My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Louisville Plaza Filing 3 Lots 1 and 2 Jiffy Lube and Lehrers Flowers PUD Mylar
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
PUD (Planned Unit Developments)
>
L
>
Louisville Plaza
>
Louisville Plaza Filing 3 Lots 1 and 2 Jiffy Lube and Lehrers Flowers PUD Mylar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:11:37 AM
Creation date
5/8/2017 11:28:57 AM
Metadata
Fields
Template:
CITYWIDE
Also Known As (aka)
Jiffy Lube and Lehrer's Flowers
Doc Type
Mylar
Ord/Res - Year
2005
Ord/Res - Number
7
Recordation Number
2703354
Subdivision Name
Louisville Plaza Filing 3
Signed Date
7/11/2005
Parcel Identification Number
157504075001 is Lot 1, 157504075002 is Lot 2,
Cross-Reference
PC Res 2005-4
Lot 1 is 1712 Plaza Dr
Lot 2 is 1408 Hecla Way
Former legal description: Louisville Plaza Filing 2 Lot 5
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
5/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAWING NUMBER <br />DRAWING NUMBER <br />• <br />• <br />• <br />- , <br />• <br />• <br />vi` <br />r <br />40. <br />HECLA WAY <br />e <br />•• <br />e <br />r ▪ . <br />r <br />\• <br />/ <br />♦ <br />• <br />, <br />'I <br />. <br />• <br />• <br />S. <br />. <br />• <br />. <br />• —.. <br />,,'"'LEHRER'S FLOWER5-407.,/,,,/// <br />FF=96.0 ,,.-'/ - ' -- <br />/ <br />J <br />git I t DRIVEMATCH EXISTING <br />' MATCH EXISTING <br />CURB AND GUTTER <br />°a <br />`' <br />N <br />PROPOSED <br />5' SIDEWALK <br />• <br />'N. _ <br />IWO <br />X <br />I <br />J-/ <br />r <br />♦/ <br />X <br />• <br />I' <br />\ <br />\ <br />IFFY' LUB <br />FF='\92.5 <br />\ A. :Z.-1;'. <br />EXISTING BUILD/NG <br />• <br />1 <br />L <br />, , <br />.1.\\-\\-\\\'k\\\ -\\\* <br />• <br />\ <br />. <br />, <br />/ <br />/ <br />/ <br />C . <br />1 <br />--- <br />• <br />• <br />• <br />_ . - EX JPETA FV/NG MOLLS _ _ <br />. t i — ,or— — •r... r' — <br />- <br />PREPARED BY: <br />xo:N <br />ST <br />0 <br />ST <br />Drexel, Barrell & Co. Engineers • Surveyors <br />4840 PEARL EAST CIRCLE, SUITE 114 BOULDER, COLORADO 80301 (303) 442-4338 <br />6365 CORPORATE DRIVE COLORADO SPRINGS, COLORADO 80919 (719) 260-0887 <br />910 54TH AVENUE, SUITE 210 GREELEY, COLORADO 80634 (970) 351-0645 <br />CONTACT: ANNE M. PAGANO, P.E. <br />ST ST <br />S. BOULDER ROAD <br />ST <br />Si • <br />OM MI <br />- — — <br />ST <br />ST <br />20 10 0 <br />20 <br />SCALE: r=20' <br />40 <br />PREPARED FOR: PROJECT INFO: <br />OVERWAY + PEDERSEN ARCHITECTS JIFFY LUBE AND LEHRER'S FLOWERS <br />1675 LARIMER STREET, SUITE 640 <br />DENVER, COLORADO 80202 <br />(303) 302-7110 <br />CONTACT: JEFF PEDERSEN <br />LOT 5. LOUISVILLE PLAZA FIUNG 2 <br />LOUISVILLE, COLORADO <br />I. <br />DESIGNED BY: REVISION DESCRIPTIONS <br />MAA/BNW CITY COMMENTS <br />DRAWN BY: <br />CHECKED BY: <br />MAA <br />LEGEND <br />PROPOSED INTERMEDIATE CONTOUR ----s4 <br />PROPOSED INDEX CONTOUR <br />PROPOSED SPOT ELEVATION . . x 54.67 <br />(ALL C&G ELEVATIONS ARE ? U.N.O.) <br />EX INTERMEDIATE CONTOUR. 1115 364- -EX INDEX CONTOUR. 5365--- <br />CATCH CURB AND GUTTER �► <br />(ALL OTHER SHALL BE SPILL) <br />THICKENED EDGE WALK . • •®• .® M. MN MI <br />HIGH POINT HP <br />GRADE BREAK GB <br />LOW POINT . LP <br />TOP BACK OF CURB TOC <br />FLOWUNE <br />EX STORM SEWER <br />EX MANHOLE <br />PROPOSED CONCRETE. <br />ST <br />PROPOSED ASPHALT. <br />SILT FENCE <br />INLET PROTECTION <br />VEHICLE TRACKING CONTROL <br />? or FL <br />CALL UTiUTY NOTIFICATION <br />CENTER OF COLORADO <br />1-800-922-1987 <br />CALL 2 -BUSINESS DAYS IN ADVANCE <br />BEFORE YOU DIG, GRADE, OR EXCAVATE <br />FOR THE MARKING OF UNDERGROUND <br />MEMBER UTIUTIES. <br />011 itU R <br />OS ANNA NH;O. <br />12/30/04 <br />EROSION CONTROL <br />AND GRADING PLAN <br />DATE: <br />17 NOV 2004 <br />SCALE: <br />H: 1" = 20' <br />V: NONE <br />JOB NO: <br />DRAWING NO.: <br />60 076 <br />SHEET <br />1 <br />SHEETS <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.