Laserfiche WebLink
0 <br />U <br />w <br />z <br />N <br />0W <br />= m <br />IEE <br />• a <br />m <br />0 <br />CC0 <br />GENERAL PHASING NOTES: <br />DELO 2 PUD <br />Cr) <br />U- <br />0 <br />0 <br />w <br />z <br />z <br />w <br />a <br />0 <br />w <br />z <br />• <br />SAFCO PRODUCTS <br />REORDER BY PART NUMBER 6552 <br />REORDER BY PART NUMBER 6552 <br />i7 <br />w <br />2 <br />2 <br />z_ <br />a <br />CC <br />0 <br />SAFCO PRODUCTS <br />DRAWING NUMBER <br />REORDER BY PART NUMBER 6552 <br />CALEDONIA PLACE <br />BLOCK 8 <br />GRIFFITH STREET <br />(EX. 60' ROW) <br />delp Final Planned Unit Development Phase 2 <br />M <br />IOW <br />ZW <br />!IZ CALEDONIA PLACE <br />a BLOCK 7 <br />V L:. <br />5 <br />A part of section 8, township 1 south, range 69 west of the 6th p.m. <br />City of Louisville, County of Boulder, State of Colorado <br />LOT 101 <br />TRACT B <br />I <br />TRACT <br />LII+CK 7 <br />PHAS <br />LOT 102 <br />OUISVILLE TRADE <br />CENTER <br />i <br />LOT 2 <br />BLOCK A <br />LOT 3 <br />BLOCK A <br />INDUSTRIAL AREA <br />SUBDIVISION <br />LOT 4 <br />BLOCK A <br />LOT 4 <br />I <br />•Lp <br />t� 7[1 • ., . f <br />(NOT A PORTIbisl 0 <br />1 <br />t3 <br />..., J• •w1'1., ,u. ! .t.•6..'. •.l• <br />REGIONAL IMPROVEMENTS) <br />(60' ROW) <br />LOT 1 <br />NDUST <br />D <br />AREA <br />T NO.1 <br />0"I STOR <br />M SE <br />CALED <br />STR <br />B <br />LOT <br />LOCK <br />OUTLOT 1 <br />LOCK 1 <br />1 <br />LOT 7 <br />BLOCK A <br />COAL CREEK <br />CALEDONIA <br />PLAZA <br />OUTLOT A <br />SHOR <br />STREET <br />I <br />FUTURE SI ' NtALIZED <br />INTERSECTION (BY <br />UISVILLE) <br />1! <br />TEBO <br />SOUTH STREET <br />PEDESTRIAl`P <br />GATEWAY AN <br />PLAZA (BY CIT <br />OF LOUISVIL <br />BLOCK 13 <br />4 <br />MINER'S FIELD <br />BASEBALL FIELDS <br />0 <br />D <br />J <br />3 <br />11 <br />Akez 3J� �iIlJ, <br />. <br />1 <br />'1,111 • yiliaal <br />• <br />r.. <br />4 imfmmonit• <br />NAWAP TY GREENWAY <br />HORIZONTAL PUBLIC IMPROVEMENT NOTES <br />HORIZONTAL PUBLIC IMPROVEMENTS FOR THE PROPERTY WILL BE CONSTRUCTED TO <br />SERVICE THE PROJECT AND MAY BE PHASED. THIS PLAN IS NOT MEANT TO DICTATE THE <br />PHASING ASSOCIATED WITH THIS PROJECT BEYOND WHAT IS STATED IN THESE NOTES. THE <br />HORIZONTAL PUBLIC IMPROVEMENTS ARE IDENTIFIED IN THE SUBSEQUENT TEXT AND SHALL <br />ALLOW FOR THE GENERAL PROJECT NOTES, AS FOLLOWS: <br />1. RETAINING WALLS MAY BE REQUIRED FOR THE DEVELOPMENT OF THE PARCEL TO THE <br />STANDARDS