Passco Colorado Tech
<br />DRAWING NUMBER
<br />Industrial LLC
<br />cc
<br />cow
<br />Z
<br />I
<br />0
<br />JJ77
<br />z
<br />2Ir,
<br />2c
<br />' C
<br />z�
<br />• n
<br />pm I
<br />a
<br />z
<br />21.0
<br />zN
<br />a�
<br />Po- 3
<br />LZ'
<br />•
<br />Uw
<br />0 & A
<br />00cc
<br />00 ..
<br />a.
<br />0
<br />a
<br />0
<br />W
<br />z
<br />zN
<br />w(
<br />SwIom
<br />W
<br />z� a
<br />•a
<br />m
<br />CO U�
<br />ooh
<br />a¢
<br />0
<br />a
<br />LL
<br />COI
<br />Itis �ee� �,fe,�U'Pk -m
<br />t-e461e,140( `r/AP
<br />Pcb ti9presv.cP,
<br />CITY COUNCIL CERTIFICATE
<br />\ A D -4*)
<br />I I I
<br />ODV
<br />COOADO C -\O0© CA_ C=\- \0. 2
<br />O 2 _OU SV ___, CO_MADO
<br />DASSCO COOADO --C- \�.,S-� A_, __C
<br />APPROVED THIS 2 DAY OF TULy , 20 13, BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. #3.27 SERIES (Z0L3
<br />iikr!),4)(Afutitt
<br />PLANNING COMMISSION CERTIFICATE
<br />RECOMMENDED APPROVAL THIS 1, DAY OF 7-4-11 - , 20 ,
<br />BY THE PLANNING COM ISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. SERIES 1M3
<br />CLERK AND RECORDER CERTIFICATE
<br />(COUNTY OF BOULDER
<br />STATE OF COLORADO)
<br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT
<br />1:24 O'CLOCK, 4 . M., THIS 19 DAY OF Sept-eMer-
<br />20 13, AND IS RECORDED IN PLAN FILE , FEE
<br />PAID FILM NO. <033'1 %° -t'' , RECEPTION 4")343o24°
<br />RECORDER DEPUTY
<br />OWNERSHIP SIGNATURE BLOCK
<br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL
<br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D.
<br />WITNESS OUR HANDS AND SEALS THIS 251 DAY OF --JVLr , 20\3.
<br />PASS
<br />NOTARY
<br />ECH iNPUSTRIAL, LLC. (OWNER)
<br />ge/Efely
<br />1 id
<br />�Y COM�SSI.O�N� PIRES
<br />1�/!E; fix.
<br />LEGAL DESGRI PTI ON: PART OF THE SOUTHEAST QUARTER OF SEGTI ON 16,
<br />TOWNSHIP I SOUTH, RANGE 61 WEST, 6TH PRI NGIPAL MERIDIAN, GIN OF
<br />LOU I SV I LLE, COUNTY OF BOULDER, STATE OF COLORADO, DESGRI BED AS
<br />FOLLOWS: LOT 12, COLORADO TECHNOLOG I CAL CENTER, FILING. NUMBER
<br />TWO.
<br />ZONING AND PARKING INFORMATION
<br />ZON I NG: COMMERCIAL PUD
<br />SETBACKS (PR I NC I PAL BU I Li) I NC 5) :
<br />FRONT (104TH STREET): 35'
<br />REAR (INTERNAL) : 25'
<br />51 DE (INTERNAL) : 25'
<br />SIDE (DILLON RD): 50'
<br />ALLOWABLE MAXI MUM BUILDING HEIGHT: 35'
<br />(PER GIN OF LOU I SV I LLE CDDSC)
<br />PROPOSED BUILDING HEIGHT: 28' f
<br />BUILDING SIZE:
<br />BUILDING ONE:
<br />BUILDING TWO :
<br />TOTAL :
<br />PARKING:
<br />PHASE ONE:
<br />PHASE TWO:
<br />DEFERRED SPACES (MAXIMUM):
<br />TOTAL POTENTIAL PARKING:
<br />SETBACKS (PARK I NG) :
<br />FRONT (104TH STREET): 15'
<br />REAR (INTERNAL): 10'
<br />SIDE (INTERNAL) : 10'
<br />SIDE (DILLON RD): 25'
<br />40,0160 S.F.
<br />40,0160 S.F.
<br />8I,120 5.F.
