Laserfiche WebLink
1— <br />O <br />O J <br />—J <br />DRAWING NUMBER <br />DRAWING NUMBER <br />o <br />O <br />4- w <br />z_ <br />w <br />a <br />0 <br />1 <br />uJ <br />w <br />z <br />N <br />0 <br />0 <br />(0 <br />0 <br />m <br />2 <br />z <br />cc <br />a <br />CJ <br />CDo <br />a <br />0 <br />w <br />(an <br />0 <br />0) <br />w <br />z <br />N <br />ui (O <br />n 0 <br />1 m <br />w Z <br />z <br />• <br />1-0 <br />0 w <br />¢ <br />0 <br />10 <br />a <br />0 <br />0 <br />a <br />0 <br />w <br />z <br />z <br />w <br />a <br />0 <br />1 <br />w <br />z <br />. <br />SAFCO PRODUCTS <br />REORDER BY PART NUMBER 6552 <br />ROSITION EDGE- OF PRINT ON THIS LINE <br />i <br />DRAWING NUMBER <br />F- <br />0 0 <br />0) <br />w <br />z <br />w <br />a <br />1 <br />0) <br />z <br />. <br />SAFCO PRODUCTS <br />N <br />Po <br />0 <br />co <br />2 <br />z <br />ID <br />w <br />0 <br />0 <br />' POSITION EDGE -OF PRINT ON THIS LINE - <br />i <br />POSITION EOGE OF PRINT ON THIS LINE <br />PUSI I IUN tUNt W. MINI UN 11115 LINt <br />- \A D <br />I N•liwoor I D I <br />11111111111111111111111111 <br />CO.MADO-C-\0.OGCA <br />SU <br />DASSCO COOADO -_ <br />CITY COUNCIL CERTIFICATE <br />APPROVED THIS e. DAY OF o4 Ehb6R , 20001 , BY THE <br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. 3 9 SERIES A 00 el <br />inrcL)Ewc <br />PLANNING COMMISSION CERTIFICATE <br />RECOMMENDED APPROVAL THIS g DAY OF Oc'ro B€ I , 200.3_ , <br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. SERIES a O O q <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />1 HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />/`9 '/3 r'ri (Ink, 0 M THIO 1 9.24 r%AYnc <br />20 4Q , AND IS RECORDED IN PLAN FILE , FEE 10 /. ao <br />PAID � FILM NO. / , RECEPTION 03e 52912 . <br />}//r14Ky HALL <br />RECORDER <br />dpie,4,; z&d,..,,) <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS se DAY OF OEc . k, 206. . <br />PASSCO COLO DO TTCH INDUSTRIAL, LLC. (OWNER) <br />NOLARY <br />MY COMMISSION EXPIRES tSP 1rIO <br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF SECTION 16, <br />TOWNSHIP 1 SOUTH, RANGE 601 WEST, 6TH PRI NC I PAL MERIDIAN, CITY OF <br />LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO, DESCRIBED AS <br />FOLLOWS: LOT 12, COLORADO TECHNOLOGICAL CENTER, FILING. NUMBER <br />TWD. <br />1111111111110 <br />ZONING AND PARKING INFORMATION <br />ZONING: COMMERCIAL PUD <br />SETBACKS (PRINCIPAL BUILDINGS): <br />FRONT (104TH 5 -MEET): 35' <br />REAR (INTERNAL) : 25' <br />SIDE (INTERNAL): 25' <br />SIDE (DILLON RD): 50' <br />SETBACKS (PARKING) : <br />FRONT (104TH STREET): 15' <br />REAR (INTERNAL) : 10' <br />SIDE (INTERNAL) : 10' <br />SIDE (D I LLON RD) : 25' <br />ALLOWABLE MAXIMUM BUILDING HEIGHT: 35' <br />(PER CITY OF LOUISVILLE CDDS ,) <br />PROPOSED BUILDING HEIGHT: 28' ± <br />BUILDING SIZE: <br />BUILDING IA: <br />BUILDING 15: <br />BUILDING 2: <br />TOTAL: <br />PARKING: <br />PHASE ONE: <br />PHASE TWO: <br />DEFERRED SA --,('‘v1 A X I ivtliM) • <br />TOTAL POTENTIAL PAR<ING: <br />PHASE ONE PARKING 15 2.8 SP!