Laserfiche WebLink
SUBJECT: <br />DATE: <br />CONTRACT AMENDMENT # 2 FOR REC EXPANSION <br />NOVEMBER 16, 2017 <br />PAGE 2 OF 3 <br />Based on the current project budget, below is a listing of desired add -alternatives that <br />will only be included within the project if cost savings/contingencies are found during the <br />construction cycle of the new and expanded facilities. If savings are not identified, they <br />will not be included in the project. <br />Replace existing pool filter at the Recreation/Senior Center <br />Replace perimeter deck drains at the Recreation/Senior Center <br />Dividing partition in the MAC Gym <br />Climbing Wall at Memory Square Pool <br />Leisure pool rapids at the Recreation/Senior Center <br />Level pool gutters at the Recreation/Senior Center <br />Steam/sauna renovation at the Recreation/Senior Center <br />Replace the Brooks/Crown partition at the Recreation/Senior Center <br />FISCAL IMPACT: <br />Below is a summary of the current funding sources for the project: <br />Rec Center Bond Proceeds <br />Interest Earnings <br />Historic Preservation Grant <br />Transfer from General Fund <br />Transfer from Lottery Fund <br />Transfer from Capital Projects Fund <br />Xcel Energy Development Assistance <br />Dept. of Local Affairs Grant (anticipated) <br />Subtotal <br />Plus This Request <br />Total Available for Project <br />TOTAL <br />$28,600,000 <br />$250,000 <br />$220,017 <br />$1,250,000 <br />$459,500 <br />395,100 <br />$85,000 <br />$500,000 <br />$31,759,617 <br />$250,000 <br />$32,009,617 <br />The current summary of total projected project costs is as follows: <br />Amendment #1, Site and Foundation <br />Proposed Amendment #2, Building Core & Shell, Site Pavement, MS <br />Pool and MS Site <br />Additional Funding Request -Caissons and Drywall <br />Proposed Amendment #3, Finishes Equipment and Accessories <br />Proposed Amendment #4 MAC Gym, Structure, Exterior, Finishes, MEP <br />$219,400 <br />$67,300 <br />$24,700 <br />$21,000 <br />$51,400 <br />$49,400 <br />$51,000 <br />$27,900 <br />$512,100 <br />$9,369,036 <br />$10,136,968 <br />$250,000 <br />$7,738,702 <br />$1,258,031 <br />Sub -Total Construction Budget <br />Engineering/Design Cost Reductions (i.e. value engineering) <br />$28,752,737 <br />($574,173) <br />CITY COUNCIL COMMUNICATION <br />3 <br />