<br />107
<br />123
<br />102
<br />332 SPACES
<br />PHASE ONE PARKING 15 2.6 SPACES PER 1,000 S.F.
<br />PHASE ONE AND TWO PARKING 15 3.0 SPACES PER 1,000 S.F.
<br />MAXI MUM PARKING 15 APROX. 4.1 SPACES PER 1,000 5.F.
<br />GENERAL NOTES:
<br />I . THE PROJECT 15 TO BE CONSTRUCTED I N TWO PHASES A5 SHOWN BY THE
<br />PHASE LINE ON THE PLANS. PHASE ONE IMPROVEMENTS TO INCLUDE ALL
<br />DRAINAGE AND UTILITY RELATED IMPROVEMENTS SHOWN ON THE GRADING
<br />AND UTILITY PLANS EXCEPT FOR THE PAVING AND RELATED CURB AND
<br />GUTTER WORK SHOWN WEST OF THE PHASING LINE AND THE SEWER AND
<br />WATER LINE CONNECTIONS INTO BUILDING 2. THE PHASING OF THE
<br />LANDSCAPE AND IRRIGATION IMPROVEMENTS WILL BE A5 DELINEATED BY
<br />THE PHASING LINE SHOWN ON THE PLANS. IF REQU I RED FOR IRRIGATION
<br />PURPOSES, SOME OF THE PERI METER LANDSCAPING SHOWN I N PHASE 2
<br />MAY BE INCLUDED IN PHASE I .
<br />2. REFER TO CIVIL ENG I NEER I NG DRAWINGS PREPARED BY HURST 4
<br />ASSOC I ATES FOR UTILITY, GRADING, AND DRA I NAGE INFORMATION.
<br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS:
<br />OCTOBER, 2012
<br />4. CONSTRUCTION MATERIALS AS FOLLOWS:
<br />HALLS: PRE -CAST CONCRETE PANELS
<br />TYPE A: TO BE DETERMINED
<br />TYPE 5: TO BE DETERMINED
<br />TYPE C: TO BE DETERMINED
<br />ROOF: MEMBRANE (CONGEALED BY PARAPET)
<br />CANOPIES: STEEL - COLOR TO BE DETERMINED DURING P.U.D. PROCESS.
<br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH
<br />5 . THE PROJECT 15 TO BE DESIGNED I N ACCORDANCE WITH CRI TER I A SET
<br />FORTH I N THE BUS I NESS CENTER AT COLORADO TECHNOLOG I GAL CENTER
<br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 10118, AND
<br />AND THE C. I TY OF LOUISVILLE COMMERCIAL DEVELOPMENT DESIGN STANDARDS
<br />AND GUI DELI NES.
<br />6. ALL EX I STING PURL IC AND PRIVATE 51 DEWALK, CURB, GUTTER AND ASPHALT
<br />ADJACENT TO THE PERIMETER OF THE SITE THAT 15 CRACKED, SETTLED, OR
<br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR,
<br />A5 DETERMINED NECESSARY BY THE C I TY, AS PART OF THE PROJECT, AND
<br />AT THE DEVELOPER'S EXPENSE.
<br />T. ROOF TOP EQUIPMENT IS ANTI GIFATED AND HILL BE SCREENED.
<br />LOCATIONS, QUANTITIES AND 51ZES NOT YET KNOWN.
<br />8. THE RETAINING WALL MATERIAL HILL MATCH OR COMPLEMENT BUILDING
<br />MATER ALS, SUBJECT TO STAFF REVIEH AND APPROVAL THROUGH THE
<br />BUILDING FERMIT PROCESS.
<br />01 . A PARKING DEFERRAL 15 BEING REQUESTED. INITIAL PARKING 15 BEING
<br />PROV I DED TO ALLOW FOR APPROXI MATELY 60% OFFICE USE AND 40%
<br />WAREHOUSE USE. I F FUTURE TENANTS COME I N WHICH REQUIRE A MORE
<br />INTENSIVE PARKING USE, THE DEFFERED PARKING HILL BE USED AT THAT
<br />TIME. SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING.
<br />LAND USE BREAKDOWN
<br />CATEGORY
<br />BUILDING COVERAGE:
<br />PARKING AND DRIVES:
<br />PEDESTRIAN HARDSCAPE:
<br />OPEN SPACE (LANDSCAPED) :
<br />TOTAL: LOT 51ZE
<br />PHASE ONE
<br />AREA
<br />40,200 S.F.
<br />T5,g45 S.F.
