Laserfiche WebLink
3 <br />0 <br />0LJ <br />8 <br />0 <br />CO <br />0 <br />CO <br />J <br />a, <br />0 <br />0▪ 0 <br />w-- <br />� J <br />0 <br />E J <br />w <br />rn 0 <br />N <br />csio <br />• a <br />delo Final Planned Unit Development <br />A part of section 8, township 1 south, range 69 west of the 6th p.m. <br />City of Louisville, County of Boulder, State of Colorado <br />LOFTS <br />EAST ELEVATION <br />1/8" = 1'-0" <br />NORTH ELEVATION <br />MATERIAL PALETTE <br />BR1. BRICK, RUNNING BOND, COLOR: MEDIUM BROWN <br />BR2. BRICK, RUNNING BOND, COLOR: DARK BROWN <br />LS2. CEMENT LAP SIDING OR STUCCO: COLOR ORANGE <br />LSI. CEMENT LAP SIDING OR STUCCO COLOR: LIGHT GREY/TBD <br />MS 1. VERTICAL OR HORIZONTAL CORRUGATED METAL SIDING, <br />COLOR: MEDIUM GREY <br />WS1. HORIZONTAL TONGUE AND GROOVE WOOD RAINSCREEN <br />8" ROUGH SAWN CEDAR STAINED & SEALED <br />SS1. STANDING SEAM METAL PANEL SIDING, COLOR: CHARCOAL <br />1�! <br />L_Li <br />!Mt <br />SS2. STANDING SEAM METAL PANEL SIDING, COLOR: LIGHT GREY <br />WO1. ALUMINUM CLAD WINDOW FRAME, COLOR: CHARCOAL <br />TP1. PAINTED ACCENT TRIM, COLOR: DARK GREY <br />MS3. PAINTED FAUX METAL EXPOSED BEAM, COLOR: BLACK <br />GR1. POWDERCOATED METAL GUARDRAIL, COLOR: BLACK <br />ST1. STOREFRONT SYSTEM, COLOR: CHARCOAL <br />MTI. METAL CANOPY <br />1/8" = 1'-0" <br />NOTES <br />0% <br />�a <br />ROOF 2 A- <br />139'-0" <br />ROOF1 -• <br />136'-6" <br />ROOFTOP <br />• <br />124' - 0" <br />LEVEL 1 A <br />100' - 0" <br />ALL BUILDING MATERIALS AND COLORS ARE FROM THE BUILDING MATERIAL <br />PALETTE ARE ELIGIBLE FOR USE IN THE CONSTRUCTION DOCUMENTATION <br />PROCESS. <br />THE ARCHITECT WILL VARY THE COLORS ON THE EXTERIOR BALCONIES OF <br />THE RESIDENTIAL BUILDINGS PROPOSING TO USE COMPLEMENTARY COLORS <br />SELECTED OUT OF THE MATERIAL PALETTE FOR EACH BUILDING. THE ACTUAL <br />COLOR ASSIGNMENT WILL BE FINALIZED IN SUBSEQUENT BUILDING CON- <br />STRUCTION DOCUMENTS. <br />KEY PLAN <br />LIVE/WORK 3 BAY <br />LIVE/WORK 5 BAY <br />APARTMENT <br />BUILDING <br />A <br />MEE' 11 <br />_0 =TS <br />ELEVATIONS - 3 BAY COMMERCIAL/LIVE WORK <br />■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ai <br />3 MI Q A J no date description 1 =MC: 1/8-=1' <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ <br />designed by: OZ <br />drawn by: KA <br />checked by: RR <br />project #: 8675309 <br />2 <br />3 <br />4 <br />07.29.2016 <br />09.16.2016 <br />11.16.2016 <br />Second Submittal <br />Third Submittal <br />Fourth Submittal <br />••• <br />planning 12 la II <br />PCS Group Inc. <br />1001 16th Street, 3B-180 <br />Denver, CO 80265 <br />Phone (303) 531-4905 <br />www.pcsgroupco.com <br />713133 <br />*ir <br />J3 Engineering Consultants <br />2011 Cherry Street <br />Suite 206 <br />Louisville, CO 80027 <br />Phone (720)975-0177 <br />www.j3engineering.net <br />ARCHITECTURE <br />acfclARectiva <br />OZ Architecture <br />3003 Larimer Street <br />Denver, CO 80205 <br />Phone (303)861-5704 <br />WWW.OZarch.com <br />Foundry Builders, Inc. <br />'.1 South Sunset Street <br />Longmont, CO 80501 <br />'hone (720) 524-3620 <br />FOUNDRY <br />• <br />■ <br />■ <br />■ <br />• Hoath <br />■ ■■■■■■■■■■■■■■ <br />• <br />• s it e e R <br />■ <br />■ 14 .1 <br />■ <br />• <br />■ O <br />■ <br />■ <br />