AND REQUIREMENTS OF THE CITY, DEVELOPER AND MARKET NEEDS. <br />WALLS OVER 3' WILL BE MINIMIZED TO THE EXTENT PRACTICAL AND IF FEASIBLE, <br />WALLS OVER 3' SHALL BE TIERED. WALL COLORS AND MATERIALS SHALL MATCH OR <br />BE COMPLEMENTARY THROUGHOUT THE DELO DEVELOPMENT. <br />2. NO OFF-SITE IMPROVEMENTS ARE REQUIRED OTHER THAN WHAT IS DEPICTED WITH <br />THIS PUD. <br />3. AN OFF-SITE DRAINAGE FACILITY TO SERVICE THE CORE PROJECT AREA IS REQUIRED <br />FOR DETENTION AND WATER QUALITY. THE REQUIREMENTS OF THAT FACILITY AND <br />THE ASSOCIATED IMPACTS TO THIS PROJECT SHALL BE CONSISTENT WITH THE <br />FINALIZED SUBDIVISION IMPROVEMENT AGREEMENT. THE POND MUST BE <br />OPERATIONAL PRIOR TO CONSTRUCTION ACCEPTANCE. <br />4. PHASING (AND SUBPHASING)OF THE DEVELOPMENT AREAS MAY OCCUR IN ANY <br />ORDER AND IS NOT LIMITED EXCEPT AS REQUIRED TO PROVIDE LOOPED WATER <br />SERVICE(S), SANITARY SERVICE, TWO POINTS OF EMERGENCY ACCESS AND THAT NO <br />"DEAD END" LONGER THAN 500' WITHOUT A SECONDARY EMERGENCY ACCESS, <br />SHALL OCCUR. <br />5. REGIONAL HORIZONTAL PUBLIC IMPROVEMENTS ARE INFRASTRUCTURE THAT <br />PROVIDES REGIONAL AND REDEVELOPMENT BENEFIT AND SHALL BE FUNDED BY THE <br />CITY OF LOUISVILLE, THE URBAN RENEWAL AUTHORITY PER THE ADOPTED <br />AGREEMENT BY THE CITY OF LOUISVILLE OR BOND FUNDING, AS NEGOTIATED WITH <br />ALL PARTIES. THE IDENTIFIED INFRASTRUCTURE IS ANTICIPATED TO BE CONSTRUCTED <br />PRIOR TO OR CONCURRENT WITH THE SECOND PHASE OF THE PROJECT; HOWEVER, <br />SUB -PHASING MAY OCCUR SO LONG AS EMERGENCY AND UTILITY ACCESS IS <br />MAINTAINED THROUGH EACH PHASE. STREET CROSS SECTIONS AND ANTICIPATED <br />IMPROVEMENTS ARE AGREED TO AND AVAILABLE FOR REVIEW WITHIN THIS <br />DOCUMENT. <br />6. THE REGIONAL DRAINAGE CONVEYANCE, AS DEPICTED BY A NEW 60" RCP AND THE <br />ASSOCIATED APPURTENANCES, SHALL BE FUNDED BY CITY OF LOUISVILLE AND <br />CONSTRUCTED BY DELO. <br />HORIZONTAL PUBLIC IMPROVEMENTS BY STREET: <br />CANNON STREET <br />• EXISTING IMPROVEMENTS <br />1. 8" WATER LINE BETWEEN EAST LAFAYETTE STREET AND GRIFFITH STREET <br />2. DRY UTILITIES <br />3. 60" REGIONAL DRAINAGE FACILITIES <br />4. PHASE 1 AND 1A FLATWORK, PAVING, WALKS, TREE LAWNS AND <br />PUBLIC GREENWAYS, WATER, SANITARY AND STORM SEWER <br />IMPROVEMENTS. <br />• REGIONAL IMPROVEMENTS <br />1. PAVING AND PEDESTRIAN WALKWAYS FROM THE PHASE 1/lA <br />TERMINATION TO SOUTH STREET <br />2. PUBLIC DRAINAGE SYSTEM <br />3. CALEDONIA PUBLIC PLAZA (OUTLOT A) <br />4. 