Laserfiche WebLink
CITY COUNCIL CERTIFICATE <br />\A <br />I `\,.." I D I <br />�S- AV\DV <br />COOADO-=C-\O.OGCA_ C=\--� _ _ \G \0. 2 <br />_OU SV __-, CO_MADO <br />ASSCO CO.MADO -=C- \)SR A, __C _OS b & 7 <br />APPROVED THIS &tit DAY OF GEPreneie 2 , 20 II , BY THE <br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. 64 SERIES 2-011 <br />441 <br />" <br />MAYOR <br />PLANNING COMMISSION CERTIFICATE <br />RECOMMENDED APPROVAL THIS I i*' DAY OF A4.61 6.- ' , 20 111 <br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. I6?) SERIES 2011 <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />Lig O'CLOCK, / . M., THIS DAY OF f hob <br />20L , AND IS RECORDED IN PLAN FILE JV , FEE 4 P. els <br />PAID - FILM NO. , RECEPTION ( S <br />RECORDER DEPUTY <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS ADAY OF , 2012- <br />PASSCO COL O TE7 INDUSTRIAL, LLC. <br />L( Drow <br />V� a <br />fYli561(Y)* MN -1g )atiOtitaii+ <br />L\-- °NOTARY <br />(OWNER) <br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF SECTION 16, <br />TOWNSHIP I SOUTH, RANGE 61 WEST, 6TH PRI NG I PAL MERIDIAN, CITY OF <br />LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRIBED AS <br />FOLLOWS: LOTS 6, AND 1, COLORADO TECHNOLOGICAL CENTER, FILING. <br />NUMBER TWO. <br />ZONING AND PARKING INFORMATION <br />ZONING: INDUSTRIAL PUD <br />SETBACKS (PRINCIPAL BUILDINGS): <br />FRONT (CTC BOULEVARD): 30' <br />REAR (SAME ZONING) : 15' <br />REAR (AGRICULTURAL): 25' <br />SIDE (NORTH): 10' <br />SIDE (SOUTH - DILLON RD): 60' <br />SETBACKS (PARKING): <br />FRONT (CTG BOULEVARD): 20' <br />REAR (SAME ZONING) : N/A <br />REAR (AGRICULTURAL): N/A <br />5I DE (NORTH) : 10' <br />SIDE (SOUTH - DILLON RD): 30' <br />ALLOWABLE MAXIMUM BUILDING HEIGHT: 40' <br />(PER CITY OF LOUISVILLE IDose) <br />PROPOSED BUILDING HEIGHT: 32'-O" <br />PARCEL A (LOTS 6 AND 1): <br />BUILDING SIZE: <br />GROUND FLOOR: <br />MEZZANINE/SECOND FLOOR (20% MAX.): <br />TOTAL: <br />PARKING: <br />INITIAL SPACES: <br />DEFERRED SPACES (MAXI MUM) : <br />TOTAL POTENTIAL PARKING: <br />INITIAL PARKING IS 2.0 SPACES PER 1,000 S.F. <br />MAXIMUM PARKING IS APROX. 3.6 SPACES PER 1,000 S.F. <br />12,550 S.F. <br />I I ,880 S.F. <br />84,430 S.F. <br />LAND USE BREAKDOWN <br />PARCEL A (LOTS I AND 2) <br />BUILDING COVERAGE: <br />PARKING AND DRIVES: <br />PEDESTRIAN HARDSCAPE: <br />OPEN SPACE (LANDSCAPED) : <br />TOTAL: LOT SIZE <br />TOTAL BUILDING AREA: <br />112 GROUND FLOOR: <br />133 MEZZANINE: <br />305 SPACES <br />GENERAL NOTES: <br />I. THE PROJECT IS TO BE CONSTRUCTED IN ONE PHASE. <br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST 4 <br />ASSOC I ATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION. <br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS: <br />DECEMBER, 2008 <br />4. CONSTRUCTION MATERIALS A5 FOLLOWS: <br />WALLS: PRE -CAST CONCRETE PANELS <br />TYPE A: CREAM <br />TYPE B: LIGHT BROWN <br />TYPE C: GREEN <br />ROOF: MEMBRANE (CONGEALED BY PARAPET) <br />CANOPIES: PRE -CAST - COLOR TO BE DETERMINED DURING P.U.D. PROCESS. <br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH <br />5. THE PROJECT IS TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET <br />FORTH IN THE BUSINESS CENTER AT COLORADO TECHNOLOG I CAL CENTER <br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 1118, AND <br />AND THE CITY OF LOUISVILLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS <br />AND GUIDELINES. <br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, CUTTER AND ASPHALT <br />ADJACENT TO THE PERIMETER OF THE SITE THAT IS CRACKED, SETTLED, OR <br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR, <br />AS