0
<br />.a
<br />c
<br />1.
<br />O
<br />O
<br />0
<br />c.)
<br />u)
<br />a
<br />ix
<br />w
<br />Q
<br />cc
<br />CC
<br />z
<br />0
<br />O
<br />0
<br />w
<br />z
<br />z
<br />Li;
<br />a
<br />0
<br />w
<br />w
<br />z
<br />.
<br />SAFCO PRODUCTS
<br />0
<br />w
<br />z
<br />z
<br />• NEW NOPE,
<br />0
<br />0
<br />0
<br />CC
<br />a
<br />0
<br />.0
<br />1CI)
<br />REORDER BY PART NUMBER 6552
<br />REORDER 6 . PART NUMBER 6552
<br />REORDER BY PART NUMBER 6552
<br />REORDER 6. PART NUMBER 6552
<br />POSITION EDGE OF PRINT UN I MIS LINE
<br />P USI I IUN tUGE Ut PN1N I UN !HIE LINt
<br />POSITION EDGE OF PRINT ON THIS LINE
<br />\A
<br />.,.D.
<br />1111111111111
<br />V
<br />oDv
<br />COOADO EC-\OOGCA _ \G \0. 2
<br />OUSV __-, COOADO
<br />pASSCO CO.MA)0 -=C- \)Si A, __C O'S b &
<br />CITY COUNCIL CERTIFICATE
<br />APPROVED THIS 411— DAY OF FE VARY , 200 ® , BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. 3 SERIES 2c
<br />IttoCtutmu
<br />City cuwc
<br />PLANNING COMMISSION CERTIFICATE
<br />RECOMMENDED APPROVAL THIS g DAY OF NoysM2 r'- , 200 ? ,
<br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. Z'S SERIES 24C°7
<br />CLERK AND RECORDER CERTIFICATE
<br />(COUNTY OF BOULDER
<br />STATE OF COLORADO)
<br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT
<br />_ O'CLOCK, � . M., THIS 2S+h DAY OF _sail* jay
<br />20/1 , AND RECORDED IN PLAN FILE , FEE di91 f"
<br />PAID 4 9 I. FILM NO. , RECEPTION VI 7,761;
<br />p-hI F. -* 37/, 7,11,9 ,r0, 1 1,1 a 413
<br />RECti tlti
<br />ORDER a
<br />DEPU�
<br />OWNERSHIP SIGNATURE BLOCK
<br />.
<br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL
<br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D.
<br />WITNESS OUR HANDS AND SEALS THIS DAY OF .
<br />PASSCOO�
<br />N ARj
<br />TECH INDUSTRIAL
<br />My Commission Expitcz 9/17/2010
<br />.
<br />LEGAL DESCRIPTION: PART OF THE SOUTH ' % R OF SECTION 16,
<br />TOWNSHIP I SOUTH, RANGE 661 WEST, 6TH PRI NC -`• MERIDIAN, CITY OF
<br />LOU I SV I LLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRIBED A5
<br />FOLLOWS: LOTS 6, AND 1, COLORADO TECHNOLOGICAL CENTER, FILING.
<br />NUMBER TWO.
<br />ZONING AND PARKING INFORMATION
<br />ZONING: INDUSTRIAL PUD
<br />SETBACKS (PRI NC I PAL MI LD I NO5) :
<br />FRONT (CTG BOULEVARD): 50'
<br />REAR (SAME ZONING): 15'
<br />REAR (AGRI CULTURAL): 25'
<br />SIDE (NORTH): l0'
<br />SIDE (SOUTH - DILLON RD): 60'
<br />ALLOWABLE MAXIMUM BUILDING HEIGHT:
<br />(PER CITY OF LOUISVILLE I DDSG)
<br />PROPOSED BUILDING HEIGHT: 32'-O"
<br />SETBACKS (PARKING):
<br />FRONT (CTG BOULEVARD): 20'
<br />REAR (SAME ZONING) : N/A
<br />REAR (AGRICULTURAL): N/A
<br />SIDE (NORTH): I0'
<br />SIDE (SOUTH - DILLON RD): 30'
<br />40'
<br />PARCEL A (LOTS 6 AND 1):
<br />BUILDING SIZE:
<br />GROUND FLOOR:
<br />MEZZANINE/SECOND FLOOR (20% MAX.):
<br />TOTAL:
<br />PARKING:
<br />INITIAL SPACES:
<br />DEFERRED SPACES (MAXI MUM) :
<br />TOTAL POTENTIAL PARKING:
<br />INITIAL PARKING IS 2.0 SPACES PER 1,000 5.F.
<br />MAXI MUM PARKING 15 APROX. 3.6 SPACES PER 1,000 S.F.
<br />12,550 5.F.
<br />II .550 S.F.
<br />84,430 5.F.
<br />LAND USE BREAKDOWN
<br />PERCENT 1
<br />PARCEL A (LOTS I AND 2)
<br />BUILDING COVERAGE:
<br />PARKING AND DRIVES:
<br />PEDESTRIAN HARDSGAPE:
<br />OPEN SPACE (LANDSCAPED):
<br />TOTAL: LOT SIZE
<br />TOTAL BUILDING AREA:
<br />112 GROUND FLOOR:
<br />133 MEZZANINE:
<br />305 SPACES
<br />GENERAL NOTES:
<br />1. THE PROJECT 15 TO BE CONSTRUCTED IN ONE PHASE.
<br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST 4
<br />ASSOCIATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION.