- :,%ES PER 1,000 S.F. <br />PHASE ONE AND TWO PARKING 15 3.0 SPACES PER 1,000 5.F. <br />MAXIMUM PARKING 15 APROX. 4.3 SPACES PER 1,000 S.F. <br />18,825 5.F. <br />18,825 5.F. <br />40200 S.F. <br />11,550 S.F. <br />101 <br />123 <br />102 <br />332 SPACES <br />GENERAL NOTES: <br />I. THE PROJECT 15 TO BE CONSTRUCTED IN TWO PHASES AS SHOWN BY THE <br />PHASE LINE ON THE PLANS. PHASE ONE IMPROVEMENTS TO INCLUDE ALL <br />DRAINAGE AND UTILITY RELATED IMPROVEMENTS SHOWN ON THE GRADING <br />AND UTILITY PLANS EXCEPT FOR THE PAVING AND RELATED CURB AND <br />GUTTER WORK SHOWN WEST OF THE PHASING LINE AND THE SEWER AND <br />WATER LINE CONNECTIONS INTO BUILDING 2. THE PHASING OF THE <br />LANDSCAPE AND IRRIGATION IMPROVEMENTS WILL BE AS DELINEATED BY <br />THE PHASING LINE SHOWN ON THE PLANS. IF REQUIRED FOR I RR I GAT I ON <br />PURPOSES, SOME OF THE PERIMETER LANDSCAPING SHOWN IN PHASE 2 <br />MAY BE INCLUDED IN PHASE I. <br />2. REFER TO CIVIL ENGINEERING DRAWINGS PREPARED BY HURST $ <br />ASSOC I ATES FOR UTILITY, GRADING, AND DRAINAGE INFORMATION. <br />3. THE ESTIMATED DATE OF COMPLETION OF PHASE ONE IMPROVEMENTS: <br />OCTOBER, 2012 <br />4. CONSTRUCTION MATERIALS AS FOLLOWS: <br />WALLS: PRE -CAST CONCRETE PANELS <br />TYPE A: SHERWIN WILLIAMS "ROYCROFT VELLUM" (542833) OR EQUAL. <br />TYPE 5: SHERWIN WILLIAMS "BAGUETTE" (546123) OR EQUAL. <br />TYPE C: SHERWIN WILLIAMS "THATCH BROWN" (51A16145) OR EQUAL. <br />ROOF: MEMBRANE (CONCEALED BY PARAPET) <br />CANOPIES: STEEL - PAINTED SHERWIN W I LL I AMS "ECLIPSE" (546166) OR EQ. <br />WINDOWS: ALUMINUM STOREFRONT - NATURAL FINISH <br />5. THE PROJECT 15 TO BE DESIGNED IN ACCORDANCE WITH CRITERIA SET <br />FORTH IN THE BUSINESS CENTER AT COLORADO TECHNOLOGICAL CENTER <br />GENERAL DEVELOPMENT PLAN, AMENDMENT A, DATED JUNE 8, 141018, AND <br />AND THE CITY OF LOUISVILLE COMMERCIAL DEVELOPMENT DESIGN STANDARDS <br />AND GUIDELINES. <br />6. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, GUTTER AND ASPHALT <br />ADJACENT TO THE PERIMETER OF THE SITE THAT 15 CRACKED, SETTLED, OR <br />OTHERWISE DAMAGED SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR, <br />A5 DETERMINED NECESSARY BY THE C I TY, A5 PART OF THE PROJECT, AND <br />AT THE DEVELOPER'S EXPENSE. <br />1. ROOF TOP EQUIPMENT 15 ANTICIPATED AND WILL BE SCREENED. <br />LOCATIONS, QUANTITIES AND SIZES NOT YET KNOWN. <br />8. THE RETAINING WALL MATERIAL WILL MATCH OR COMPLEMENT BUILDING <br />MATERIALS, SUBJECT TO STAFF REVIEW AND APPROVAL THROUGH THE <br />BUILDING PERMIT PROCESS. <br />(4. A PARKING DEFERRAL 15 BEING REQUESTED. INITIAL PARKING 15 BEING <br />PROVIDED TO ALLOW FOR APPROXIMATELY 60% OFFICE USE AND 40% <br />WAREHOUSE USE. IF FUTURE TENANTS COME IN WH I CH REQUIRE A MORE <br />INTENSIVE PARKING USE, THE DEFFERED PARKING WILL BE USED AT THAT <br />TIME. SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING. <br />V <br />1111111111111/11110 <br />_ ..