Laserfiche WebLink
0 <br />v <br />to <br />Final Plan PUD Extension <br />DRAWING NUMBER <br />CC <br />m <br />2 <br />z <br />z <br />cc <br />cc <br />00 <br />2 <br />z <br />cc <br />0 <br />63 <br />w <br />a � <br />0 <br />z <br />zN <br />ED <br />LEFJ <br />W Z Y <br />z ¢ :L <br />• a <br />83 1 <br />(n <br />1— w 1 <br />=P 1 <br />00 .- <br />ow <br />ac <br />.N I <br />0 <br />LU <br />z <br />zN <br />La CC <br />aCE <br />0m <br />z� <br />• a <br />m <br />°• C <br />2 <br />0 <br />a <br />cn <br />7hs S/keel- Ctr'l°°ems <br />-fa -6Fet,11 ai9xtte <br />PaD 'Way %tiff <br />/o/slv)io <br />CITY COUNCIL CERTIFICATE <br />\A <br />�s- <br />AV \DV <br />ODV <br />w <br />COOADO _C-\00©CA_ C-�-=�_ _ <br />OUSU __, COOADO <br />ASSCO CO.MADO -=C- \DS A, __C <br />APPROVED THIS ' DAY OF 5110 , 20 13 , BY THE <br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. V3 SERIES 2-01. <br />CITY CLERK <br />PLANNING COMMISSION CERTIFICATE <br />RECOMMENDED APPROVAL THIS IIS DAY OF i1it - , 20 13 , <br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. SERIES 2011 <br />0/4‹ <br />CHAIRMAN <br />0/pr <br />SECR5TARY <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />9.2/ O'CLOCK, 4 . M., THIS 19 DAY OF 5 p L1et'-' , <br />201*), AND IS RECORDED IN PLAN FILE , FEE <br />PAID FILM NO. , RECEPTION o334 302 <br />RECORDER DEPUTY <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS act DAY OF <br />PASSaL RADO H INDUSTRIAL, LLC. (OWNER) <br />A-Gg. Pi, out/ <br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF SECTION 16, <br />TOWNSHIP I SOUTH, RANGE 69 WEST, 6TH PRI NG I PAL MERIDIAN, G I TY OF <br />LOU I SV I LLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCR I BED AS <br />FOLLOWS: LOTS I, AND 2, COLORADO TECHNOLOGICAL CENTER, FILING. <br />NUMBER TWO. <br />, 201 ?>. <br />ZONING AND PARKING INFORMATION <br />ZONING: INDUSTRIAL PUD <br />SETBACKS (PRINCIPAL BUILDINGS): <br />FRONT (CTC BOULEVARD): 30' <br />REAR (SAME ZONING) : 15' <br />REAR (AGRICULTURAL): 25' <br />5I DE (NORTH) : 10' <br />51 DE (SOUTH - DILLON RD): 60' <br />ALLOWABLE MAX I MUM BU ILD I NG HE I GHT: <br />(PER CITY OF LOUISVILLE IDDSG) <br />PROPOSED BU I LD !NO HEI GHT: 32'-O" <br />SETBACKS (PARK I NO): <br />FRONT (CTG BOULEVARD): 20' <br />REAR (SAME ZONING): N/A <br />REAR (AGRICULTURAL): N/A <br />SIDE (NORTH) : 10' <br />SIDE (SOUTH - DILLON RD): 30' <br />40' <br />PARCEL A (LOTS I AND 2) : <br />BUILDING SIZE: <br />GROUND FLOOR: <br />MEZZANINE/SECOND FLOOR (20% MAX.): <br />TOTAL : <br />PARKING : <br />INITIAL SPACES: <br />DEFERRED SPACES (MAXI MUM) : <br />TOTAL POTENTIAL PARKING: <br />INITIAL PARKING 15 2.0 SPACES PER 1,000 S.F. <br />MAXI MUM PARKING 15 APROX. 3.8 SPACES PER 1,000 S.F. <br />010,500 S.F. <br />14,300 S.F. <br />104,800 S.F. <br />210 <br />1013 <br />403 SPACES <br />GENERAL NOTES: <br />I. THE PROJECT 15 TO BE CONSTRUCTED IN ONE PHASE. <br />2. REFER TO CIVIL ENG I NEER! NG DRAWINGS PREPARED BY HURST <br />ASSOC I ATES FOR UTILITY, GRADING, AND DRA I NAGE INFORMATION. <br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS: <br />DECEMBER, 2008 <br />4. GONSTRUGTI ON MATERI ALS AS FOLLOWS: <br />WALLS: PRE -CAST CONCRETE PANELS <br />TYPE A: CREAM <br />TYPE B: LIGHT BROWN <br />TYPE C: GREEN <br />ROOF: MEMBRANE (CONGEALED BY PARAPET) <br />CANOPIES: PRE -CAST - COLOR TO BE DETERMINED DURING P.U.D. PROCESS. <br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH <br />5. THE PROJECT 15 TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET <br />FORTH IN THE BUSINESS CENTER AT COLORADO 'TECHNOLOGICAL CENTER <br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 101018, AND <br />AND THE G I TY OF LOU I SV I LLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS <br />AND GUIDELINES. <br />6. ALL EXISTING PUBL IC AND FR I VATS SIDEWALK, CURB, GUTTER AND ASPHALT <br />ADJACENT TO THE PERIMETER OF THE SITE