Laserfiche WebLink
tJ <br />BUILDING 7 <br />:.OADING DOCK ELEV.=5402 <br />GRADE IELEV.=5400 <br />...II,.I ei 1.1 <br />LOADING DOCK AREA <br />TOP OF TOWER ELEV.=5417 <br />COOLING TOWERS <br />FUTURE <br />TOP OF PARAPET ELEV.=5434 <br />GRADE ELEV.=5410 <br />SERVICE YARD <br />SECURITY FENCE <br />PHASE I <br />ROAD ELEV.=5407 <br />GRADE ELEV.=5408 <br />62'. <br />FUTURE � 'PHASE I I; <br />TRANSFORMER PAD <br />FUTURE <br />_ 274' <br />FUTURE <br />WALK PATH <br />TAPE DRIVE <br />a <br />z <br />z <br />4 <br />i <br />PARKING <br />BUILDING <br />LTR <br />REVISIONS <br />DESCRIPTION DATE <br />NOTE: <br />IT IS THE RESPONSIBILITY OF THE CONTRACTOR <br />TO BID THIS PROJECT TO INCLUDE ALL MATERIALS <br />AND EQUIPMENT AS SPECIFIED AND MEET% THE REQUIRED <br />COMPLETION DATES. ANY INTENT TO USE MATERIALS <br />OR EQUIPMENT OTHER THAN OR "EQUAL TO" THOSE <br />SPECIFIED MUST BE APPROVED BY PLANT <br />ENGINEERING PRIOR TO BID SUBMITTAL. ONCE THE <br />BID HAS BEEN SUBMITTED. AVAILABILITY AND LEAD <br />TIME RESOLUTION IS THE RESPONSIBILITY OF THE <br />CONTRACTOR AND SHOULD NOT IMPACT THE REQUIRED <br />SCHEDULED COMPLETION. <br />CONTRACTOR IS ALSO RESPONSIBLE TO RETURN ALL <br />RED LINE AS-BUILTS TO PLANT ENGINEERING BEFORE <br />FINAL INVOICE PAYMENT IS MADE. <br />StorageTek <br />TITLE <br />Facilities <br />CENTRAL UTILITIES PLANT <br />SITE PLAN <br />LOCATION: LOUISVILLE, COLORADO - <br />I DRAFT. ENGR. ENG.MGT. <br />NAME: <br />DATE: I <br />DRAWING NO. ci <br />FILENAME .DWG 06/23/93AD <br />crt <br />� z <br />PI <br />a <br />01 <br />a <br />a <br />;NIYa 30 3073 NCIJIS06 <br />o <br />0 <br />NOI1 OdC3Od O1Cl i Nn <br />S <br />dvSLO U33WflN A@ <br />0 : <br />DD6 <br />LU <br />In <br />o <br />