Laserfiche WebLink
LOT 11, <br />BLOCK 8 <br />co <br />0 <br />0 <br />P:\9814 Bachlib IV\Issued Sets\2nd Revised PUD\AlsiteIV.dwg <br />1 <br />1 <br />1 <br />O <br />co 0 <br />6 <br />CO c <br />z <br />1 <br />1 <br />LOT 12, BLOCK 8 <br />BLDG. SETBACK <br />22.5' RAILROAD Sc DRAINAGE EASEMENT (PLAT) <br />LOT1 <br />gno <br />D.S. <br />c <br />ti <br />753 <br />L_ <br />APPROVED PHASE <br />IV BUILDING OUTLINE <br />CONC. CURB 4 <br />GUTTER (TYP.) <br />- <br />L <br />1"t' -b' <br />D.5 <br />ROOF SLOPE <br />I/4" / FT. (TYP) <br />REVISED PHASE IV BLDG. <br />22,354 S.F. <br />SITE LIGHT <br />NEVI MONJMENT SIGN; s <br />EXTERNALLY LIT <br />(SEE 5/A4) <br />4 <br />G-2„ <br />___-- W-8 <br />RIDGE --�� <br />SITE LIGHT <br />RTU 4 MECH. <br />SCREEN Trp. <br />200.00' _ <br />s 06'21'5° <br />" E <br />/ - <br />/ <br />I/ <br />1 <br />1 <br />N 00'41'41" E <br />96.5 INV. <br />-I- --- .J- --- J---- L --- --_--4- <br />I <br />EXISTING STRIPING <br />TOE"REMOVED <br />+ <br />0) <br />flN <br />OF NEW <br />O <br />TRASH ENCLOSURE <br />11 STORM <br />INLET <br />a <br />6 <br />DOCK 4 RETAINING <br />WALL RAILINGS <br />NEV TRASH ENCLOSURE <br />- LINE OF EXISTING CONC. <br />TO BE REMOVED <br />CONC. LOADING <br />D. <br />BIKE RACK <br /><- -, <br />D.5` <br />PLANTER <br />SITE LIGHT <br />STA ARD PACS <br />OUL <br />- G-2„ <br />15. <br />A <br />/ EXIST1N0 <br />NEtot 1NG LOT pARK111G LO <br />LINE OF EXIST. PAVING <br />SITE LIGHT <br />(6) STAND IRO 5PAGE5 <br />CURB 4 <br />GUTTER ('IYP) <br />200.00' <br />N <br />06'21'50" W <br />---- GURB JUT <br />BENCH <br />EATING <br />EXISTING CURB \� <br />GUTTER TO BE <br />REMOVED <br />NEIN TRANSFORMER <br />LOCATION <br />LINE OF NEW PAVING <br />0 <br />P <br />451.16' <br />LOT 13, BLOCK 8 <br />L = 50.93' <br />R = 470.00' <br />EXISTING 1500 CHERRY STREET <br />TILT WALL CONCRETE BUILDING <br />EXISTING BLPG. <br />EXISITING ASPHALT PARKING AREA <br />METAL <br />COVER BLDG. SETBACK <br />TNG FIRE <br />W- 8„ <br />G-2" <br />Gi <br />SITEA./ROO,F0PLAN <br />ELECTRIC <br />TRANSFORMER <br />E <br />G -2" <br />E <br />EXISTIIG <br />PHONE BOX <br />W-8„ <br />EXI5TIN5 <br />DRIVEWIAY 4 <br />CONC. <br />- G-2„ <br />NO SURE ACE SS -8' <br />EVIDENCE <br />E <br />LANDSCAPE SETBACK -- -- <br />14' UTILITY EASEMENT (PLAT) <br />Yee <br />R\M: <br />INV: <br />yyy <br />LOT <br />------ 30' -Ca° <br />I <br />STORM <br />INLET <br />n <br />2.91-O" <br />EXISTING ASPHALT <br />PARKING AREA <br />STORM <br />INLET <br />0 <br />z <br />to <br />X <br />W <br />w <br />J <br />0 <br />440.00' <br />\N-8S-TR <br />CET <br />w-8p1ER0E <br />G-2" <br />SS -8" <br />o 6 SHEET INDEX <br />Al PHASE IV SITE PLAN <br />A2 PHASE IV FLOOR PLAN <br />A3 PHASE IV ELEVATIONS <br />-E--�- <br />L1 LANDSCAPE PLAN <br />CO CIVIL COVER SHEET <br />Cl GRADING, DRAINAGE, AND <br />MASTER UTILITY PLAN <br />C2 DETAILS <br />G-2„ <br />243' <br />NOTES: <br />SS -8" <br />- W-8" <br />1. Outlot A has been determined not to be undermined as <br />originally platted. <br />2. The City will not be responsible for damage and restoration <br />of any private improvements located within a public easement. <br />3. A change in building use other than that currently proposed <br />for Phase IV may require a re-caluculation of parking stalls <br />required. This could result in more of less parking required for <br />Phase IV. <br />o1_ <br />O <br />O 0 <br />J - <br />J <br />J/ <br />1 \ 1 `/ <br />__ ____77,... II <br />CONCRETE CHANNEL <br />1 <br />1 <br />4. All connections to existing utilities shall be done in a manner to <br />minimize disruptions to existing users. <br />LLJ <br />LI <br />c <br />(f) <br />W <br />_L <br />U <br />5. Sidewalk improvements shall be installed at the expense of the property <br />owner pursuant to a master sidewalk plan for th CTC approved by the City. <br />6. Compliance with the CTC Sidewalk Plan may require a partial redesign of <br />the existing stormwater detention areas. <br />7. Existing fire hydrants shall be adjusted vertically and/or horizontally to <br />City Standards if it would interfere with the placement of a future sidewalk. <br />8. Deciduous trees shall not be planted within five feet or coniferous trees <br />planted within ten feet of a public utility or sidewalk. <br />9. Prior to construction within public right of way, the owners shall submit <br />engineering drawings with appropriate construction notes indicating the water <br />service connection and appurtenances, the fire line piping and appurtenances, <br />the sanitary sewer construction and appurtenances, the storm sewer system on <br />site and off site, drive ramps, street cuts, sidewalks, and any other public <br />improvement to the public works department for review and approval. <br />1 <br />1 <br />REVISED P.U.D. <br />SITE SUMMARY <br />LEGAL DESCRIPTION <br />LOT1, OUTLOT A, BLOCK 8 COLORADO TECHNOLOGICAL CENTER, <br />LOUISVILLE, COLORADO <br />TOTAL AREA <br />TOTAL BUILDING COVERAGE <br />Existing: <br />Phase IV: <br />Combined Total: <br />171,217 S.F. <br />DRIVEWAY & OTHER HARD SURFACE AREAS <br />Existing <br />Existing remaining after improvements <br />Phase IV <br />Total w/ existing surfaces <br />LANDSCAPED AREA <br />Total <br />ZONING CLASSIFICATION <br />CURRENT USE OFFICE <br />PARKING SPACES* <br />office <br />Existing - required (15,000 S.F. <br />Phase IV - required (5,589 S.F. <br />Total - required <br />Existing Provided <br />Phase IV Provided <br />Total Provided <br />man <br />3,14 <br />8,27 <br />1 *Parking calculations based on: Office=1:250 <br />Warehouse=1:1000 S.F. <br />1 <br />1 <br />23,740 S.F. <br />22.354 S.F. <br />46,094 S.F. <br />46,890 S.F. <br />39,215 S.F. <br />32.055 S.F. <br />71,270 S.F. <br />100.00% <br />13.9% <br />13.1% <br />27.0% <br />27.4% <br />22.9% <br />18.7% <br />41.6% <br />55,422 S.F. 31.4% <br />I - INDUSTRIAL <br />/ MANUFACTURING / WAREHOUSE <br />ufact. warehouse <br />0 S.F. 5,600 S.F.) <br />0 S.F. 8,495 S.F.) <br />(2 H.C. + 65) <br />(3 H.C. + 47) <br />(5 H.C. + 112) <br />70 spaces <br />47 spaces <br />117 spaces <br />67 spaces <br />50 spaces <br />117 spaces <br />S.F., Manuf.=1:500 S.F., <br />BUILDING SUMMARY <br />PROPOSED USE <br />NUMBER OF STORIES <br />MAXIMUM HEIGHT OF BUILDING <br />ARCHITECTURAL MATERIALS <br />TRIM / CANOPIES <br />ROOF <br />DOORS & WINDOWS <br />OFFICE / WAREHOUSE <br />ONE <br />22'-0" - 25'-8" <br />CONCRETE TILT WALL, PAINTED <br />METAL, PAINTED <br />SINGLE PLY MEMBRANE - BALLASTED <br />STEEL, ALUMINUM STOREFRONT <br />CERTIFICATES <br />PLANNING DIRECTOR CERTICFICATE <br />APPROVED THIS DAY OF , 1999 BY THE PLANNING <br />DIRECTOR OF THE CIY OF LOUISVILLE, COLORADO. <br />BY <br />PLANNING DIRECTOR <br />CLERK & RECOREDER CERTIFICATE <br />(COUNTY OF BOULDER) <br />(STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />O'CLOCK, �.M., THIS DAY OF , 1999, AND <br />IS DULY RECORDED IN PLAN FILE , FEE PAID <br />, FILM NO. , RECEPTION NO. <br />RECORDER <br />DEPUTY <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS