z
<br />VJ0)
<br />Q
<br />Q O
<br />G..Z�
<br />LL
<br />DRAWING NUMBER
<br />DRAWING NUMBER
<br />DRAWING NUMBER
<br />MINNESOTA
<br />w
<br />a
<br />c)
<br />_
<br />uJ
<br />w
<br />z
<br />.
<br />REORDER 6, ?ART NUMBER 6552
<br />---�- POSITION -EDGE Of PRINT ON THIS LINE
<br />I
<br />LU
<br />w
<br />z
<br />Z (U
<br />ui m
<br />CL w
<br />o m
<br />LJ
<br />z
<br />CC
<br />• a
<br />co m
<br />Ho
<br />00
<br />CCC
<br />0
<br />0
<br />LL
<br />1
<br />rl
<br />1,
<br />HINT ON THIS LINE
<br />• NEW HOPE, MINNESOTA
<br />SAFCO PRODUCTS
<br />REORDER 6 , ?ART NUMBER 6552
<br />IT10N EDOE-OF-PRINT ON THIS -LINE
<br />(
<br />/ u0
<br />CITY COUNCIL CERTIFICATE
<br />\A D.,.D. D
<br />"-S AV \DV \
<br />CO.MADO--C-\O.OGCA_ C-\ \G \0, 2
<br />OUSV ___, COOADO
<br />ASSCO CO.MA)0 -=C- �)�S�A_, __C OS & 2
<br />APPROVED THIS S ♦� DAY OF O c To E R , 20 \ v , BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. � �- SERIES a o
<br />PLANNING COMMISSION CERTIFICATE
<br />44.
<br />RECOMMENDED APPROVAL THIS cI DAY OF S e PT Em 6 , 20 10 ,
<br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. 11 3 SERIES a o o
<br />CN�
<br />SECRETARY
<br />CLERK AND RECORDER CERTIFICATE,
<br />(COUNTY OF BOULDER
<br />STATE OF COLORADO)
<br />1 HEREBY CERTIFY THAT THIS INSTRUMENT
<br />/1= `t 3 O'CLOCK, 111- . M.., THIS /7
<br />20 , AND IS RECORDED IN PLAN FILE
<br />PAID $/1 • o FILM NO.
<br />r /tea [ f
<br />RECORDER
<br />WAS FILED IN MY OFFICE AT
<br />DAY OF Febr6,44ei
<br />,FEL_Pt 00
<br />RECEPTION _3 ) 3 3941-.2
<br />DEPUTY
<br />.
<br />OWNERSHIP SIGNATURE BLOCK
<br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL
<br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D.
<br />WITNESS OUR HANDS AND SEALS THIS DAY OF , 20_11.
<br />l ►-< .; `
<br />•w Cak.6)4 4 i s E ®i revatt 121 201L
<br />019 EG 'L DESCRIPTION: PART OF THa OUT EAST QU QUARTER OF SECTION 16,
<br />L
<br />TO SHIP I SOUTH, RANGE 61 WEST, 6TH PRINCIPAL MERIDIAN, CITY OF
<br />LOU SVILLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRIBED A5
<br />F01-1 0 NS: LOTS I, AND 2, COLORADO TECHNOLOGICAL CENTER, FILING.
<br />NUM!ER TWD.
