1—
<br />O
<br />O J
<br />—J
<br />DRAWING NUMBER
<br />DRAWING NUMBER
<br />o
<br />O
<br />4- w
<br />z_
<br />w
<br />a
<br />0
<br />1
<br />uJ
<br />w
<br />z
<br />N
<br />0
<br />0
<br />(0
<br />0
<br />m
<br />2
<br />z
<br />cc
<br />a
<br />CJ
<br />CDo
<br />a
<br />0
<br />w
<br />(an
<br />0
<br />0)
<br />w
<br />z
<br />N
<br />ui (O
<br />n 0
<br />1 m
<br />w Z
<br />z
<br />•
<br />1-0
<br />0 w
<br />¢
<br />0
<br />10
<br />a
<br />0
<br />0
<br />a
<br />0
<br />w
<br />z
<br />z
<br />w
<br />a
<br />0
<br />1
<br />w
<br />z
<br />.
<br />SAFCO PRODUCTS
<br />REORDER BY PART NUMBER 6552
<br />ROSITION EDGE- OF PRINT ON THIS LINE
<br />i
<br />DRAWING NUMBER
<br />F-
<br />0 0
<br />0)
<br />w
<br />z
<br />w
<br />a
<br />1
<br />0)
<br />z
<br />.
<br />SAFCO PRODUCTS
<br />N
<br />Po
<br />0
<br />co
<br />2
<br />z
<br />ID
<br />w
<br />0
<br />0
<br />' POSITION EDGE -OF PRINT ON THIS LINE -
<br />i
<br />POSITION EOGE OF PRINT ON THIS LINE
<br />PUSI I IUN tUNt W. MINI UN 11115 LINt
<br />- \A D
<br />I N•liwoor I D I
<br />11111111111111111111111111
<br />CO.MADO-C-\0.OGCA
<br />SU
<br />DASSCO COOADO -_
<br />CITY COUNCIL CERTIFICATE
<br />APPROVED THIS e. DAY OF o4 Ehb6R , 20001 , BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. 3 9 SERIES A 00 el
<br />inrcL)Ewc
<br />PLANNING COMMISSION CERTIFICATE
<br />RECOMMENDED APPROVAL THIS g DAY OF Oc'ro B€ I , 200.3_ ,
<br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. SERIES a O O q
<br />CLERK AND RECORDER CERTIFICATE
<br />(COUNTY OF BOULDER
<br />STATE OF COLORADO)
<br />1 HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT
<br />/`9 '/3 r'ri (Ink, 0 M THIO 1 9.24 r%AYnc
<br />20 4Q , AND IS RECORDED IN PLAN FILE , FEE 10 /. ao
<br />PAID � FILM NO. / , RECEPTION 03e 52912 .
<br />}//r14Ky HALL
<br />RECORDER
<br />dpie,4,; z&d,..,,)
<br />OWNERSHIP SIGNATURE BLOCK
<br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL
<br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D.
<br />WITNESS OUR HANDS AND SEALS THIS se DAY OF OEc . k, 206. .
<br />PASSCO COLO DO TTCH INDUSTRIAL, LLC. (OWNER)
<br />NOLARY
<br />MY COMMISSION EXPIRES tSP 1rIO
<br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF SECTION 16,
<br />TOWNSHIP 1 SOUTH, RANGE 601 WEST, 6TH PRI NC I PAL MERIDIAN, CITY OF
<br />LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRIBED AS
<br />FOLLOWS: LOT 12, COLORADO TECHNOLOGICAL CENTER, FILING. NUMBER
<br />TWD.
<br />1111111111110
<br />ZONING AND PARKING INFORMATION
<br />ZONING: COMMERCIAL PUD
<br />SETBACKS (PRINCIPAL BUILDINGS):
<br />FRONT (104TH 5 -MEET): 35'
<br />REAR (INTERNAL) : 25'
<br />SIDE (INTERNAL): 25'
<br />SIDE (DILLON RD): 50'
<br />SETBACKS (PARKING) :
<br />FRONT (104TH STREET): 15'
<br />REAR (INTERNAL) : 10'
<br />SIDE (INTERNAL) : 10'
<br />SIDE (D I LLON RD) : 25'
<br />ALLOWABLE MAXIMUM BUILDING HEIGHT: 35'
<br />(PER CITY OF LOUISVILLE CDDS ,)
<br />PROPOSED BUILDING HEIGHT: 28' ±
<br />BUILDING SIZE:
<br />BUILDING IA:
<br />BUILDING 15:
<br />BUILDING 2:
<br />TOTAL:
<br />PARKING:
<br />PHASE ONE:
<br />PHASE TWO:
<br />DEFERRED SA --,('‘v1 A X I ivtliM) •
<br />TOTAL POTENTIAL PAR<ING:
<br />PHASE ONE PARKING 15 2.8 SP!- :,%ES PER 1,000 S.F.
