Laserfiche WebLink
Item Description <br />Priority Ranking <br />(1-10) <br />Estimated Cost <br />Filter To Waste Valve/Flow Meter Automation <br />4 <br />$12,000 <br />Link Seals Replacement <br />4 <br />$12,000 <br />Backwash Turbidity SCADA Conductivity <br />4 <br />$2,400 <br />Epoxy and Seal Walls <br />2 <br />$6,000 <br />VFD Electrical Panel Replacement <br />5 <br />$3,000 <br />Recycle Tank Level Sensor Replacement <br />5 <br />$4,200 <br />Lighting Improvements <br />2 <br />$1,200 <br />Vault Improvements (improve access and ventilation) <br />3 <br />$18,000 <br />Level Transmitter Replacement <br />5 <br />$4,200 <br />Tank Outflow Vault Re I lacement <br />3 <br />$12,000 <br />Electrical Conduit Repair and Replacement <br />5 <br />$6,000 <br />Low Zone Vault Improvements (improve access and <br />ventilation) <br />3 <br />$18,000 <br />Perimeter Fence Repair <br />3 <br />$5,000 <br />Engineering Support Services <br />$40,000 <br />SID COPELAND WTP TOTAL <br />$822,740 <br />