<br />CH ` - - TRIAL, LLC. (OWNER)
<br />ZONING AND PARKING INFORMATION
<br />ZONING: INDUSTRIAL PUD
<br />SETBACKS (PRINCIPAL BUILDINGS):,
<br />FRONT (CTC BOULEVARD): 50'
<br />REAR (SAME ZONING): 15'
<br />REAR (AGRICULTURAL): 25'
<br />SIDE (NORTH): 10'
<br />SIDE (SOUTH - DILLON RD): 60'
<br />ALLOWABLE MAXIMUM BUILDING HEIGHT:
<br />(PER CITY OF LOUISVILLE IDDSG)
<br />PROPOSED BUILDING HEIGHT: 52'-O"
<br />PARCEL A (LOTS I AND 2):,
<br />BUILDING SIZE:
<br />GROUND FLOOR:
<br />MEZZANINE/SECOND FLOOR (20% MAX.) :
<br />TOTAL:
<br />SETBACKS (PARKING):
<br />FRONT (CTG BOULEVARD): 20'
<br />REAR (SAME ZONING): N/A
<br />REAR (AGRICULTURAL): N/A
<br />SIDE (NORTH): 10'
<br />SIDE (SOUTH - DILLON RD): 30'
<br />40'
<br />PARKING:
<br />INITIAL SPACES:
<br />DEFERRED SPACES (MAXIMUM) :
<br />TOTAL POTENTIAL PARKING:
<br />INITIAL PARKING IS 2.0 SPACES PER 1,000 5.F.
<br />MAXIMUM PARKING 15 APROX. 3.8 SPACES PER 1,000 S.F.
<br />10,500 S.F.
<br />14,500 5.F.
<br />104,800 5.F.
<br />210
<br />1113
<br />405 SPACES
<br />GENERAL NOTES:
<br />I. THE PROJECT 15 TO BE CONSTRUCTED IN ONE PHASE.
<br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST it
<br />ASSOCIATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION.
<br />5. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS:
<br />DECEMBER, 2008
<br />4. CONSTRUCTION MATERIALS AS FOLLOWS:
<br />WALL -5: PRE -CAST CONCRETE PANELS
<br />TYPE A: CREAM
<br />TYPE 5: LIGHT $ROWN
<br />TYPE C: GREEN
<br />ROOF: MEMBRANE (CONCEALED BY PARAPET)
<br />CANOPIES: PRE -CAST - COLOR TO SE DETERMINED DURING P.U.D. PROCESS.
<br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH
<br />5. THE PROJECT 15 TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET
<br />FORTH IN THE BUSINESS CENTER AT COLORADO TECHNOLOGICAL CENTER
<br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 1118, AND
<br />AND THE CITY OF LOUISVILLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS
<br />AND GUIDELINES.
<br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, GUTTER AND ASPHALT
<br />ADJACENT TO THE PERIMETER OF THE SITE THAT 15 CRACKED, SETTLED, OR
<br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED SY THE CONTRACTOR,
<br />A5 DETERMINED NECESSARY SY THE C I TY, AS PART OF THE PROJECT, AND
<br />AT THE DEVELOPER'S EXPENSE.
<br />1. PUBLIC IMPROVEMENTS (CTG BOULEVARD S BOXELDER) TO BE DONE
<br />UNDER SEPARATE APPROVALS IN CONJUNCTION WITH THIS PROJECT.
<br />8. ROOF TOP EQUIPMENT 15 ANTICIPATED AND WILL BE SCREENED.
<br />LOCATIONS, QUANTITIES AND SIZES NOT YET KNOWN.
<br />1. THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING
<br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE
<br />BUILDING PERMIT PROCESS. ANY RETAINING WALLS OVER 50" HIGH
<br />MUST HAVE A 42" HEIGHT GUARD RAIL ON THEM.
<br />10. A PARKING DEFERRAL 15 BEING REQUESTED FOR PARKING IN EXCESS OF
<br />THE MINIMUM 2 SPACES PER 1,000 S.F. OF FLOOR AREA REQUIRED.
<br />SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING.
<br />II. THE BUILDING WILL NOT RECEIVE A CERTIFICATE OF OCCUPANCY
<br />UNTIL THE SANITARY SEWER LIFT STATION ON 104TH STREET 15 COMPLETE.