<br />PHASE ONE AND TWO PARKING 15 3.0 SPACES PER 1,000 5.F.
<br />MAXIMUM PARKING 15 APROX. 4.3 SPACES PER 1,000 S.F.
<br />18,825 5.F.
<br />18,825 5.F.
<br />40200 S.F.
<br />11,550 S.F.
<br />101
<br />123
<br />102
<br />332 SPACES
<br />GENERAL NOTES:
<br />I. THE PROJECT 15 TO BE CONSTRUCTED IN TWO PHASES AS SHOWN BY THE
<br />PHASE LINE ON THE PLANS. PHASE ONE IMPROVEMENTS TO INCLUDE ALL
<br />DRAINAGE AND UTILITY RELATED IMPROVEMENTS SHOWN ON THE GRADING
<br />AND UTILITY PLANS EXCEPT FOR THE PAVING AND RELATED CURB AND
<br />GUTTER WORK SHOWN WEST OF THE PHASING LINE AND THE SEWER AND
<br />WATER LINE CONNECTIONS INTO BUILDING 2. THE PHASING OF THE
<br />LANDSCAPE AND IRRIGATION IMPROVEMENTS WILL BE AS DELINEATED BY
<br />THE PHASING LINE SHOWN ON THE PLANS. IF REQUIRED FOR I RR I GAT I ON
<br />PURPOSES, SOME OF THE PERIMETER LANDSCAPING SHOWN IN PHASE 2
<br />MAY BE INCLUDED IN PHASE I.
<br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST $
<br />ASSOC I ATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION.
<br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS:
<br />OCTOBER, 2012
<br />4. CONSTRUCTION MATERIALS AS FOLLOWS:
<br />WALLS: PRE -CAST CONCRETE PANELS
<br />TYPE A: SHERWIN WILLIAMS "ROYCROFT VELLUM" (542833) OR EQUAL.
<br />TYPE 5: SHERWIN WILLIAMS "BAGUETTE" (546123) OR EQUAL.
<br />TYPE C: SHERWIN WILLIAMS "THATCH BROWN" (51A16145) OR EQUAL.
<br />ROOF: MEMBRANE (CONCEALED BY PARAPET)
<br />CANOPIES: STEEL - PAINTED SHERWIN W I LL I AMS "ECLIPSE" (546166) OR EQ.
<br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH
<br />5. THE PROJECT 15 TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET
<br />FORTH IN THE BUSINESS CENTER AT COLORADO TECHNOLOGICAL CENTER
<br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 141018, AND
<br />AND THE CITY OF LOUISVILLE COMMERCIAL DEVELOPMENT DESIGN STANDARDS
<br />AND GUIDELINES.
<br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, GUTTER AND ASPHALT
<br />ADJACENT TO THE PERIMETER OF THE SITE THAT 15 CRACKED, SETTLED, OR
<br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR,
<br />A5 DETERMINED NECESSARY BY THE C I TY, A5 PART OF THE PROJECT, AND
<br />AT THE DEVELOPER'S EXPENSE.
<br />1. ROOF TOP EQUIPMENT 15 ANTICIPATED AND WILL BE SCREENED.
<br />LOCATIONS, QUANTITIES AND SIZES NOT YET KNOWN.
<br />8. THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING
<br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE
<br />BUILDING PERMIT PROCESS.
<br />(4. A PARKING DEFERRAL 15 BEING REQUESTED. INITIAL PARKING 15 BEING
<br />PROVIDED TO ALLOW FOR APPROXIMATELY 60% OFFICE USE AND 40%
<br />WAREHOUSE USE. IF FUTURE TENANTS COME IN WH I CH REQUIRE A MORE
<br />INTENSIVE PARKING USE, THE DEFFERED PARKING WILL BE USED AT THAT
<br />TIME. SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING.
