Laserfiche WebLink
0 <br />n_ <br />iTo <br />CL <br />co0 <br />0 <br />o <br />0 <br />0 <br />co <br />J <br />cc <br />ra <br />Yo <br />cc -63 <br />w <br />J <br />0 <br />E -' <br />m <br />CI <br />'-co <br />• o <br />,CV <br />CO CV <br />a. C.' <br />0) <br />N O <br />N <br />a <br />delo Final Planned Unit Development <br />A part of section 8, township 1 south, range 69 west of the 6th p.m. <br />LOFTS City of Louisville, County of Boulder, State of Colorado <br />SOUTH ELEVATION <br />1/8" = 1'-0" <br />WEST ELEVATION <br />MATERIAL PALE 1 1E <br />BR1. BRICK, RUNNING BOND, COLOR: MEDIUM BROWN <br />BR2. BRICK, RUNNING BOND, COLOR: DARK BROWN <br />LS2. CEMENT LAP SIDING OR STUCCO: TBD <br />LS1. CEMENT LAP SIDING OR STUCCO COLOR: WHITE <br />MS2. VERTICAL OR HORIZONTAL CORRUGATED METAL SIDING, <br />COLOR: MEDIUM GREY <br />WS1. HORIZONTAL WOOD RAINSCREEN 8" ROUGH SAWN CHARRED <br />WOOD <br />MS1. COt<ir.N METAL PANEL <br />ill El <br />1111111=1111111111 <br />PPP <br />AGR <br />WO1. ALUMINUM CLAD WINDOW FRAME, COLOR: CHARCOAL <br />TP1. PAINTED ACCENT TRIM, COLOR: DARK GREY <br />MS3. PAINTED FAUX METAL r,xrwriJ BEAM, COLOR: BLACK <br />GR1. POWDERCOATED METAL GUARDRAIL, COLOR: BLACK <br />ST1. 31 Uiu r'KUNT SYSTEM, COLOR: CHARCOAL <br />MT1. METAL CANOPY <br />MT2. METAL MECHANICAL SCREENING <br />NOTES <br />ALL BUILDING MATERIALS AND COLORS ARE FROM THE BUILDING MATERIAL <br />PALETTE ARE ELIGIBLE FOR USE IN THE CONSTRUCTION DOCUMENTATION <br />PROCESS. <br />THE ARCHITECT WILL VARY THE COLORS ON THE EXTERIOR BALCONIES OF <br />THE RESIDENTIAL BUILDINGS PROPOSING TO USE COMPLEMENTARY COLORS <br />SELECTED OUT OF THE MATERIAL PALETTE FOR EACH BUILDING. THE ACTUAL <br />COLOR ASSIGNMENT WILL BE FINALIZED IN SUBSEQUENT BUILDING CON- <br />STRUCTION DOCUMENTS. <br />KEY PLAN <br />LIVE/WORK 3 BAY <br />LIVE/WORK 5 BAY <br />APARTMENT <br />BUILDING <br />1/8" 1'-0" <br />J <br />_OPTS <br />ELEVATIONS - RESIDENTIAL MULTI UNIT DWELLINGS <br />■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ <br />no description s Mut.' 1/8"=1 <br />1 Initial Submittal 1 <br />2 Second Submittal 1 <br />3 Third Submittal <br />4 Fourth Submittal • <br />• <br />■ <br />■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ <br />by: OZ <br />drawn by: KA <br />checked by: RR <br />t <br />#: 8675309 <br />date <br />03.1 1.2016 <br />07.29.2016 <br />09.16.2016 <br />11.16.2016 <br />• • • <br />planning la ■ <br />PCS Group Inc. <br />1001 16th Street, 3B-180 <br />Denver, CO 80265 <br />Phone (303) 531-4905 <br />www.pcsgroupco.com <br />J3 Engineering Consultants <br />2011 Cherry Street <br />Suite 206 <br />Louisville, CO 80027 <br />Phone (720)975-0177 <br />www.j3er.,. „net <br />aTchNeettre <br />hOZ Architecture <br />3003 Larimer Street <br />Denver, CO 80205 <br />Phone (303)861-5704 <br />ARCHITECTURE WWW.OZarch.com <br />■ <br />■ <br />■ <br />■ <br />■ north <br />■ ■■■■■■■■■Imum 'i <br />■ <br />OWiEVIS re ase t 1tt © ■ <br />■ <br />■ <br />■ <br />• ■ <br />i <br />Foundry Builders, Inc. <br />!1 South Sunset Street <br />Longmont, CO 80501 <br />'hone (720) 524-3620 <br />FOUNDRY <br />■ <br />160 <br />