CITY COUNCIL CERTIFICATE
<br />\A
<br />I `\,.." I D I
<br />�S- AV\DV
<br />COOADO-=C-\O.OGCA_ C=\--� _ _ \G \0. 2
<br />_OU SV __-, CO_MADO
<br />ASSCO CO.MADO -=C- \)SR A, __C _OS b & 7
<br />APPROVED THIS &tit DAY OF GEPreneie 2 , 20 II , BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. 64 SERIES 2-011
<br />441
<br />"
<br />MAYOR
<br />PLANNING COMMISSION CERTIFICATE
<br />RECOMMENDED APPROVAL THIS I i*' DAY OF A4.61 6.- ' , 20 111
<br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. I6?) SERIES 2011
<br />CLERK AND RECORDER CERTIFICATE
<br />(COUNTY OF BOULDER
<br />STATE OF COLORADO)
<br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT
<br />Lig O'CLOCK, / . M., THIS DAY OF f hob
<br />20L , AND IS RECORDED IN PLAN FILE JV , FEE 4 P. els
<br />PAID - FILM NO. , RECEPTION ( S
<br />RECORDER DEPUTY
<br />OWNERSHIP SIGNATURE BLOCK
<br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL
<br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D.
<br />WITNESS OUR HANDS AND SEALS THIS ADAY OF , 2012-
<br />PASSCO COL O TE7 INDUSTRIAL, LLC.
<br />L( Drow
<br />V� a
<br />fYli561(Y)* MN -1g )atiOtitaii+
<br />L\-- °NOTARY
<br />(OWNER)
<br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF SECTION 16,
<br />TOWNSHIP I SOUTH, RANGE 61 WEST, 6TH PRI NG I PAL MERIDIAN, CITY OF
<br />LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRIBED AS
<br />FOLLOWS: LOTS 6, AND 1, COLORADO TECHNOLOGICAL CENTER, FILING.
<br />NUMBER TWO.
<br />ZONING AND PARKING INFORMATION
<br />ZONING: INDUSTRIAL PUD
<br />SETBACKS (PRINCIPAL BUILDINGS):
<br />FRONT (CTC BOULEVARD): 30'
<br />REAR (SAME ZONING) : 15'
<br />REAR (AGRICULTURAL): 25'
<br />SIDE (NORTH): 10'
<br />SIDE (SOUTH - DILLON RD): 60'
<br />SETBACKS (PARKING):
<br />FRONT (CTG BOULEVARD): 20'
<br />REAR (SAME ZONING) : N/A
<br />REAR (AGRICULTURAL): N/A
<br />5I DE (NORTH) : 10'
<br />SIDE (SOUTH - DILLON RD): 30'
<br />ALLOWABLE MAXIMUM BUILDING HEIGHT: 40'
<br />(PER CITY OF LOUISVILLE IDose)
<br />PROPOSED BUILDING HEIGHT: 32'-O"
<br />PARCEL A (LOTS 6 AND 1):
<br />BUILDING SIZE:
<br />GROUND FLOOR:
<br />MEZZANINE/SECOND FLOOR (20% MAX.):
<br />TOTAL:
<br />PARKING:
<br />INITIAL SPACES:
<br />DEFERRED SPACES (MAXI MUM) :
<br />TOTAL POTENTIAL PARKING:
<br />INITIAL PARKING IS 2.0 SPACES PER 1,000 S.F.
<br />MAXIMUM PARKING IS APROX. 3.6 SPACES PER 1,000 S.F.
<br />12,550 S.F.
<br />I I ,880 S.F.
<br />84,430 S.F.
<br />LAND USE BREAKDOWN
<br />PARCEL A (LOTS I AND 2)
<br />BUILDING COVERAGE:
<br />PARKING AND DRIVES:
<br />PEDESTRIAN HARDSCAPE:
<br />OPEN SPACE (LANDSCAPED) :
<br />TOTAL: LOT SIZE
<br />TOTAL BUILDING AREA:
<br />112 GROUND FLOOR:
<br />133 MEZZANINE:
<br />305 SPACES
<br />GENERAL NOTES:
<br />I. THE PROJECT IS TO BE CONSTRUCTED IN ONE PHASE.
<br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST 4
<br />ASSOC I ATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION.
<br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS:
<br />DECEMBER, 2008
<br />4. CONSTRUCTION MATERIALS A5 FOLLOWS:
<br />WALLS: PRE -CAST CONCRETE PANELS
<br />TYPE A: CREAM
<br />TYPE B: LIGHT BROWN
<br />TYPE C: GREEN
<br />ROOF: MEMBRANE (CONGEALED BY PARAPET)
<br />CANOPIES: PRE -CAST - COLOR TO BE DETERMINED DURING P.U.D. PROCESS.
<br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH
<br />5. THE PROJECT IS TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET
<br />FORTH IN THE BUSINESS CENTER AT COLORADO TECHNOLOG I CAL CENTER
<br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 1118, AND
<br />AND THE CITY OF LOUISVILLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS
<br />AND GUIDELINES.
<br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, CUTTER AND ASPHALT
<br />ADJACENT TO THE PERIMETER OF THE SITE THAT IS CRACKED, SETTLED, OR
<br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR,
<br />AS DETERMINED NECESSARY BY THE CITY, AS PART OF THE PROJECT, AND
<br />AT THE DEVELOPER'S EXPENSE.
<br />7. PUBLIC IMPROVEMENTS (CTG BOULEVARD 4 BOXELDER) TO BE DONE
<br />UNDER SEPARATE APPROVALS IN CONJUNCTION WITH THIS PROJECT.