THAT 15 CRACKED, SETTLED, OR <br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR, <br />A5 DETERMINED NECESSARY BY THE G I TY, AS PART OF THE PROJECT, AND <br />AT THE DEVELOPER'S EXPENSE. <br />7. PUBL I G IMPROVEMENTS (CTC BOULEVARD $ BOXELDER) TO BE DONE <br />UNDER SEPARATE APPROVALS I N CONJUNCT I ON WITH TH 15 PROJECT. <br />8. ROOF TOP EQUIPMENT 15 ANTI G I FATED AND WILL BE SCREENED. <br />LOCATIONS, QUANTITIES AND SIZES NOT YET KNOWN. <br />01. THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING <br />MATER ALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE <br />BUILDING FERMIT PROCESS. ANY RETAINING WALLS OVER 30" HIGH <br />MUST HAVE A 42 " HEI GHT GUARD RAIL ON THEM. <br />10. A PARKING DEFERRAL 15 BEING REQUESTED FOR PARKING IN EXCESS OF <br />THE MINI MUM 2 SPACES PER 1,000 S.F. OF FLOOR AREA REQU I RED. <br />SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING. <br />II. THE SU' LDING WILL NOT RECEIVE A CERTIFICATE OF OCCUPANCY <br />UNTIL THE SANITARY SEWER LIFT STATION ON 104TH STREET 15 COMPLETE. <br />12. THE PURPOSE OF THE F I RST AMENDMENT (DATED OCT. 19, 2010 ON THE <br />COVER SHEET ONLY) 15 TO EXTEND THE EXPIRATION DATE OF THE F I NAL <br />P.U.D. ALL OTHER ASPECTS OF THE F.U.D. REMAIN UNCHANGED <br />LAND USE BREAKDOWN <br />PARCEL A (LOTS I AND 2) <br />BUILDING COVERAGE: <br />PARKING AND DRIVES: <br />PEDESTRIAN HARD SCAPE : <br />OPEN SPACE (LANDSCAPED): <br />TOTAL: LOT 51ZE <br />TOTAL BUILDING AREA: <br />GROUND FLOOR: <br />MEZZAN I NE: <br />AREA <br />010,500 S.F. <br />132,223 S.F. <br />4,522 S.F. <br />801,872 5.F. <br />311,111 5.F. <br />7.28 ACRES <br />104,800 5.F. <br />010,500 S.F. <br />14,300 S.F. <br />PERCENT <br />28.5% <br />41.1% <br />I.4% <br />28.4% <br />100% <br />PROJECT DATA <br />OWNER/CLIENT: <br />HILL PROPERTIES - CTC LAND, LLC <br />1825 FAY AVENUE, SUITE 340 <br />LA JOLLA, CA 012037 <br />858-456-4045 <br />ARCHITECT: <br />RVP ARCHITECTURE AND CONSULTING, F.C. <br />4141 ARAPAHOE AVENUE, SUITE 100 <br />BOULDER, COLORADO 80303 <br />303-443-5355 <br />CIVIL ENGINEER: <br />HURST it ASSOC I ATES, INC. <br />401019 PEARL EAST C I ROLE, 5U I TE 106 <br />BOULDER, COLORADO 80301 <br />303-449- 1105 <br />LANDSCAPE DESIGN: <br />NATURE'S DESIGN <br />15614 I ND I ANA GULCH ROAD <br />JAMESTOWN, COLORADO 80455 <br />303-459-3333 <br />ELECTRICAL / LIGHTING: <br />ARCHITECTURAL ENG I NEER I NG DESIGN GROUP, INC. <br />10100 WAZEE STREET, SUITE 255 <br />DENVER, COLORADO 80202 <br />303-296-3034 <br />DRAWING INDEX <br />COVER SHEET <br />1 DEVELOPMENT PLAN / DETAILS <br />2 ELEVATIONS <br />L1 LANDSCAPE PLAN <br />L2 PLANT LISTS AND NOTES <br />01 SITE IMPROVEMENT PLAN <br />C2 SITE UTILITY PLAN <br />E1A PHOTOMETRIC PLAN <br />E2A LIGHTING CALCULATIONS AND CUT SHEETS <br />South Boulder <br />p.1/4,9.9\". <br />Cherry St. <br />c <br />LOUISVI I Ie 1 <br />Lafayette <br />• <br />Avast <br />Hospital <br />Campus <br />• <br />Monarch H5 <br />Health Park Dr. <br />hep <br />Superior <br />Storage <br />Technology <br />VICINITY MAP <br />NO SGALE <br />NORTH <br />Ot <br />0 <br />c 0 <br />c <br />0 <br />0 <br />c° <br />0 <br />c <br />a♦ <br />u <br />tvc`f <br />U <br />UD <br />PASSCO COLORADO TECH <br />OM <br />.' <br />O <br />CO <br />0 <br />Q 0 <br />m pi <br />0 <br />.c <br />aO <br />5 L <br />< <br />T <br />. -?;W <br />LOTS 1 & 2 FILING 2 <br />N <br />0 <br />Fax: (303) <br />M <br />1)a <br />M <br />0) <br />0 <br />a <br />LOUISVILLE, COLORADO <br />769 CTC BOULEVARD <br />PROJ NO: <br />DATE: <br />REV: <br />07-17 <br />SEPT. 13, 2007 <br />OCT. 26, 2007 <br />NOV. 26, 2007 <br />NOV. 25, 2009 <br />OCT. 19, 2010 <br />MAY 2,2013 <br />Copyright 02009 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. All design <br />drawings and written material <br />herein may not be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />COVER SHEET <br />