Laserfiche WebLink
I 121 Cityoy im Louisville <br />PARKS & RECREATION <br />Memorandum <br />To: Rob Zuccaro, Planning & Building Safety Department Director <br />From: Allan Gill, PLA, and Park's Project Manager <br />Date: August 3, 2017 <br />Re: <br />The Recreation and Senior Center Expansion and Memory <br />Square Swimming Pool Improvements Project — Landscape <br />Review <br />The Parks & Recreation Department has reviewed the Recreation and Senior Center Expansion and <br />Memory Square Swimming Pool Improvements Projects — Design Development Submittal with revision <br />date of July 28, 2017 and has the following comments: <br />Summary: <br />With the size of the Recreation and Senior Center expanding almost two times impacts to the site are <br />considerable and are being addressed by Design Concepts the landscape architects for the project. <br />Some of the items that are being addressed: <br />Is parking which has had to increase to accommodate more people and cars and the need for <br />screening / buffering of cars, glare and headlights. <br />The need for increased water quality and stormwater detention and the addition of bio-swales <br />and a water quality pond. <br />The need to soften and buffer building massing with the planting of trees and shrubs on the <br />east and south sides of the facility. Expanding the building on two sides rather than four has <br />helped contain building massing and saved money as well. <br />The need to adequately address public safety and circulation. <br />The Memory Square Swimming Pool Improvements project has different challenges and opportunities. <br />With the alley to the west, the Arts building on the south, numerous utilities on site and limited access <br />construction of improvements on site will need to be coordinated carefully. <br />With construction improvements there is an opportunity to clean up and unify the landscape behind the <br />Arts building and adjacent to the south west corner of the pool house as well as in the front of both the <br />facilities as well as improving ADA access. The existing ADA ramp is not compliant. <br />The design team would like: <br />To hear the boards comments and recommendations on the plant pallet. <br />Location of plantings, trees and general landscape layout. <br />Areas or landscape ideas that should be evaluated and considered prior to moving from <br />design documents to construction documents and a guaranteed maximum price (GMP). <br />13 <br />