<br />8. ROOF TOP EQUIPMENT 15 ANTI G I PATED AND WILL BE SCREENED.
<br />LOCATIONS, QUANTITIES AND SIZES NOT YET KNOWN.
<br />THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING
<br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE
<br />BUILDING PERMIT PROCESS. ANY RETAINING WALLS OVER 30" HIGH
<br />MUST HAVE A 42" HEIGHT GUARD RAIL ON THEM.
<br />10. A PARKING DEFERRAL 15 BEING REQUESTED FOR PARKING IN EXCESS OF
<br />THE MINIMUM 2 SPACES PER 1,000 S.F. OF FLOOR AREA REQUIRED.
<br />SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING.
<br />I1. THE BUILDING WILL NOT RECEIVE A CERTIFICATE OF OCCUPANCY
<br />UNTIL THE SANITARY SEWER LIFT STATION ON 104TH STREET IS COMPLETE.
<br />12. THE PURPOSE OF THE FIRST AMENDMENT (DATED OCT. 141, 2010 ON THE
<br />COVER SHEET ONLY) 15 TO EXTEND THE EXPIRATION DATE OF THE FINAL
<br />P.U.D. ALL OTHER ASPECTS OF THE P.U.D. REMAIN UNCHANGED
<br />AREA
<br />12,250 S.F.
<br />112,57/ S.F.
<br />4,172 5.F.
<br />63,321 S.F.
<br />252,320 S.F.
<br />5./1 ACRES
<br />84,430 S.F.
<br />12,550 S.F.
<br />11,850 S.F.
<br />PERCENT
<br />28.6%
<br />44.6%
<br />1.1%
<br />25.I%
<br />10096
<br />PROJECT DATA
<br />OWNER/CL I ENT:
<br />PASSCO COLORADO TECH INDUSTRIAL, LLC.
<br />16 CORPORATE PARK, SU I TE 200
<br />IRVINE, GA 12606
<br />4144-442-I000
<br />ARCHITECT:
<br />RVP ARCHITECTURE AND CONSULTING, P.G.
<br />4141 ARAPAHOE AVENUE, SUITE 100
<br />BOULDER, COLORADO 80303
<br />303-443-5355
<br />CIVIL ENGINEER:
<br />HURST 4 ASSOC I ATES, INC..
<br />4111 PEARL EAST CIRCLE, SUITE 106
<br />BOULDER, COLORADO 80301
<br />303-441-1105
<br />LANDSCAPE DESIGN:
<br />NATURE'S DESIGN
<br />15674 1 ND I ANA GULCH ROAD
<br />JAMEST0WN, COLORADO 80455
<br />303-451-3333
<br />ELECTRICAL / LIGHTING:
<br />ARCH! TEGTURAL ENGINEERING DESIGN GROUP, INC..
<br />1100 WAZEE STREET, SU I TE 255
<br />DENVER, COLORADO 80202
<br />303-216-3034
<br />ORAW1NG INDEX
<br />COVER SHEET
<br />1 DEVELOPMENT PLAN / DETAILS
<br />2 ELEVATIONS
<br />L1 LANDSCAPE PLAN
<br />L2 PLANT LISTS AND NOTES
<br />C1 SITE IMPROVEMENT PLAN
<br />C2 SITE UTILITY PLAN
<br />E1C PHOTOMETRIC PLAN
<br />E2C LIGHTING CALCULATIONS AND CUT SHEETS
<br />South Boulder
<br />ji6
<br />Cherry St.
<br />t11
<br />Louisvi I le
<br />Lafayette
<br />FmpIre
<br />Avast
<br />Hospital
<br />Campus
<br />1
<br />Superior
<br />Monarch HS
<br />Health Pork Dr.
<br />Storage
<br />Technology
<br />VICINITY MAP
<br />NO SCALE
<br />NORTh-1
<br />1
<br />0 CO
<br />1-
<br />0
<br />7
<br />CO
<br />co
<br />0
<br />1,3
<br />U.
<br />to
<br />ioN
<br />M
<br />a
<br />cry
<br />U
<br />w
<br />0
<br />0
<br />0
<br />U
<br />cry
<br />cry
<br />a
<br />COLORADO TECHNOLOGICAL CENTER
<br />LOTS b & 7, FILING 2
<br />LOUISVILLE, COLORADO
<br />BOULEVARD
<br />U
<br />10
<br />PROJ NO: 07-17
<br />DATE: SEPT. 13, 2007
<br />REV: OCT. 26, 2007
<br />NOV. 26, 2007
<br />SEPT. 17, 2008
<br />SEPT. 24, 2008
<br />OCT. 19, 2010
<br />MAY 22, 2012
<br />Copyright ©2007 - All rights
<br />reserved RVP Architecture and
<br />Consulting, P.C. AO design
<br />drawings and written material
<br />herein may no4 be used or
<br />duplicated without the written
<br />consent of RVP Architecture and
<br />Consulting, P.C.
<br />COVER Mitt'
<br />t3:7V,11IN LUVd
<br />OS3NNIW `3d0H MON f
<br />CA
<br />CO
<br />33
<br />m
<br />0
<br />✓=13BWnN 1bbd
<br />S.Lonaoad 00OVS
<br />•
<br />z
<br />0
<br />13
<br />o
<br />OI
<br />0.
<br />0
<br />0
<br />0
<br />0
<br />C2
<br />n
<br />
|