<br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS:
<br />DECEMBER, 2008
<br />4. CONSTRUCTION MATERI ALS AS FOLLOWS:
<br />WALLS: PRE -CAST CONCRETE PANELS
<br />TYPE A: CREAM
<br />TYPE B: LIGHT BROWN
<br />TYPE C: GREEN
<br />ROOF: MEMBRANE (CONCEALED BY PARAPET)
<br />CANOPIES: PRE -CAST - COLOR TO BE DETERMINED DURING P.U.D. PROCESS.
<br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH
<br />5. THE PROJECT 15 TO BE DESIGNED I N ACCORDANCE WITH CRI TER I A SET
<br />FORTH IN THE BUSINESS CENTER AT COLORADO TEGHNOLOGI CAL CENTER
<br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 161418, AND
<br />AND THE CITY OF LOUISVILLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS
<br />AND GUIDELINES.
<br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, GUTTER AND ASPHALT
<br />ADJACENT TO THE PERIMETER OF THE 51 TE THAT 15 CRACKED, SETTLED, OR
<br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR,
<br />AS DETERMINED NECESSARY BY THE C I TY, A5 PART OF THE PROJECT, AND
<br />AT THE DEVELOPER'S EXPENSE.
<br />1. PUBLIC IMPROVEMENTS (CTG BOULEVARD 4 BOXELDER) TO BE DONE
<br />UNDER SEPARATE APPROVALS I N CONJUNCTION WITH TH 15 PROJECT.
<br />8. ROOF TOP EQUIPMENT 15 ANTICIPATED AND WILL BE SCREENED.
<br />LOCATIONS, QUANTI TIES AND 51 ZE5 NOT YET KNOWN.
<br />q. THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING
<br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE
<br />BUILDING PERMIT PROCESS. ANY RETAINING WALLS OVER 30" HIGH
<br />MUST HAVE A 42" HEIGHT GUARD RAIL ON THEM.
<br />10. A PARKING DEFERRAL 15 BEING REQUESTED FOR PARKING I N EXCESS OF
<br />THE MINIMUM 2 SPACES PER 1,000 5.F. OF FLOOR AREA REQUIRED.
<br />SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING.
<br />1 I . THE BUILDING WILL NOT RECEIVE A CERTIFICATE OF OCCUPANCY
<br />UNTIL THE SANITARY SEWER LIFT STATION ON 104TH STREET 15 COMPLETE.
<br />AREA
<br />12,250 5.F. 25.6%
<br />I12,46q 5.F. 44.6%
<br />4,112 S.F. I.1%
<br />63,321 S.F. 25.1%
<br />311,111 5.F. 100%
<br />1.28 ACRES
<br />84,430 S.F.
<br />12,550 S.F.
<br />I I ,880 5.F.
<br />PROJECT DATA
<br />OWNER/CL I ENT:
<br />PASSCO COLORADO TECH INDUSTRIAL, LLC.
<br />qb CORPORATE PARK, SU I TE 200
<br />IRVINE, CA 612606
<br />q44-442-1000
<br />ARCHITECT:
<br />RVP ARCHITECTURE AND CONSULTING, P.G.
<br />4141 ARAPAHOE AVENUE, 5U I TE 100
<br />BOULDER, COLORADO 80303
<br />305-443-5355
<br />CIVIL ENGINEER:
<br />HURST 4 ASSOC IATES, INC..
<br />4ggq PEARL EAST CIRCLE, SU! TE 106
<br />BOULDER, COLORADO 80301
<br />505-44°1-41105
<br />LANDSCAPE DESIGN:
<br />NATURE'S DES! GN
<br />15614 IND I ANA GULCH ROAD
<br />JAMESTOWN, COLORADO 80455
<br />303-45q-3333
<br />ELECTRICAL / LIGHTING:
<br />ARCHITECTURAL ENGINEERING DESIGN GROUP, INC.
<br />16100 WAZEE STREET, SUITE 255
<br />DENVER, COLORADO 80202
<br />303-2q6-3034
<br />DRAWING INDEX
<br />COVER SHEET
<br />1 DEVELOPMENT PLAN / DETAILS
<br />2 ELEVATIONS
<br />L1 LANDSCAPE PLAN
<br />L2 PLANT LISTS AND NOTES
<br />C1 SITE IMPROVEMENT PLAN
<br />C2 SITE UTILITY PLAN
<br />E1C PHOTOMETRIC PLAN
<br />E2C LIGHTING CALCULATIONS AND CUT SHEETS
<br />South Boulder
<br />Cherry St.
<br />Avist
<br />Hospital
<br />Campus
<br />N
<br />c
<br />Louisville 1
<br />Lafayette
<br />Empire Rd
<br />ITE
<br />Monarch HS
<br />•
<br />Health Pork Dr.
<br />Superior
<br />~ '
<br />p
<br />Storage
<br />Technology
<br />VICINITY MAP
<br />NO SCALE
<br />NORT4.4
<br />•
<br />c5
<br />H
<br />0
<br />c o
<br />Coo
<br />2
<br />OM
<br />O
<br />m0
<br />3
<br />to
<br />0
<br />0
<br />0
<br />to3
<br />LL
<br />0 Es
<br />PASSCO COLORADO
<br />COLORADO TECHNOLOGICAL CENTER
<br />LOTS 6 & 7, FILING 2
<br />LOUISVILLE, COLORADO
<br />BOULEVARD
<br />PROJ NO:
<br />DATE
<br />REV:
<br />07-17
<br />SEPT. 13, 2007
<br />OCT. 26, 2007
<br />NOV. 26, 2007
<br />SEPT.17, 2008
<br />SEPT. 24, 2008
<br />Ossualbg Pa. MONO
<br />Mdattrip aetMmarbial
<br />i�Ner
<br />susellM t
<br />COVER SHEET
<br />
|