PUD, THE OWNER ACKNOWLEDGES AND ACCEPTS <br />ALL THE REQUIREMENTS AND INTENT SET FORTH IN THIS PUD. <br />r hands and Is this E';" day of /1/)C' eki t !2 1999. <br />WNER <br />NpTARY <br />OWNER <br />My Commission Expires f� <br />10. Square footage represented on this submittal used to determine parking <br />reqiurements is based upon gross figures. Final parking requirements will be <br />based upon gross figures less space allocated for stairwells, elevator shafts, <br />hallways, ornamental balconies, space occupied by heating, air conditioning or <br />other utility equipment, space devoted exclusively to storage (excluding <br />warehouse) and space devoted to off-street parking or loading. As per <br />section 17.20.010 of the City of Louisville Zoning Ordinance effective 1996. <br />11. Developments in the CTC are currrently on a sole source supply line for <br />water. Those locating to the Park are subject to interruption of service in <br />case of emergencies or unavoidable maintenance activities that affect the sole <br />source may be inadequate to meet during times of peak usage within the CTC. <br />12. The property owner shall replace all existing curb, gutter, and pavement <br />that has settled or is otherwise damaged, adjacent to the development. <br />13. Curb, gutter, and pavement that needs to be removed and replacedwill be <br />marked by a City Inspector prior to beginning public improvements. <br />14. Building permits shall not be issued for office occupancy irr excess of <br />square footage listed in the required parking calculations. <br />15. No Certificates of Occupancy will be isued until construction acceptance is <br />granted for the public improvement. <br />16. This approval supercedes the existing approved PUD as it relates to the <br />total build out floor area. <br />NOTICE: DUTY OF COOPERATION <br />Release of these plans contemplates <br />further cooperation among the owner, his <br />contractor and the architect. Design and <br />construction are complex. Although the <br />architect and his consultants have <br />performed their services with due care and <br />diligence, they cannot guarantee perfection. <br />Communication is imperfect, and every <br />contingency cannot be anticipated. Any <br />ambiguity or discrepancy discovered by the <br />use of these plans shall be reported <br />immediately to the architect. Failure to <br />notify the architect compounds <br />misunderstanding and increases <br />construction costs. A failure to cooperate <br />by a simple notice to the architect shall <br />relieve the architect from responsibility for <br />all consequences. Changes made from the <br />plans without consent of the architect are <br />unauthorized, and shall relieve the architect <br />of responsibility for all consequences <br />arriving out of such changes. <br />AT THE COLORADO TECHNOLOGICAL CENTER <br />Garth Braun Associates <br />Architecture • Planning • <br />Development Consulting <br />954 Pearl Street <br />Boulder, CO 80302 <br />303/447-1859 <br />JOB NO 9814 <br />DRAWN SRS <br />CI-ECKED GEB <br />DATE 021699 <br />REVISED: 061699 <br />3559 H39WON 1Htld AB 83O1:1038 <br />sianaodd MA'S <br />z <br />0 <br />m <br />2 <br />z <br />m <br />D1 <br />co <br />iU th <br />n O <br />O <br />CTS <br />'0 CD <br />cn <br />CD CO <br />• <br />< <br />Slonaoud DOdvs <br />2559 H39WfN 1HVd AB H30H03H <br />REORDER BY PART NUMBER 6552 <br />SAFCO PRODUCTS • NEW HOPE, MINNESOTA <br />SiOnoOdd oodVS <br />8381A1f1N ONIMV IO <br />