DETERMINED NECESSARY BY THE CITY, AS PART OF THE PROJECT, AND <br />AT THE DEVELOPER'S EXPENSE. <br />7. PUBLIC IMPROVEMENTS (CTG BOULEVARD 4 BOXELDER) TO BE DONE <br />UNDER SEPARATE APPROVALS IN CONJUNCTION WITH THIS PROJECT. <br />8. ROOF TOP EQUIPMENT 15 ANTI G I PATED AND WILL BE SCREENED. <br />LOCATIONS, QUANTITIES AND SIZES NOT YET KNOWN. <br />THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING <br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE <br />BUILDING PERMIT PROCESS. ANY RETAINING WALLS OVER 30" HIGH <br />MUST HAVE A 42" HEIGHT GUARD RAIL ON THEM. <br />10. A PARKING DEFERRAL 15 BEING REQUESTED FOR PARKING IN EXCESS OF <br />THE MINIMUM 2 SPACES PER 1,000 S.F. OF FLOOR AREA REQUIRED. <br />SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING. <br />I1. THE BUILDING WILL NOT RECEIVE A CERTIFICATE OF OCCUPANCY <br />UNTIL THE SANITARY SEWER LIFT STATION ON 104TH STREET IS COMPLETE. <br />12. THE PURPOSE OF THE FIRST AMENDMENT (DATED OCT. 141, 2010 ON THE <br />COVER SHEET ONLY) 15 TO EXTEND THE EXPIRATION DATE OF THE FINAL <br />P.U.D. ALL OTHER ASPECTS OF THE P.U.D. REMAIN UNCHANGED <br />AREA <br />12,250 S.F. <br />112,57/ S.F. <br />4,172 5.F. <br />63,321 S.F. <br />252,320 S.F. <br />5./1 ACRES <br />84,430 S.F. <br />12,550 S.F. <br />11,850 S.F. <br />PERCENT <br />28.6% <br />44.6% <br />1.1% <br />25.I% <br />10096 <br />PROJECT DATA <br />OWNER/CL I ENT: <br />PASSCO COLORADO TECH INDUSTRIAL, LLC. <br />16 CORPORATE PARK, SU I TE 200 <br />IRVINE, GA 12606 <br />4144-442-I000 <br />ARCHITECT: <br />RVP ARCHITECTURE AND CONSULTING, P.G. <br />4141 ARAPAHOE AVENUE, SUITE 100 <br />BOULDER, COLORADO 80303 <br />303-443-5355 <br />CIVIL ENGINEER: <br />HURST 4 ASSOC I ATES, INC.. <br />4111 PEARL EAST CIRCLE, SUITE 106 <br />BOULDER, COLORADO 80301 <br />303-441-1105 <br />LANDSCAPE DESIGN: <br />NATURE'S DESIGN <br />15674 1 ND I ANA GULCH ROAD <br />JAMEST0WN, COLORADO 80455 <br />303-451-3333 <br />ELECTRICAL / LIGHTING: <br />ARCH! TEGTURAL ENGINEERING DESIGN GROUP, INC.. <br />1100 WAZEE STREET, SU I TE 255 <br />DENVER, COLORADO 80202 <br />303-216-3034 <br />ORAW1NG INDEX <br />COVER SHEET <br />1 DEVELOPMENT PLAN / DETAILS <br />2 ELEVATIONS <br />L1 LANDSCAPE PLAN <br />L2 PLANT LISTS AND NOTES <br />C1 SITE IMPROVEMENT PLAN <br />C2 SITE UTILITY PLAN <br />E1C PHOTOMETRIC PLAN <br />E2C LIGHTING CALCULATIONS AND CUT SHEETS <br />South Boulder <br />ji6 <br />Cherry St. <br />t11 <br />Louisvi I le <br />Lafayette <br />FmpIre <br />Avast <br />Hospital <br />Campus <br />1 <br />Superior <br />Monarch HS <br />Health Pork Dr. <br />Storage <br />Technology <br />VICINITY MAP <br />NO SCALE <br />NORTh-1 <br />1 <br />0 CO <br />1- <br />0 <br />7 <br />CO <br />co <br />0 <br />1,3 <br />U. <br />to <br />ioN <br />M <br />a <br />cry <br />U <br />w <br />0 <br />0 <br />0 <br />U <br />cry <br />cry <br />a <br />COLORADO TECHNOLOGICAL CENTER <br />LOTS b & 7, FILING 2 <br />LOUISVILLE, COLORADO <br />BOULEVARD <br />U <br />10 <br />PROJ NO: 07-17 <br />DATE: SEPT. 13, 2007 <br />REV: OCT. 26, 2007 <br />NOV. 26, 2007 <br />SEPT. 17, 2008 <br />SEPT. 24, 2008 <br />OCT. 19, 2010 <br />MAY 22, 2012 <br />Copyright ©2007 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. AO design <br />drawings and written material <br />herein may no4 be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />COVER Mitt' <br />t3:7V,11IN LUVd <br />OS3NNIW `3d0H MON f <br />CA <br />CO <br />33 <br />m <br />0 <br />✓=13BWnN 1bbd <br />S.Lonaoad 00OVS <br />• <br />z <br />0 <br />13 <br />o <br />OI <br />0. <br />0 <br />0 <br />0 <br />0 <br />C2 <br />n <br />