My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Committee Agenda and Packet 2017 10 27
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2006-2019 Water Committee Agendas and Packets
>
2017 Water Committee Agendas and Packets
>
Utility Committee Agenda and Packet 2017 10 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:46:10 AM
Creation date
10/30/2017 10:08:51 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
UCPKT 2017 10 27
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary <br />Location <br />Item <br />HOWARD BERRY WATER TREATMENT PLANT (SOUTH) <br />Priority <br />Ranking (1-10) <br />Status <br />Anticipated Completion Date <br />1 <br />Current - October <br />Projects Percentage <br />Prior - August <br />Projects Percentage <br />Development <br />1 <br />1.0% <br />80 <br />77% <br />Bidding <br />54 <br />52.9% <br />0 <br />0% <br />Design <br />2 <br />2.0% <br />0 <br />0% <br />In progress <br />25 <br />24.5% <br />10 <br />10% <br />Completed <br />22 <br />21.6% <br />14 <br />13% <br />Location <br />Item <br />HOWARD BERRY WATER TREATMENT PLANT (SOUTH) <br />Priority <br />Ranking (1-10) <br />Status <br />Anticipated Completion Date <br />1 <br />Pretreatment <br />Trac -vac Repair <br />10 <br />Completed <br />N/A <br />2 <br />Pretreatment <br />New Raw Access Shed <br />1 <br />Bidding <br />May. '18 <br />3 <br />Pretreatment <br />Seal and Repair Concrete <br />3 <br />Bidding <br />Apr. '18 <br />4 <br />Pretreatment <br />Cherry Street Pipeline valve (CCGC) Replacement <br />8 <br />Bidding <br />Jan. '18 <br />5 <br />Pretreatment <br />Parking Lot Crack Seal and Patching <br />2 <br />Bidding <br />Apr. '18 <br />6 <br />Pretreatment <br />New Raw Water Bypass Valve <br />7 <br />Bidding <br />Jan. '18 <br />7 <br />Pretreatment <br />Lighting Improvements <br />1 <br />Bidding <br />Mar. '18 <br />8 <br />Pretreatment <br />Meter Testing/Calibration <br />6 <br />Bidding <br />Dec. '17 <br />9 <br />Pretreatment <br />Demo and Replace Surrounding Concrete (sidewalks <br />3 <br />Bidding <br />Apr. '18 <br />10 <br />Pretreatment <br />Soda Ash Feeder Removal <br />3 <br />Bidding <br />Dec. '17 <br />11 <br />Pretreatment <br />Permanganate Feeder and Equipment Remova <br />3 <br />Bidding <br />Dec. '17 <br />12 <br />Pretreatment <br />Chemical Feed Electrical Boxes Remova <br />3 <br />Bidding <br />Dec. '17 <br />13 <br />Pretreatment <br />PH Meter Replacement <br />7 <br />In progress <br />Nov. '17 <br />14 <br />Pretreatment <br />SCD Meter Replacement <br />7 <br />In progress <br />Nov. '17 <br />15 <br />Pretreatment <br />Chemical Building Programmable Logic Controller (PLC) Removal <br />2 <br />Bidding <br />Mar. '18 <br />16 <br />Pretreatment <br />Obsolete Exterior Fire Alarm Relocate <br />1 <br />Bidding <br />Mar. '18 <br />17 <br />Pretreatment <br />DIOXIDE Lighting Replacement <br />2 <br />Bidding <br />Mar. '18 <br />18 <br />Pretreatment <br />Exterior Painting <br />3 <br />In progress <br />Nov. '17 <br />19 <br />Pretreatment <br />Demo and Replace Surrounding Concrete (sidewalks and stairs <br />3 <br />Bidding <br />Apr. '18 <br />20 <br />Pretreatment <br />Flocculator Replacement <br />9 <br />In progress <br />Dec. '17 <br />21 <br />Main Bldg. <br />New Utility Sink <br />1 <br />Completed <br />N/A <br />22 <br />Main Bldg. <br />Lighting Improvements <br />3 <br />Bidding <br />Mar. '18 <br />23 <br />Main Bldg. <br />VFD Electrical Panel Repair <br />2 <br />Bidding <br />Dec. '17 <br />24 <br />Main Bldg. <br />Filter Building Exhaust Fan Panel Replacement <br />4 <br />Bidding <br />Dec. '17 <br />25 <br />Main Bldg. <br />Old Trac -vac Filter Intake Removal <br />2 <br />Bidding <br />Dec. '17 <br />26 <br />Main Bldg. <br />MCC Concrete Pad Repair <br />3 <br />Bidding <br />Apr. '18 <br />27 <br />Main Bldg. <br />Sanitary Sump Pump Service and Maintenance <br />7 <br />Completed <br />28 <br />Main Bldg. <br />Drywall Repairs <br />1 <br />Bidding <br />Dec. '17 <br />29 <br />Main Bldg. <br />Interior Finishes (painting and replacement of base boards <br />1 <br />In progress <br />Nov. '17 <br />30 <br />Main Bldg. <br />Window Tinting <br />1 <br />In progress <br />Dec. '17 <br />31 <br />Gallery <br />Surface Wash Pump Seal Replacement <br />5 <br />Completed <br />N/A <br />32 <br />Gallery <br />Back Wash Pump Seals Replacement <br />6 <br />In progress <br />Dec. '17 <br />33 <br />Gallery <br />Actuators Replacement <br />9 <br />In progress <br />Dec. '17 <br />34 <br />Gallery <br />Filter to Waste Line Improvement! <br />8 <br />Completed <br />N/A <br />35 <br />Gallery <br />Filter 2 Sample Pump Repair <br />7 <br />Completed <br />N/A <br />36 <br />Gallery <br />Air Blower Actuator Replacement <br />6 <br />Bidding <br />Dec. '17 <br />37 <br />Gallery <br />Electrical Panel Replacement <br />5 <br />Bidding <br />Dec. '17 <br />38 <br />Gallery <br />Clearwell Drain Improvements <br />3 <br />In progress <br />Dec. '17 <br />39 <br />Gallery <br />Polymer Automation <br />4 <br />Bidding <br />Mar. '18 <br />40 <br />Gallery <br />Trac -vac Flow Meter Calibration and Improvement <br />4 <br />Completed <br />N/A <br />41 <br />Gallery <br />Air Dyer Removal <br />2 <br />Bidding <br />May. '18 <br />42 <br />Gallery <br />Instrument Electrical Rail Repair <br />5 <br />Bidding <br />Dec. '17 <br />43 <br />Gallery <br />Chemical Feed (chlorine gas & caustic) Relocatior <br />4 <br />Completed <br />N/A <br />44 <br />Gallery <br />Backwash Rate Pump control valve 6 <br />In progress <br />Dec. '17 <br />Engineering Support Service. <br />Design <br />May. '18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.