Laserfiche WebLink
I- <br />O <br />O <br />0 <br />0 <br />0 <br />(I)V <br />0 <br />0 <br />—J <br />J <br />CO <br />U) <br />C <br />DRAWING NUMBER <br />DRAWING NUMBER <br />C) <br />O <br />N <br />tt <br />V <br />V <br />N <br />co <br />—J <br />DRAWING NUMBER <br />0 <br />N <br />w <br />z <br />z <br />w <br />a <br />0 <br />U) <br />W <br />z <br />• <br />CO <br />U <br />0 <br />CC <br />a <br />U <br />U) <br />REORDER BY PART NUMBER 6552 <br />REORDER B. PART NUMBER 6552 <br />0 <br />W <br />z <br />z <br />W <br />a <br />0 <br />• <br />4 <br />Ii <br />ISI <br />N <br />inn I <br />CCC <br />m <br />2 <br />z i <br />a <br />m <br />w <br />❑ <br />❑ p <br />0¢ <br />a <br />0 <br />u_ <br />C <br />\A_ D.„.D. D <br />CDV <br />1111111111110111111111111 <br />CO.MADO=C-\O.OGCA_ C=\ -.\C \C. 2 <br />Cu SV __-, COOADO <br />DASSCO CO.MA)G =C- �)�S-�A_, __C _OS & 2 <br />CITY COUNCIL CERTIFICATE <br />APPROVED THIS 14 DAY OF SMI i2 , 200 7 , BY THE <br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. 9 SERIES 2-e 9S <br />CITY C..ERK <br />PLANNING COMMISSION CERTIFICATE <br />RECOMMENDED APPROVAL THIS S DAY OF 4E I3 , 200..7 , <br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO.. 2e6 SERIES '2-1507 <br />4!11/4 <br />CHAIRMAN <br />t-1/,P.r <br />SECRETARY <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />EY- II O'CLOCK, A . M., THIS g,1 rd- DAY OF �e_11 ru arc/ <br />204, AND IS RECORDED IN PLAN FILE , FEE '4 I <br />PAID A 91 °% FILM NO. — , RECEPTION 3oL, <br />i1O R <br />RECORDERaI I <br />p <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS :30`" DAY OF OEC t b EP. , 20Q.5_ • <br />J4iar <br />t l<w, <br />PASSCO COLORADO TECH INDUSTRIAL, LLC. (OWNER) <br />NOTARJ <br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF SECTION 16, <br />TOWNSHIP I SOUTH, RANGE 61 WEST, 6TH PRINCIPAL MERIDIAN, CITY OF <br />LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRI BED AS <br />FOLLOWS: LOTS I, AND 2, COLORADO TECHNOLOGICAL CENTER, FILING. <br />NUMBER TWO. <br />ZONING AND PARKING INFORMATION <br />ZONING: INDUSTRIAL PUD <br />SETBACKS (PRINCIPAL BUILDINGS): <br />FRONT (CTG BOULEVARD): 30' <br />REAR (SAME ZONING): 15' <br />REAR (AGRICULTURAL): 25' <br />51 DE (NORTH) : 10' <br />SIDE (SOUTH - DILLON RD): 60' <br />ALLOWABLE MAXIMUM BUILDING HEIGHT: <br />(PER CITY OF LOUISVILLE IDDSG) <br />PROPOSED BUILDING HEIGHT: 32'-O" <br />SETBACKS (PARKING): <br />FRONT (CTC BOULEVARD): 20' <br />REAR (SAME ZONING): N/A <br />REAR (AGRICULTURAL): N/A <br />SIDE (NORTH): I0' <br />SIDE (SOUTH - DILLON RD): 30' <br />40' <br />PARCEL A (LOTS I AND 2): <br />BUILDING SIZE: <br />GROUND FLOOR: <br />MEZZANINE/SECOND FLOOR (20% MAX.) : <br />TOTAL: <br />PARKING: <br />INITIAL SPACES: <br />DEFERRED SPACES (MAXIMUM): <br />TOTAL POTENTIAL PARKING: <br />INITIAL PARKING IS 2.0 SPACES PER 1,000 S.F. <br />MAXIMUM PARKING 15 APROX. 3.8 SPACES PER 1,000 S.F. <br />10,500 S.F. <br />14.300 S.F. <br />104,800 S.F. <br />210 <br />113 <br />403 SPACES <br />GENERAL NOTES: <br />I. THE PROJECT 15 TO BE CONSTRUCTED IN ONE PHASE. <br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST 4 <br />ASSOCIATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION. <br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS: <br />DECEMBER, 2008 <br />4. CONSTRUCTION MATERIALS A5 FOLLOWS: <br />WALLS: PRE -CAST CONCRETE PANELS <br />TYPE A: CREAM <br />TYPE B: LIGHT BROWN <br />TYPE C: GREEN <br />ROOF: MEMBRANE (CONCEALED BY PARAPET) <br />CANOPIES: PRE -CAST - COLOR TO BE DETERMINED DURING P.U.D. PROCESS. <br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH <br />5. THE PROJECT IS TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET <br />FORTH IN THE BUSINESS CENTER AT COLORADO TECHNOLOGICAL CENTER <br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 