8" SANITARY SEWER <br />5. RELOCATION OF DRY UTILITIES <br />6. PROPOSED 60" RCP STORM SEWER PARALLEL TO EXISTING (SUBJECT <br />TO NOTE 5) <br />7. 8" WATER LINE FROM LAFAYETTE LANE TO SHORT STREET <br />8. PUBLIC STORM SEWER AND INLETS FOR LOCAL DRAINAGE WITHIN <br />RIGHT-OF-WAYS <br />NAWATNY GREENWAY <br />• EXISTING IMPROVEMENTS <br />1. 60" RCP REGIONAL STORM SEWER <br />2. DRY UTILITIES <br />• REGIONAL IMPROVEMENTS <br />1. PROPOSED 60" RCP STORM SEWER PARALLEL TO EXISTING (SUBJECT <br />TO NOTE 5) <br />2. RECONFIGURED 15" PVC SANITARY SEWER TO REPLACE EXISTING 15 " <br />VCP PIPE (PHASE 1) <br />3. RELOCATION OF DRY UTILITIES <br />4. GREENWAY AMENITIES, LANDSCAPING, AND HARDSCAPE <br />SHORT STREET <br />• EXISTING IMPROVEMENTS <br />1. 60" RCP REGIONAL STORM SEWER & INLETS AT HIGHWAY 42 <br />2. 8" WATER LINE <br />3. DRY UTILITIES <br />4. STREET PAVING <br />• REGIONAL IMPROVEMENTS <br />1. RECONFIGURE STREET PAVING AND PEDESTRIAN WALKWAYS TO CREATE CANNON STREET WOONERF <br />2. STORM SEWER IMPROVEMENTS <br />3. SIGNALIZED INTERSECTION AT HIGHWAY 42 (SEPARATE CITY PROJECT) <br />4. RELOCATION OF DRY UTILITIES <br />5. REPLACEMENT OF 8" WATERLINE FROM BNSF EAST ROW TO HIGHWAY 42 <br />6. ABANDON IN PLACE EXISTING 24" RCP ACROSS HIGHWAY 42 AND RECONFIGURE EXISTING BOX BASE <br />MANHOLE <br />7. PROPOSED 60" RCP STORM SEWER PARALLEL TO EXISTING UP TO VICINITY OF WEST ROW LINE OF HIGHWAY <br />42 (SUBJECT TO NOTE 5) <br />8. PROPOSED 60" RCP STORM SEWER PARALLEL TO EXISITING FROM VICINITY OF WEST ROW LINE OF HIGHWAY <br />42 TO DAYLIGHT, ON THE EAST SIDE OF HIGHWAY 42 (TO BE FUNDED BY THE CITY OF LOUISVILLE AND <br />CONSTRUCTED BY DELO) <br />9. REPLACEMENT OF EXISTING 8" WATER LINE FROM VICINITY OF BNSF EAST ROW TO THE CONNECTION AT <br />NORTH FRONT STREET (TO BE FUNDED BY THE CITY OF LOUISVILLE AND CONSTRUCTED BY DELO) <br />TRACTS B AND C <br />• EXISTING IMPROVEMENTS <br />1. 60" RCP REGIONAL STORM SEWER <br />2. DRY UTILITIES <br />3. 15" VCP SANITARY TRUNK MAIN <br />• REGIONAL IMPROVEMENTS <br />1. PROPOSED 60" RCP STORM SEWER PARALLEL TO EXISTING (SUBJECT TO NOTE 5) <br />2. RECONFIGURED 15" PVC SANITARY SEWER TO REPLACE EXISTING 15 " VCP PIPE <br />3. RECONFIGURE DRY UTILITIES <br />SOUTH STREET <br />• EXISTING IMPROVEMENTS <br />1. FULL STREET CROSS SECTION WITH WET AND DRY UTILITIES <br />• REGIONAL IMPROVEMENTS <br />1. REPLACEMENT OF WATER MAIN FROM CANNON STREET TO HIGHWAY 42. <br />2. REPLACEMENT OF SANITARY SEWER FROM CANNON STREET TO WEST