Laserfiche WebLink
RIDGE <br />SHINGLE ROOFING TO <br />MATCH BUILDING <br />STEEL TUBE COLUMNS <br />(TYPICAL) <br />CONCRETE FLOOR <br />SLAB <br />FINISH GRADE <br />ROOFING <br />PAVILION SIDE ELEVATION <br />SCALE: 1/8"= 1'-0" <br />METAL DRIP EDGE <br />CONTINUOUS <br />OPEN <br />GLU-LAM BEAM <br />CONTINUOUS <br />WOOD FASCIA <br />STEEL TUBE COLUMN <br />25-6" <br />PAVILION END ELEVATION <br />SCALE: 1/8"= 1-0 <br />METAL DRIP EDGE <br />CONTINUOUS <br />CONCRETE <br />FLOOR SLAB <br />FINISH GRADE <br />2x6 WOOD <br />FASCIA <br />2'-0" <br />STEEL TUBE COLUMNS <br />(TYPICAL) <br />CONCRETE FLOOR <br />SLAB <br />ROOFLINE <br />CENTERLINE OF STEEL <br />TUBE COLUMNS <br />5'-8" <br />75-0" <br />58'-0" <br />8'-0" 8'-O" 8'-O" 8'-O" 8'-O" 8'-O" <br />f f <br />U <br />U <br />[1 <br />CO N CUT <br />CONTROL <br />JOI V TS <br />V <br />U <br />PAVILION FLOOR PLAN <br />SCALE: 1/8"= 1-0 <br />RESERVED <br />PARKING <br />6 <br />U <br />C-4- ACCESSIBLE PARKING SIGNAGE <br />SCALE: N.T.S. <br />U <br />[1 <br />A <br />COWa <br />CL <br />o(X <br />J W <br />1,1 <br />U <br />U <br />[1 <br />SAW CUT <br />CONTROL <br />J011 TS <br />U <br />10'-8" <br />r <br />o <br />J <br />ELEVATION <br />10O'-0" <br />CDC> DRINKING FOUNTAIN <br />WITH HOSE BIBB <br />ELEVATION <br />100'-1 5/8" <br />n <br />L ELEVATION <br />100'-0" <br />EDGE OF <br />CONC. SLAB <br />c <br />N <br />c <br />ci) <br />ricti <br />5, <br />w <br />4:221 <br />= w <br />x <br />_ U <br />C <br />�z <br />O° <br />w Co <br />L11p <br />0 co <br />0 <br />m= <br />O <br />U <br />SPECIAL REVIEW USE SUBMITTAL <br />CO <br />• <br />cri <br />a <br />A <br />w <br />a <br />CrJ <br />CO <br />Co <br />1- <br />w <br />a <br />311 <br />C-) <br />• <br />CO <br />U r— <br />701 W. SOUTH BOULDER ROAD <br />28 -JAN -13 FINAL MYLARS <br />N <br />DATE: <br />JULY 11,2012 <br />PLAN SERIES: <br />xx <br />PROPERTY NUMBER: <br />515-2135 <br />Sheet Title: <br />DETAILS AND <br />ELEVATIONS <br />Sheet: <br />LOUISVILLE, COLO. 80027 <br />26 -OCT -12 PLANNING COMMENTS <br />8 OF 10 <br />Mark Date (D -M -Y) Description <br />