURED CONCRETE <br />BLOCK, COLOR #2 <br />TEXTURED CONCRETE <br />BLOCK, COLOR #1 <br />CONTROL/EXPANSION JOINTS <br />WEST ELEVATION <br />1/8" = 1,_O„ <br />EIFS REVEAL LINES <br />PREFINISHED METAL PARAPET CAP <br />TEXTURED STUCCO FINISH, COLOR #4 <br />TEXTURED STUCCO FINISH, COLOR #3 <br />PREFINISHED METAL ROOFING, <br />COLOR #5 <br />•,r <br />(3 \ NORTH ELEVATION <br />1 /8" = 1 '-o" <br />TEXTURED CONCRETE <br />BLOCK, COLOR #1 <br />SOLAR BRONZE VISION <br />GLASS <br />EIFS REVEAL LINES <br />PREFINISHED METAL PARAPET CAP <br />TEXTURED STUCCO FINISH, COLOR #4 <br />TEXTURED STUCCO FINISH, COLOR #3 <br />i-47 EAST E L EVAT I O N <br />1 /8" = 1'-O" <br />TEXTURED CONCRETE <br />BLOCK, COLOR #2 <br />TEXTURED CONCRETE <br />BLOCK, COLOR #1 <br />0 5 10 <br />3 2/22/01 <br />2 2/5/01 <br />1 12/7/00 <br />REVISED PER CONDITIONS OF APPROVAL <br />PLANNING DEPARTMENT COMMENTS <br />PLANNING DEPARTMENT COMMENTS <br />NO. DATE REVISION <br />PEH ARCHITECTS <br />1319 Spruce Street Suite 207 <br />Boulder, CO 80302 <br />303-442-0408, fax: 303-447-1905 <br />e-mail: peheinz©peharchitects.com <br />BOULDER FRUIT EXPRESS <br />LOTS 17 & 18, BLOCK 6 <br />COLORADO TECHNOLOGICAL CENTER <br />FINAL PUD DEVELOPMENT PLAN & AMENDED FINAL PUD <br />DEVELOPMENT PLAN (LOT 17 ONLY) <br />LOUISVILLE, COLORADO <br />SHEET TITLE <br />2—STORY BUILDING <br />EXTERIOR ELEVATIONS <br />PROJECT: 2001 <br />DATE: 10/19/2000 <br />DRAWN BY: JRN <br />CHECKED BY: PEH <br />SHEET NUMBER <br />A300 <br />°F. /1 <br />