ROW AT <br />HIGHWAY 42. <br />3. MILL AND OVERLAY FROM CANNON STREET TO THE WEST PCRs AT HIGHWAY <br />42. REPLACEMENT OF CURB AND GUTTER FOR THE NORTH 1/2 SECTION. IN LIEU <br />OF A MILL AND OVERLAY AND CONTINGENT UPON CITY FUNDING, REMOVAL OF THE <br />EXISTING PAVEMENT AND REPLACEMENT WITH FULL DEPTH ASPHALT SHALL OCCUR . <br />CALEDONIA PLAZA <br />• EXISTING IMPROVEMENTS <br />1. NONE <br />• REGIONAL IMPROVEMENTS <br />1. LANDSCAPE, HARDSCAPE, ENTRY MONUMENTATION AND SIGNAGE <br />HORIZONTAL PUBLIC IMPROVEMENTS PLAN <br />1. RETAINING WALLS MAY BE REQUIRED FOR THE DEVELOPMENT OF THE PROJECT TO THE STANDARDS AND REQUIREMENTS OF <br />THE CITY, DEVELOPER AND MARKET NEEDS. WALLS WITHIN PRIVATE TRACTS/LOTS, ETC SHALL BE MINIMIZED TO 3', TO THE <br />EXTENT PRACTICAL. IF FEASIBLE, PRIVATE WALLS SHALL BE TIERED. WALL COLORS AND MATERIALS SHALL MATCH OR BE <br />COMPLEMENTARY THROUGHOUT THE DELO DEVELOPMENT. <br />2. CONSTRUCTION OF THE IMPROVEMENTS AND ALL USES MAY OCCUR IN ANY ORDER AND IS NOT LIMITED EXCEPT AS <br />REQUIRED TO PROVIDE A LOOPED WATER SERVICE, SANITARY SERVICE, TWO POINTS OF EMERGENCY ACCESS AND THAT <br />NO "DEAD END" LONGER THAN 500' WITHOUT A SECONDARY EMERGENCY ACCESS, SHALL OCCUR. <br />3. IMPROVEMENTS ALONG AND WITHIN THE BNSF RIGHT-OF-WAY FROM GRIFFITH STREET TO SOUTH STREET SHALL BE <br />COORDINATED WITH AND SUPPORTED BY THE CITY FOR INCLUSION WITHIN THE CITY'S AGREEMENT WITH BNSF TO ALLOW <br />FOR CONSTRUCTION OF THE DEVELOPMENT EFFORTS. THOSE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO FENCING, <br />RETAINING WALLS, TRANSITIONAL GRADING AND DRAINAGE CONNECTIONS AND MAY BE INCLUDED WITHIN ALL PHASES <br />OF THE DELO DEVELOPMENT. THE DEVELOPER WILL REIMBURSE THE CITY OF ANY DELO SPECIFIC FEES ASSOCIATED WITH THE <br />BNSF PERMITTING. ALL IMPROVEMENTS WILL BE BASED OFF THE FINAL PUD AND DETAILED WITHIN THE APPROVED <br />CONSTRUCTION DOCUMENTS. <br />4. PRIVATE IMPROVEMENTS SHALL NOT BE INCLUDED WITHIN THE DELO SUBDIVISION AGREEMENT. <br />5. THE DEVELOPMENT IS NOT RESPONSIBLE FOR ANY MINER'S FIELD IMPROVEMENTS. <br />6. ALL IMPROVEMENTS DEPICTED HEREIN ARE SUBJECT TO FINAL AGREEMENT WITHIN PROJECTS SUBDIVISION AGREEMENT <br />AND APPROVED CONSTRUCTION DOCUMENTS. <br />7. THE CITY FUNDED IMPROVEMENTS (SUBJECT TO FUNDING BY THE CITY) LOCATED WITHIN THE BNSF RIGHT OF WAY OR <br />HIGHWAY 42 RIGHT OF WAY AND THE ASSOCIATED REQUIRED PERMITTING SHALL NOT DELAY THE DELO PHASE 2 PROJECT. <br />DETENTION AND WATER QUALITY