My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Louisville Plaza Filing 3 Lots 1 and 2 Jiffy Lube and Lehrers Flowers PUD Mylar
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
PUD (Planned Unit Developments)
>
L
>
Louisville Plaza
>
Louisville Plaza Filing 3 Lots 1 and 2 Jiffy Lube and Lehrers Flowers PUD Mylar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:11:37 AM
Creation date
5/8/2017 11:28:57 AM
Metadata
Fields
Template:
CITYWIDE
Also Known As (aka)
Jiffy Lube and Lehrer's Flowers
Doc Type
Mylar
Ord/Res - Year
2005
Ord/Res - Number
7
Recordation Number
2703354
Subdivision Name
Louisville Plaza Filing 3
Signed Date
7/11/2005
Parcel Identification Number
157504075001 is Lot 1, 157504075002 is Lot 2,
Cross-Reference
PC Res 2005-4
Lot 1 is 1712 Plaza Dr
Lot 2 is 1408 Hecla Way
Former legal description: Louisville Plaza Filing 2 Lot 5
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
5/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W <br />m <br />2 <br />0 <br />cc <br />NG NUMBER <br />C_ <br />-I <br />a CC <br />LU <br />LU <br />C <br />acUJ <br />._ <br />z1=- <br />Z' <br />cn <br />Ca L, _ <br />CC_ <br />O <br />U <br />LL <br />Q <br />-= <br />3C - <br />I <br />0 <br />u <br />H:\JL Louisville_2416\PUD\Plotting\A2-3.dwg <br />• <br />■ <br />■ <br />• <br />■ <br />• <br />1 <br />1 <br />' 1 ' <br />1 I 1 <br />1 I 1 <br />1 1 <br />1 1 1 <br />I1 <br />II1 <br />NORTH ELEVATION <br />EAST ELEVATION <br />I 1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />111111111 <br />• <br />1 - 1 <br />• <br />-1a <br />• <br />This drawing is the property of Overway + Pedersen Architects, <br />LIP and is not to be reproduced or copied in whole or in part. <br />It shall only be used for the project and site specifically <br />identified herein and shall not be used on any other project. <br />HIGHEST POINT OF BUILDING <br />EL 123.00'N' <br />1 <br />1 <br />I <br />i <br />15 <br />721L. <br />/ 1 1 1 1 1 1 I <br />HIGHEST POINT OF BUILDING <br />EL. 123.00'N' <br />T.O. COPING <br />EL. 115.17' <br />T.O. COPING <br />EL. 113.33' <br />T.O. CMU <br />EL. 100.66' <br />T.O. FLOOR SLAB <br />EL. 96.00'N' <br />■ <br />■ <br />i <br />1 <br />i 1 <br />Il 111111111 <br />■ <br />1/4°4-0" (2) <br />■ <br />1/4"4-0" (1 <br />■ <br />T.O. COLUMN <br />EL. 115.17' <br />T.Q. COPING4L <br />EL 113.33' `F <br />T.O. COPING <br />EL. 107.83' <br />B.O. CHANNEL <br />EL. 105.83' <br />T.Q. CMU <br />EL 100.66'N' <br />T.O. FLOOR SLAB <br />EL 96.00' <br />KEYNOTES: <br />1. STANDARD SIZE BRICK VENEER <br />2. 8x16 SMOOTH FACE CMU VENEER <br />W/8x8 SCORING PATTERN <br />3. 8x16 SPLIT FACE CMU VENEER <br />4. 8x8 CMU VENEER ACCENTS <br />5. STEEL CHANNELS, PAINTED <br />6. ALUMINUM STOREFRONT <br />7. PREFINISHED METAL ROOFING <br />8. PREFINISHED ALUMINUM COPING <br />9. SCUPPER & DOWNSPOUT <br />10. WALL MOUNTED FULL CUTOFF LIGHT <br />FIXTURE, SEE DETAIL 4/A3.1 <br />11. MASONRY CONTROL JOINTS <br />12. ACCENT BRICK BAND <br />13. CAST CONCRETE COPING <br />14. PREFINISHED ALUMINUM RIDGE <br />SKYLIGHT <br />15. EXT. INSULATION & FINISH <br />SYSTEM (EIFS) <br />16. PREFINISHED STANDING SEAM METAL <br />ROOFING OVER PAINTED STEEL TUBE <br />FRAME <br />17. BUILDING SIGNAGE <br />18. 1" DEEP RAISED BAND <br />19. PERFORATED METAL SCREEN, PAINTED <br />20. CAST CONCRETE SILL <br />21. STEEL TUBES, PAINTED <br />22. AUTOMATIC SLIDING DOOR <br />23. 3'-4" HIGH BRICK WALL SPANNING <br />BETWEEN COLUMNS <br />:clAb <br />and <br />91/79 ?' 9 <br />BMC�s'� <br />S BOULDER RD AT PLAZA DR <br />LOUISVILLE, CO <br />CARCOLO #1 LTD. <br />9111 JOLLYVILLE ROAD, SUITE 106 <br />AUSTIN, TX 78759 <br />PROJ. <br />NO. <br />2416 <br />FINAL PUD & DEV. PLAN PLAN. COMM. CONDITIONS <br />• 17 NOV 2004 ..21 FEB 2005 <br />PUD COMMENTS <br />• 03 JAN 2005 .. <br />PLAN. COMM. COMMENTS <br />• 28 JAN 2005 <br />LEHRER'S <br />EXTERIOR ELEVATIONS <br />A2.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.