<br />12. THE PURPOSE OF THE FIRST AMENDMENT (DATED OCT. 19, 2010 ON THE
<br />COVER SHEET ONLY) IS TO EXTEND THE EXPIRATION DATE OF THE FINAL
<br />P.U.D. ALL OTHER ASPECTS OF THE P.U.D. REMAIN UNCHANGED
<br />LAND USE BREAKDOWN
<br />PARCEL A (LOTS I AND 2)
<br />BUILDING COVERAGE:
<br />PARKING AND DRIVES:
<br />PEDESTRIAN HARDSCAPE:
<br />AREA
<br />410,500 5.F.
<br />152,223 5.F.
<br />4,522 S.F.
<br />OPEN SPACE (LANDSCAPED) : 81,872 S.F.
<br />.I I
<br />TOTAL: LOT SIZE
<br />TOTAL BUILDING AREA:
<br />GROUND FLOOR:
<br />MEZZANINE:
<br />317,111 S.F.
<br />1.28 ACRES
<br />104,800 5.F.
<br />10,500 5.F.
<br />14,300 S.F.
<br />PERCENT
<br />28.5%
<br />4I.1%
<br />I.4%
<br />28.4%
<br />I00%
<br />PROJECT DATA
<br />OWNER/CLIENT:
<br />HILL PROPERTIES - CTC LAND, LLC.
<br />7825 FAY AVENUE, SUITE 340
<br />LA JOLLA, CA 1203/
<br />858-456-4045
<br />ARCHITECT:
<br />RVP ARCHITECTURE AND CONSULTING, P.G.
<br />4141 ARAPAHOE AVENUE, SUITE 100
<br />BOULDER, COLORADO 80503
<br />305-445-5355
<br />CIVIL ENGINEER:
<br />HURST 4 ASSOCIATES, INC.
<br />44111 PEARL EAST CIRCLE, SUITE 106
<br />BOULDER, COLORADO 80301
<br />503-4411-41105
<br />LANDSCAPE DESIGN:
<br />NATURE'S DESIGN
<br />156/4 INDIANA GULCH ROAD
<br />JAMESTOWN, COLORADO 80455
<br />503-451-5333
<br />ELECTRICAL / LIGHTING:
<br />ARCHITECTURAL ENGINEERING DESIGN GROUP, INC.
<br />1100 WAZEE STREET, SUITE 255
<br />DENVER, COLORADO 80202
<br />505-216-3034
<br />DRAWING INDEX
<br />COVER SHEET
<br />1 DEVELOPMENT PLAN / DETAILS
<br />2 ELEVATIONS
<br />L1 LANDSCAPE PLAN
<br />L2 PLANT LISTS AND NOTES
<br />C1 SITE IMPROVEMENT PLAN
<br />C2 SITE UTILITY PLAN
<br />E1A PHOTOMETRIC PLAN
<br />E2A LIGHTING CALCULATIONS AND CUT SHEETS
<br />South Boulder
<br />as
<br />Jta
<br />Cherr9 St.
<br />c
<br />Louisville 1
<br />Lafayette
<br />Avist
<br />Hospital
<br />Campus
<br />Monarch HS
<br />•
<br />Health Park Dr.
<br />tee,
<br />Superior
<br />Storage
<br />Technology
<br />VICINITY MAP
<br />NO SCALE
<br />NORTH
<br />o<
<br />O
<br />4.0 03
<br />3
<br />7
<br />0o
<br />r-
<br />aU
<br />co
<br />O
<br />V
<br />0
<br />to
<br />0
<br />PASSCO COLORADO TECH
<br />COLORADO TECHNOLOGICAL CENTER
<br />LOTS 1 & 2, FILING 2
<br />LOUISVILLE, COLORADO
<br />769 CTC BOULEVARD
<br />PROJ NO: 07-17
<br />DATE SEPT. 13, 2007
<br />REV: OCT. 26, 2007
<br />NOV. 26, 2007
<br />NOV. 25, 2009
<br />OCT. 19, 2010
<br />sessevallINIPMINIsfreed
<br />Cleaseillia KO.IID
<br />����
<br />IMdM aotMMN
<br />seortimallheesissedRWMONINtssail
<br />COVER SHtt
<br />
|