PHASING NOTES: <br />1. A TEMPORARY DETENTION AND WATER QUALITY FACILITY SHALL BE CONSTRUCTED ON-SITE TO SERVICE DELO IN THE EVENT <br />THAT AN OFF-SITE FACILITY TO SERVICE THIS PHASE OF THE PROJECT ISN'T AVAILABLE. THE DESIGN AND SPECIFICS SHALL BE <br />PRESENTED WITHIN THE SUBSEQUENT CONSTRUCTION DOCUMENTS. <br />2. IN THE EVENT THAT AN OFF-SITE FACILITY TO SERVICE THIS PROJECT IS NOT AVAILABLE AT THE TIME OF THE DEVELOPMENT A <br />TEMPORARY OR PERMANENT DETENTION AND WATER QUALITY FACILITY SHALL BE CONSTRUCTED ON-SITE TO SERVICE <br />DELO. THE POND MAY BE CONSTRUCTED IN A PERMANENT CONFIGURATION IN THE EVENT THAT THE TIMING OF THE <br />OFF-SITE FACILITY IS NOT ADVANTAGEOUS TO THE DELO DEVELOPMENT. THE DESIGN AND SPECIFICS SHALL BE PRESENTED <br />WITHIN THE SUBSEQUENT PHASE 2 CONSTRUCTION DOCUMENTS. <br />3. THIS FINAL PLANNED UNIT DEVELOPMENT SHALL PLAN FOR AND THE SUBSEQUENT CONSTRUCTION DOCUMENTS SHALL <br />EVALUATE AND DESIGN THE REQUIRED DETENTION AND WATER QUALITY VOLUME FOR THAT PHASE. AT THAT TIME, SHOULD <br />THE OFF-SITE REGIONAL DRAINAGE FACILITY NOT BE COMPLETED, A DETERMINATION TO DESIGN AND CONSTRUCT AN <br />PERMANENT ON-SITE FACILITY SHALL OCCUR. <br />4. WITH THE DEVELOPMENT OF THE OFF-SITE DRAINAGE FACILITY TO SERVICE THE REDEVELOPMENT AREA AND THE DELO <br />PROJECT, THE TEMPORARY DETENTION AND WATER QUALITY FACILITIES SHALL BE REMOVED AND THE DEVELOPMENT OF A <br />PUBLIC GREENWAY SHALL OCCUR. <br />planning & la <br />OoO <br />people <br />creating spaces <br />pcs group, inc. <br />1001 16th street, 3B-180 <br />Denver, CO 80265 <br />tel (303) 531-4905 <br />www.pcsgroupco.com <br />engineering <br />ENGINEERING <br />CONSULTANTS <br />Contact: Jason D. Margraf, PE <br />11101 W. 120th Ave, Ste 240 <br />Broomfield, CO 80021 <br />ph:(303) 368-5601 <br />fx: (303) 368-5603 <br />1" = 80' <br />scale <br />sheet title <br />orizontal Public <br />mprovements Plan <br />owner's rep <br />PAWS <br />21 South Sunset Street <br />Longmont, CO 80503 <br />Phone: 720.524.3620 <br />submittal <br />no date <br />description <br />• <br />1 08-15-2014 <br />initial submittal <br />2 11-21-2014 <br />second submittal <br />3 02-02-2015 <br />third submittal <br />4 09-01-2015 <br />final submittal <br />designed by: SOS <br />checked by: JDM <br />architecture <br />411CHITFCMUBE <br />3003 Larimer Street <br />Denver, CO 80205 <br />ph:(303) 861-5704 <br />WWW.OZarch.com <br />drawn by: SCD <br />project #: 030017 <br />sheet <br />of <br />