<br />V
<br />1111111111111/11110
<br />_ ..\C, \O. 2
<br />CO_MADO
<br />C- C
<br />LAND USE BREAKDOWN
<br />CATEGORY
<br />BUILDING COVERAGE:
<br />PARKING AND DRIVES:
<br />PEDESTRIAN HARDSCAPE:
<br />OPEN SPACE (LANDSCAPED):
<br />TOTAL: LOT SIZE
<br />PHASE ONE
<br />AREA
<br />31,650 S.F.
<br />13,(445 5.F.
<br />6,815 5.F.
<br />(40,4001 5.F.
<br />PHASE TWO
<br />AREA
<br />40,200 5.F.
<br />52,206 5.F.
<br />5,565 5.F.
<br />21,332 5.F.
<br />TOTAL
<br />AREA
<br />11,850 5.F.
<br />126,151 S.F.
<br />12,380 5.F.
<br />111,141 5.F.
<br />328,122 5.F. 328,122 5.F. 328,122 5.F.
<br />1.53 ACRES 1.53 ACRES 1.53 ACRES
<br />PERCENT
<br />23.1%
<br />38.5%
<br />3.'130
<br />34.1%
<br />100%
<br />NOTE: THE 11'1,303 S.F. OF PHASE TWO BUILDING, PARKING AND DRIVES, PEDESTRIAN HARDSGAPE AND
<br />LANDSCAPED OPEN SPACE WILL REMAIN IN ITS NATURAL CONDITION UNTIL CONSTRUCTION OF PHASE TWO
<br />PROJECT DATA
<br />OWNER/CLIENT:
<br />PA55C0 COLORADO TECH INDUSTRIAL, LLC
<br />(44 CORPORATE PARK, SUITE 200
<br />IRVINE, CA (42606
<br />014(4-442-1000
<br />ARCHITECT:
<br />RVP ARCHITECTURE AND CONSULTING, P.G.
<br />4141 ARAPAHOE AVENUE, SUITE 100
<br />BOULDER, COLORADO 80303
<br />303-443-5355
<br />CIVIL ENGINEER:
<br />HURST 4 ASSOCIATES, INC.
<br />4(4(401 PEARL EAST CIRCLE, SUITE 106
<br />BOULDER, COLORADO 80301
<br />303-4401-01105
<br />LANDSCAPE ARCHITECT:
<br />NATURE'S DESIGN
<br />15614 INDIANA GULCH ROAD
<br />JAMESTOWN, COLORADO 80455
<br />303-4541-3333 st
<br />LIGHTING DESIGN:
<br />RUUD LIGHTING
<br />01201 INA,SHINGTON AVE
<br />RAC I NE, WISCONSIN 53406
<br />800-236-1000
<br />South Boulder
<br />SHEET INDEX
<br />COVER SHEET
<br />1 DEVELOPMENT PLAN / DETAILS
<br />2 ELEVATIONS
<br />3 ENLARGED ELEVATIONS
<br />L1 LANDSCAPE PLAN
<br />L2 PLANT LISTS AND NOTES
<br />C1 GRADING PLAN
<br />C2 SITE UTILITY PLAN
<br />PH1 PHOTOMETRIC PLAN
<br />PH2 LIGHTING SPECIFICATIONS
<br />N
<br />Louisvi I ie 1
<br />Lafayette
<br />Cherr5t.
<br />Avast
<br />Hospital
<br />Campus
<br />dh
<br />Monarch HS
<br />Health Park Dr.
<br />tee,
<br />Superior
<br />Storage
<br />Technology
<br />VICINITY MAP
<br />NO SCALE
<br />NORTH
<br />00
<br />N
<br />co
<br />O
<br />a
<br />Colorado Technological Center
<br />0
<br />0
<br />0
<br />0
<br />O
<br />U
<br />0
<br />J
<br />739 South 104th Street
<br />PROJ NO: 08-18
<br />DATE OCTOBER 16, 2008
<br />REV: MAY 7, 2009
<br />AUG 10, 2009
<br />AUG 31, 2009
<br />SEPT. 25, 2009
<br />SEPT. 29, 2009
<br />Iq PMoMIoMnalA
<br />Causiaili Pa. MONO
<br />—roneasior
<br />allhodiewilles
<br />Huuiu t IWPIsdilisla mad
<br />COVER SHEET
<br />
|