Laserfiche WebLink
N <br />45 <br />N <br />Boulder County, CO 03610768 <br />Plotted By: Stephanie Van Dyken Layout: 12 of 12 BUILDING 7 Printed On: 7/28/2017 10:04 AM File Name: BUILDING 7 & MATERIALS BOARD.dwg <br />BUILDING 7 <br />COMMERCIAL BUILDING WITH 1ST FLOOR RETAIL USE. ONE STORY DISTINCTIVE ARCHITECTURE AT ENTRY TO NORTH END. <br />South nou <br />er Roe, <br />- PEDESTRIAN ENTRY <br />SOUTH FACING <br />COURTYARD <br />MATERIALS <br />• ANGLES AND FLAT ROOFED ELEMENTS <br />WITH LARGE WINDOWS <br />----• METAL SIDING, STUCCO <br />• OUTDOOR COURTYARD <br />ELEVATIONS <br />SOUTH <br />WEST <br />NORTH <br />40' MAX. <br />HEIGHT <br />EAST <br />NOTE <br />ARCHITECTURAL DESIGN AND MINOR SITE CHANGES MAY BE ADJUSTED ADMINISTRATIVELY BY CITY STAFF FOR <br />CONFORMATION OF PUD BULK STANDARDS AND CONCEPTUAL PUD DESIGNS. ARCHITECTURAL DESIGNS SHOWN ARE <br />CONCEPTUAL IN INTENT AND ARE MEANT TO REFLECT THE HEIGHT, SCALE, MASS AND DIRECTION FOR THE PROJECT. <br />CONSTRUCTION DOCUMENTS WILL BE SUBMITTED WITH EACH INDIVIDUAL BUILDING PERMIT AND MAY DIFFER FROM PUD <br />ELEVATIONS, BUT WILL CAPTURE THE SPIRIT OF THE CONCEPTUAL DESIGNS AND FOLLOW THE APPROVED BULK <br />STANDARDS. <br />NORTH END MARKET <br />PUD AMMENDMENT <br />LOUISVILLE, CO <br />PREPARED BY: <br />■ land planning ■ landscape architecture ■ <br />■ urban design ■ entitlement ■ <br />419 Canyon Ave. Suite 200 Fort Collins, CO 80521 <br />phone 970.224.5828 I fax 970.225.66571 r. .:,:i,, com <br />PLANNER I LANDSCAPE ARCHITECT <br />RIPLEY DESIGN INC. <br />Stephanie Van Dyken, PLA <br />419 Canyon Ave. Suite 200 <br />Fort Collins, CO 80521 <br />p. 970.224.5828 <br />f. 970.225.6657 <br />OWNER <br />RIDGELINE DEVELOPMENT CORPORATION <br />Michael Markel <br />5723 Arapahoe Ave. #213 <br />Boulder, CO 80303 <br />p. 303.449.8689 <br />ENGINEER <br />JLB ENGINEERING CONSULTANTS <br />Jim Blankenship, PE <br />743 Pear Court <br />Louisville, CO 80027 <br />p. 303.604.1634 <br />ORIGINAL SIZE 24X36 <br />ISSUED <br />No. DESCRIPTION <br />01 PUD <br />02 MYLAR <br />REVISIONS <br />No. DESCRIPTION <br />BUILDING 7 <br />SEAL: <br />PROJECT No.: R15-057 <br />DRAWN BY: SV <br />REVIEWED BY: DH <br />DRAWING NUMBER: <br />DATE <br />8/23/2016 <br />7/27/2017 <br />DATE <br />12 OF 12 <br />