My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revitalization Commission Agenda 2008 09 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
REVITALIZATION COMMISSION
>
2004-2019 Revitalization Commission Agendas and Packets
>
2008 Revitalization Commission Agendas and Packets
>
Revitalization Commission Agenda 2008 09 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 11:31:43 AM
Creation date
10/3/2008 4:11:53 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
RCAG 2008 09 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LRC Draft Timeline <br />• September 4th - Site tour of the urban renewal area with the consultants and <br />Heather, Sean, and Paul <br />• September 4th- Consultants briefing with Heather to discuss the planned approach <br />to LRC <br />• September 8th at 6:30 pm- Meeting with LRC <br />o Introduction of Marilee Utter and Becky Hogan to LRC <br />o Brief discussion of expectation of the consultants <br />o Present objectives for the remaining four months <br />• October 13th- Joint for LRC and City Council workshop from 5:00 pm to 9:00 pm <br />(at the Library) <br />o The goal of the workshop would be: <br />■ To provide an inventory analysis of the properties in the URA and <br />identify what will be needed for these properties to successfully <br />develop <br />Focus on an implementation plan for 2009, in a joint workshop <br />setting <br />• October 21st- Council update (no more than 10 minutes) by the URA consultants <br />during the regularly schedule Council meeting <br />• November loth- LRC Agenda <br />o Define components of a deal structure <br />o Discuss financing options <br />o Discuss bonding capacity and it's relationship to a deal structure <br />• December 8th- LRC Agenda <br />o Outlining development options for specific properties in the URA <br />o. Identifying the "gap" in moving ahead with development deals <br />
The URL can be used to link to this page
Your browser does not support the video tag.