Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
ENGINEERING <br />J3 ENGINEERING <br />i <br />---0UUE10114 <br />— — - <br />OUTLOT 13 - / <br />1 <br />PASCHAL -Knave <br />4- 80'R <br />EX. 5' WALK —i <br />T DC W W.E Z. <br />11• � EX. 10' U.E. 1 w <br />5350.50 <br />I�1 I <br />BLOCK 1 <br />110 .•.a� ± <br />5352.20 <br />15352.201 <br />LOCK 5 <br />TRACT R <br />5355 <br />! OUTLOT o <br />ti <br />5353.80/ <br />/5354.25 <br />EX. U.E. <br />BLOCK 2 <br />5354.00 <br />i <br />DRY U.E. <br />STEEL RANCH <br />PARK <br />GRADING PLAN <br />SCALE: 1" = 50' <br />7 .. _Aa <br />4 `1 1 moo <br />' 1111 ����. �. 4111111/ � 1 / <br />EX. 4' WALK <br />BLOCK 3 <br />—\� — EXISTING HWY 42 SIGNING AND <br />STRIPING <br />OUTLOT 6 <br />5357.00 <br />SWALE <br />SWALE — <br />5361.95 <br />EX. 10' U.E. <br />/ <br />/I <br />/ 1 <br />/ l/ 1 <br />TRACT D <br />0—e <br />SUMMIT VIEW DR. <br />`1 I <br />i <br />-----2 j1 <br />---- / / �\ <br />/ / -\ <br />/ / <br />// <br />/ / <br />/ / <br />/, <br />EX 4' WALK <br />FINAL DEVELOPMENT PLAN / PLANNED UNIT DEVELOPMENT <br />A PART OF SECTION 5, TOWNSHIP 1 SOUTH, RANGE 69 WEST OF THE 6TH PM, <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />NO DATE <br />OWNER'S REP <br />RMCS, INC. <br />21 SOUTH SUNSET STR. <br />LONGMONT, CO <br />80503 <br />P. 720.524.3620 <br />people creating spaces <br />PLANNING & LA <br />PCS GROUP, INC. <br />1001 16TH STR., 3B-180 <br />DENVER, CO <br />80265 <br />P 303.531.4905 <br />WWW.PCSGROUPCO.COM <br />ENGINEERING <br />CONSULTANTS <br />CONSULTANTS <br />2011 CHERRY STREET <br />SUITE 206 <br />LOUISVILLE, CO 80027 <br />P. 720.975.0177 <br />ARCHITECTURE <br />OZ ARCHITECTURE <br />3003 LARIMER STREET <br />DENVER, CO <br />80205 <br />P. 303.861.5704 <br />WWW.OZARCH.COM <br />DESCRIFT!ON <br />GRADING NOTES: <br />1. THE GRADING PRESENTED IS CONCEPTUAL BUT SHALL <br />BE CONSIDERED AS BASIS FOR SUBSEQUENT GRADING <br />PLANS. <br />2. TOP OF FOUNDATION ELEVATIONS ARE PRELIMINARY <br />AND SUBJECT TO CHANGE WITHIN THE FINAL <br />APPROVED CONSTRUCTION PLANS <br />LEGEND <br />PROPERTY BOUNDARY LINE <br />RIGHT OF WAY LINE <br />LOT LINE <br />PROPOSED CONTOURS <br />5800 <br />EXISTING CONTOURS <br />EXISTING STORM <br />PROPOSED STORM <br />AHP/LP/ <br />5350.0 <br />HIGH POINT / LOW POINT <br />FLOW DIRECTIONAL ARROW <br />TOP OF FOUNDATION <br />1 08.07.2015 INITIAL SUBMITTAL <br />2 11.13.2015 SECOND SUBMITTAL <br />05.11.2017 SUBMITTAL FOR APPROVAL <br />FINAL DEVELOPMENT PLAN <br />PLANNED UNIT DEVELOPMENT <br />Designed By: SA. <br />Checked By: PMS <br />Drawn By: KLM <br />project #: 03000701 <br />SHEET 13 OF 22 <br />GRADING PLAN <br />