<br />6,077 S.F.
<br />88,587 S.F.
<br />328,122 S.F.
<br />7.53 ACRES
<br />PHASE TWO
<br />AREA
<br />40,200 S.F.
<br />52,206 S.F.
<br />5,565 S.F.
<br />21,332 S.F.
<br />528,122 5.F.
<br />7.53 ACRES
<br />TOTAL
<br />AREA
<br />80,400 S.F.
<br />126,151 S.F.
<br />11,642 S.F.
<br />1001,0121 S.F.
<br />328,122 S.F.
<br />7.53 ACRES
<br />PERCENT
<br />24.5%
<br />38.5%
<br />3.5%
<br />33.5%
<br />100%
<br />NOTE: THE I1a,303 S.F. OF PHASE TWO BUILDING, PARKING AND DRIVES, PEDESTRIAN HARDSCAPE AND
<br />LANDSCAPED OPEN SPACE WILL REMAIN IN ITS NATURAL CONDITION UNTIL CONSTRUCTION OF PHASE TWO
<br />PROJECT DATA
<br />OWNER/CL I ENT:
<br />PASSCO COLORADO TECH INDUSTRIAL, LLC
<br />16 CORPORATE PARK, SUITE 200
<br />IRVINE, GA 012606
<br />141-442-1000
<br />ARCHITECT:
<br />RVP ARCHITECTURE AND CONSULTING, P.G.
<br />4141 ARAPAHOE AVENUE, SUITE 100
<br />BOULDER, COLORADO 80303
<br />303-443-5355
<br />CIVIL ENGINEER:
<br />HURST 4 ASSOC I ATES, INC.
<br />4010101 PEARL EAST G I RCLE, 5U I TE 106
<br />BOULDER, COLORADO 80301
<br />303-4401-01105
<br />LANDSCAPE ARCHITECT:
<br />NATURE'S DESIGN
<br />15674 I ND I ANA GULCH ROAD
<br />JAMESTOWN, COLORADO 80455
<br />303-451-3333
<br />LIGHTING DESIGN:
<br />RUUD LIGHTING
<br />01201 WASHINGTON AVE
<br />RAC I NE, WISCONSIN 53406
<br />800-236-7000
<br />South Boulder
<br />4\6
<br />Cherry St.
<br />Avast
<br />Hospital
<br />Campus
<br />•
<br />SHEET INDEX
<br />COVER SHEET
<br />1 DEVELOPMENT PLAN / DETAILS
<br />2 ELEVATIONS
<br />3 ENLARGED ELEVATIONS
<br />L1 LANDSCAPE PLAN
<br />L2 PLANT LISTS AND NOTES
<br />C1 GRADING PLAN
<br />C2 SITE UTILITY PLAN
<br />PH1 PHOTOMETRIC PLAN
<br />PH2 LIGHTING SPECIFICATIONS
<br />LOUISVIIIe 2
<br />Lafayette
<br />CO. ST. HWY. 42
<br />Monarch H5
<br />Health Park Dr.
<br />Superior
<br />Storage
<br />Technology
<br />VICINITY MAP
<br />NO SG?.Lt=
<br />Frnr2lre
<br />42_0(14-
<br />0000'4414,1/4
<br />NOI
<br />(14-
<br />NO1RTH
<br />ITE
<br />co
<br />Colorado Tech
<br />0
<br />cf,U
<br />U)
<br />0
<br />Q 0
<br />0 Ed0
<br />a0
<br /><
<br />g
<br />m
<br />Colorado Technological Center
<br />Lot 12, Filing 2
<br />N
<br />0
<br />O
<br />V
<br />X
<br />I1
<br />ID
<br />a
<br />0`
<br />M�
<br />4
<br />0
<br />0
<br />a
<br />Colorado
<br />0
<br />739 South 104th Street
<br />PROJ NO: 08-18
<br />DATE: OCTOBER 16, 2008
<br />REV: MAY 7, 2009
<br />AUG 10, 2009
<br />AUG 31, 2009
<br />SEPT. 25, 2009
<br />SEPT. 29, 2009
<br />MAY 2 2013
<br />Copyright 02009 - All rights
<br />reserved RVP Architecture and
<br />Consulting, P.C. All design
<br />drawings and written material
<br />herein may not be used or
<br />duplicated without the written
<br />consent of RVP Architecture and
<br />Consulting, P.C.
<br />COVER SHEET
<br />
|