Laserfiche WebLink
N <br />4. <br />O <br />CO <br />0 <br />Iti <br />0 <br />c0 <br />M <br />0 <br />O <br />0 <br />C <br />0 <br />0 <br />0 <br />m <br />Printed On: 7/28/2017 10:03 AM File Name: BUILDING 1.dwg <br />Plotted By: Stephanie Van Dyken Layout: 6 of 12 BUILDING <br />BUILDING GROUP 1 <br />South <br />NOTE <br />D) <br />r <br />ARCHITECTURAL DESIGN AND MINOR SITE CHANGES MAY BE ADJUSTED ADMINISTRATIVELY BY CITY STAFF FOR CONFORMATION OF PUD <br />BULK STANDARDS AND CONCEPTUAL PUD DESIGNS. ARCHITECTURAL DESIGNS SHOWN ARE CONCEPTUAL IN INTENT AND ARE MEANT TO <br />REFLECT THE HEIGHT, SCALE, MASS AND DIRECTION FOR THE PROJECT. CONSTRUCTION DOCUMENTS WILL BE SUBMITTED WITH EACH <br />INDIVIDUAL BUILDING PERMIT AND MAY DIFFER FROM PUD ELEVATIONS, BUT WILL CAPTURE THE SPIRIT OF THE CONCEPTUAL DESIGNS <br />AND FOLLOW THE APPROVED BULK STANDARDS. <br />MATERIALS <br />• ASPHALT SHINGLE ROOF & EPDM FLAT ROOF ELEMENTS <br />LAP SIDING <br />• VINYL WINDOWS <br />• ARCHITECTURAL PANEL & LAP SIDING/STUCCO <br />• SPLIT FACE CONCRETE MASONRY UNIT <br />-• STEEL GARAGE DOORS WITH WINDOWS <br />ELEVATIONS <br />SOUTH <br />40' MAX. <br />HEIGHT <br />WEST <br />NORTH AT ALLEY <br />EAST <br />NORTH END MARKET <br />PUD AMMENDMENT . <br />LOUISVILLE, CO <br />PREPARED BY: <br />• land planning • landscape architecture ■ <br />■ urban design ■ entitlement ■ <br />419 Canyon Ave. Suite 200 Fort Collins, CO 80521 <br />phone 970.224.5828 I fax 970.225.6657 I www.ripleydesigninc.com <br />PLANNER / LANDSCAPE ARCHITECT <br />RIPLEY DESIGN INC. <br />Stephanie Van Dyken, PLA <br />419 Canyon Ave. Suite 200 <br />Fort Collins, CO 80521 <br />p. 970.224.5828 <br />f. 970.225.6657 <br />OWNER <br />RIDGELINE DEVELOPMENT CORPORATION <br />Michael Markel <br />5723 Arapahoe Ave.#2B <br />Boulder, CO 80303 <br />p. 303.449.8689 <br />ENGINEER <br />JLB ENGINEERING CONSULTANTS <br />Jim Blankenship, PE <br />743 Pear Court <br />Louisville, CO 80027 <br />p. 303.604.1634 <br />ORIGINAL SIZE 24X36 <br />ISSUED <br />No. DESCRIPTION <br />01 PUD <br />02 MYLAR <br />REVISIONS <br />No. DESCRIPTION <br />BUILDING 1 <br />SEAL: <br />PROJECT No.: R15-057 <br />DRAWN BY: SV <br />REVIEWED BY: DH <br />DRAWING NUMBER: <br />DATE <br />8/23/2016 <br />7/27/2017 <br />DATE <br />6 OF 12 <br />