My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 11 16
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 11 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
11/17/2017 8:49:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 11 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Saunders Estimating System (Project Estimate) <br />Copyright © 1998-2010, Saunders Construction, Inc. <br />User Defined Report <br />CSI <br />Section Description <br />Unit <br />Unit Cost <br />Comments <br />Bid Pac 2 <br />Quantity <br />Bid Pac 2 102,539 <br />1 <br />Amount <br />CSI Sec. Total <br />Cost/SF <br />Utilities <br />Amendment 01 <br />- <br />I <br />Site Lighting <br />Amendment 01 <br />- <br />- <br />Building Grid Lines and Benchmarks <br />Amendment 01 <br />- <br />- <br />31 30 00 Earthwork <br />- <br />- <br />62,713 <br />0.61 <br />Earthwork Subquote - Rec Center <br />Amendment 01 <br />689,320.00 <br />- <br />Additional Work in Bid Pac 2 <br />- <br />- <br />Added Rip Rap <br />1.0 <br />Subquote <br />14,922.00 <br />14,922 <br />Added Cobbles <br />1.0 <br />Subquote <br />3,518.00 <br />3,518 <br />Memory Square Pool <br />- <br />- <br />Mobilization <br />1.0 <br />LSum <br />1,000.00 <br />1,000 <br />Site Preparation <br />- <br />- <br />Site Demolition Including Haul -Off <br />Included <br />- <br />- <br />Clear and Grub Site Area <br />Included <br />- <br />- <br />Demo Concrete Sidewalk/ Ramp/ Pool Deck <br />Included <br />- <br />- <br />Demo Concrete Stairs on Grade <br />Included <br />- <br />- <br />Demo Guardrail <br />Included <br />- <br />- <br />Remove Existing Bench - Salvage and Retum to Owner <br />Included <br />- <br />- <br />Remove Existing Fence <br />Included <br />- <br />- <br />Remove Existing Wall - West End of Existing Pool Building <br />Included <br />- <br />- <br />Remove Tree <br />Included <br />- <br />- <br />Protect Existing Tree <br />Included <br />- <br />- <br />Protect Existing Pool Deck/ Concrete Walk - Plywood <br />1,500.0 <br />SqFt <br />2.18 <br />3,273 <br />Demo Concrete Wall <br />Included <br />- <br />- <br />Demo Existing Splash Pool <br />Included <br />- <br />- <br />Earthwork <br />1.0 <br />Subquote <br />75,000.00 <br />75,000 <br />Remove and Export 6' Existing Fill Below Floor Slab <br />Included <br />- <br />- <br />Export at Deck Expansion - 6' <br />Included <br />- <br />- <br />Export at New Splash Pool - 4' <br />Included <br />- <br />- <br />Export at New Splash Pool - 6' <br />Included <br />- <br />- <br />Export at Storage Building - 6' <br />Included <br />- <br />- <br />Import and Place Structural Fill - 6'-0" Below Slab on Grade <br />Included <br />- <br />- <br />Import at Deck Expansion - Avg 2k For Grade <br />Included <br />- <br />- <br />Import Structural Fill at Deck Expansion - 6' <br />Included <br />- <br />- <br />Import Structural Fill at New Splash Pool - 6'-0" <br />Included <br />- <br />- <br />Import Structural Fill at Storage Building - 6' <br />Included <br />- <br />- <br />Import Top Soil at Landacape Areas <br />Included <br />- <br />- <br />Granular Base at SOG 6" <br />Included <br />- <br />- <br />Remove 4' O/R at Sitework <br />(1.0) <br />LSum <br />35,000.00 <br />(35,000) <br />31 31 20 Temporary Erosion Control- <br />- <br />23,135 <br />0.23 <br />Temporary Erosion Control <br />- <br />- <br />Silt Fence <br />- <br />- <br />Trencher Installed <br />275.0 <br />LnFt <br />1.50 <br />413 <br />Erosion Control Blankets <br />- <br />- <br />Coco (including seeding) <br />SqFt <br />0.27 <br />- <br />Inlet Protection <br />Subquote <br />4,950.00 <br />- <br />Rock Sack <br />25.0 <br />LnFt <br />10.00 <br />250 <br />Rock w/Wire Basket <br />Included <br />- <br />- <br />Straw Wattles <br />275.0 <br />LnFt <br />2.25 <br />619 <br />Vehicle Tracking Control Mat <br />w/ 31 30 00 <br />- <br />- <br />Surface Roughening <br />w/ 31 30 00 <br />- <br />- <br />Rock & Wire Check Darns <br />w/ 31 30 00 <br />- <br />- <br />Temp Sediment Basin & Water Quality Riser <br />w/ 31 30 00 <br />- <br />- <br />Maintenance & Removal <br />- <br />- <br />Hand Work <br />4.0 <br />Months <br />1,564.09 <br />6,256 <br />Machine Work <br />Months <br />500.00 <br />- <br />Concrete Washout Maintenance, Removal & Hauloff <br />1.0 <br />Months <br />6,228.17 <br />6,228 <br />Street Cleaning <br />1.0 <br />Months <br />2,041.57 <br />2,042 <br />Skid Steer Loader <br />1.0 <br />Months <br />3,384.93 <br />3,385 <br />Broom Attachment <br />1.0 <br />Months <br />1,005.00 <br />1,005 <br />Pump & Bail <br />w/ 01 50 30 <br />- <br />- <br />Erosion Control Periodic Inspections <br />26.0 <br />Weeks <br />112.98 <br />2,937 <br />Erosion Control Working Foreman <br />Amendment 01 <br />502.56 <br />- <br />32 58 00 Lightpole Bases <br />Amendment 01 <br />- <br />- <br />- <br />- <br />I:\PCS\PCS Estimates\1701025 Louisville Recreation Center\03 Estimates\05 GMP\02 Bid Pac 2\Louisville Rec Center BP2_Final.xlsm <br />Estimate, Page 10 of 13 <br />11/10/2017, 2:49 PM <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.