\C, \O. 2 <br />CO_MADO <br />C- C <br />LAND USE BREAKDOWN <br />CATEGORY <br />BUILDING COVERAGE: <br />PARKING AND DRIVES: <br />PEDESTRIAN HARDSCAPE: <br />OPEN SPACE (LANDSCAPED): <br />TOTAL: LOT SIZE <br />PHASE ONE <br />AREA <br />31,650 S.F. <br />13,(445 5.F. <br />6,815 5.F. <br />(40,4001 5.F. <br />PHASE TWO <br />AREA <br />40,200 5.F. <br />52,206 5.F. <br />5,565 5.F. <br />21,332 5.F. <br />TOTAL <br />AREA <br />11,850 5.F. <br />126,151 S.F. <br />12,380 5.F. <br />111,141 5.F. <br />328,122 5.F. 328,122 5.F. 328,122 5.F. <br />1.53 ACRES 1.53 ACRES 1.53 ACRES <br />PERCENT <br />23.1% <br />38.5% <br />3.'130 <br />34.1% <br />100% <br />NOTE: THE 11'1,303 S.F. OF PHASE TWO BUILDING, PARKING AND DRIVES, PEDESTRIAN HARDSGAPE AND <br />LANDSCAPED OPEN SPACE WILL REMAIN IN ITS NATURAL CONDITION UNTIL CONSTRUCTION OF PHASE TWO <br />PROJECT DATA <br />OWNER/CLIENT: <br />PA55C0 COLORADO TECH INDUSTRIAL, LLC <br />(44 CORPORATE PARK, SUITE 200 <br />IRVINE, CA (42606 <br />014(4-442-1000 <br />ARCHITECT: <br />RVP ARCHITECTURE AND CONSULTING, P.G. <br />4141 ARAPAHOE AVENUE, SUITE 100 <br />BOULDER, COLORADO 80303 <br />303-443-5355 <br />CIVIL ENGINEER: <br />HURST 4 ASSOCIATES, INC. <br />4(4(401 PEARL EAST CIRCLE, SUITE 106 <br />BOULDER, COLORADO 80301 <br />303-4401-01105 <br />LANDSCAPE ARCHITECT: <br />NATURE'S DESIGN <br />15614 INDIANA GULCH ROAD <br />JAMESTOWN, COLORADO 80455 <br />303-4541-3333 st <br />LIGHTING DESIGN: <br />RUUD LIGHTING <br />01201 INA,SHINGTON AVE <br />RAC I NE, WISCONSIN 53406 <br />800-236-1000 <br />South Boulder <br />SHEET INDEX <br />COVER SHEET <br />1 DEVELOPMENT PLAN / DETAILS <br />2 ELEVATIONS <br />3 ENLARGED ELEVATIONS <br />L1 LANDSCAPE PLAN <br />L2 PLANT LISTS AND NOTES <br />C1 GRADING PLAN <br />C2 SITE UTILITY PLAN <br />PH1 PHOTOMETRIC PLAN <br />PH2 LIGHTING SPECIFICATIONS <br />N <br />Louisvi I ie 1 <br />Lafayette <br />Cherr5t. <br />Avast <br />Hospital <br />Campus <br />dh <br />Monarch HS <br />Health Park Dr. <br />tee, <br />Superior <br />Storage <br />Technology <br />VICINITY MAP <br />NO SCALE <br />NORTH <br />00 <br />N <br />co <br />O <br />a <br />Colorado Technological Center <br />0 <br />0 <br />0 <br />0 <br />O <br />U <br />0 <br />J <br />739 South 104th Street <br />PROJ NO: 08-18 <br />DATE OCTOBER 16, 2008 <br />REV: MAY 7, 2009 <br />AUG 10, 2009 <br />AUG 31, 2009 <br />SEPT. 25, 2009 <br />SEPT. 29, 2009 <br />Iq PMoMIoMnalA <br />Causiaili Pa. MONO <br />—roneasior <br />allhodiewilles <br />Huuiu t IWPIsdilisla mad <br />COVER SHEET <br />