1118, AND <br />AND THE CITY OF LOUISVILLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS <br />AND GUIDELINES. <br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, GUTTER AND ASPHALT <br />ADJACENT TO THE PERIMETER OF THE SITE THAT IS CRACKED, SETTLED, OR <br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR, <br />AS DETERMINED NECESSARY BY THE CITY, AS PART OF THE PROJECT, AND <br />AT THE DEVELOPER'S EXPENSE. <br />1. PUBLIC IMPROVEMENTS (CTC BOULEVARD 4 BOXELDER) TO BE DONE <br />UNDER SEPARATE APPROVALS IN CONJUNCTION WITH THIS PROJECT. <br />8. ROOF TOP EQUIPMENT 15 ANTICIPATED AND WILL BE SCREENED. <br />LOCATIONS, QUANTITIES AND 5IZE5 NOT YET KNOWN. <br />1. THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING <br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE <br />BUILDING PERMIT PROCESS. ANY RETAINING WALLS OVER 30" HIGH <br />MUST HAVE A 42" HEIGHT GUARD RAIL ON THEM. <br />10. A PARKING DEFERRAL 15 BEING REQUESTED FOR PARKING I N EXCESS OF <br />THE MINI MUM 2 SPACES PER 1,000 S.F. OF FLOOR AREA REQU I RED. <br />SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING. <br />I I . THE BUILDING WILL NOT RECEIVE A CERTIFICATE OF OCCUPANCY <br />UNTIL THE SANITARY SEWER LIFT STATION ON 104TH STREET 15 COMPLETE. <br />LAND USE BREAKDOWN <br />PARCEL A (LOTS I AND 2) <br />BU!LDING COVERAGE: <br />PARKING AND DRIVES: <br />PEDESTRIAN HARDSCAPE: <br />OPEN SPACE (LANDSCAPED) : <br />TOTAL: LOT SIZE <br />TOTAL BUILDING AREA: <br />GROUND FLOOR: <br />MEZZANINE: <br />AREA <br />10,500 5.F. <br />132,223 S.F. <br />4,522 S.F. <br />81,812 S.F. <br />311,111 S.F. <br />1.28 ACRES <br />104,800 5.F. <br />10,500 S.F. <br />14,300 S.F. <br />PERCENT <br />28.5% <br />41.1% <br />1.4% <br />28.4% <br />100% <br />PROJECT DATA <br />OWNER/CLIENT: <br />HILL PROPERTIES - GTO LAND, LLC <br />1825 FAY AVENUE, SUITE 340 <br />LA JOLLA, CA 12031 <br />858-456-4045 <br />ARCHITECT: <br />RVP ARCHITECTURE AND CONSULTING, P.C. <br />4141 ARAPAHOE AVENUE, SUITE 100 <br />BOULDER, COLORADO 80303 <br />303-443-5355 <br />CIVIL ENGINEER: <br />HURST 4 ASSOCIATES, INC. <br />4111 PEARL EAST C I ROLE, SU I TE 106 <br />BOULDER, COLORADO 80301 <br />303-441-1105 <br />LANDSCAPE DESIGN: <br />NATURE'S DESIGN <br />15614 INDIANA GULCH ROAD <br />JAMESTOWN, COLORADO 80455 <br />303-451-3333 <br />ELECTRICAL / LIGHTING: <br />ARCHITECTURAL ENGINEERING DESIGN GROUP, INC. <br />1100 NAME STREET, SUITE 255 <br />DENVER, COLORADO 80202 <br />303-216-3034 <br />DRAWl NJ (3 INDEX <br />COVER SHEET <br />1 DEVELOPMENT PLAN / DETAILS <br />2 ELEVATIONS <br />L1 LANDSCAPE PLAN <br />L2 PLANT LISTS AND NOTES <br />C1 SITE IMPROVEMENT PLAN <br />C2 SITE UTILITY PLAN <br />E1A PHOTOMETRIC PLAN <br />E2A LIGHTING CALCULATIONS AND CUT SHEETS <br />South Boulder <br />Cherry St. <br />Louisville <br />Lafayette <br />GO. ST. HWY. 42 <br />P i r <br />Empires Rd. <br />Gt <br />(4.0 <br />Dillon Rd. <br />ITE <br />Avist <br />Hospital <br />Campus <br />Superior <br />Monarch HS <br />Health Park Dr. <br />Storage <br />Technology <br />13 <br />VICINITY MAP <br />NO SCALE <br />NORTH <br />c5 <br />10 I 0 <br />0 o 0 a0 <br />r o <br />0oa <br />4. co i <br />.E <br />C <br />.2 0 <br />0 5 I <br />a C Si <br />0 OSZ t a < oO oL� ro <br />L <br />a. O <br />ctii <br />;....i Ti <br />71 <br />4 MI <br />U <br />I <br />I <br />.36 <br />CJ) <br />LU <br />COLORADO TECHNOLOGICAL CENTER <br />LOTS 1 & 2, FILING 2 <br />LOUISVILLE, COLORADO <br />7b9 CTC BOULEVARD <br />PROJ NO: 07-17 <br />DATE: <br />REV: <br />SEPT.13, 2007 <br />OCT. 26, 2007 <br />NOV. 26, 2007 <br />NOV. 25, 2009 <br />olrM O <br />11/111)4114011. <br />000 M l al <br />Oomo,PAC. Niloow <br />dratlisaMallsmanimId <br />keildoz:rtleeseller <br />somused1Mobefistitisail <br />COVER SHtt <br />