Laserfiche WebLink
Document ID <br />Document Title <br />Latest Revisions Description <br />Latest Revision Issue <br />Date <br />min <br />00 31 32 <br />GEOTECHNICAL DATA <br />Bid Package #2 <br />09.29.17 <br />x <br />x <br />01 2100 <br />SOILS REPORT - Dated 06/07/17 <br />Bid Package #1 <br />07.28.17 <br />x <br />X <br />X <br />01 22 00 <br />SOILS REPORT - Dated 06/21/17 <br />Bid Package #2 <br />09.29.17 <br />X <br />x <br />DIVISION 01 - GENERAL REQUIREMENTS <br />01 10 00 <br />SUMMARY <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 2100 <br />Allowances <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />01 22 00 <br />UNIT PRICES <br />Bid Package #1 <br />07.28.17 <br />X <br />01 23 00 <br />ALTERNATES <br />Bid Package #2 <br />09.29.17 <br />X <br />01 25 00 <br />SUBSTITUTION PROCEDURES <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 26 00 <br />CONTRACT MODIFICATION PROCEDURES <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />BULLETIN FORM <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />01 29 00 <br />PAYMENT PROCEDURES <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 3100 <br />PROJECT MANAGEMENT AND COORDINATION <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 32 00 <br />CONSTRUCTION PROGRESS DOCUMENTATION <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 32 33 <br />PHOTOGRAPHIC DOCUMENTATION <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 33 00 <br />SUBMITTAL PROCEDURES <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 40 00 <br />QUALITY REQUIREMENTS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />0142 00 <br />REFERENCES <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 50 00 <br />TEMPORARY FACILITIES AND CONTROLS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 60 00 <br />PRODUCT REQUIREMENTS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 73 00 <br />EXECUTION <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />01 73 29 <br />CUTTING AND PATCHING <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />07 7419 <br />CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />CWM-1 CONSTRUCTION WASTE IDENTIFICATION <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />CWM-2 DEMOLITION WASTE IDENTIFICATION <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />CWM-3 CONSTRUCTION WASTE REDUCTION WORK PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />CWM-4 DEMOLITION WASTE REDUCTION WORK PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />CWM-7 CONSTRUCTION WASTE REDUCTION REPORT <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />CWM-8 DEMOLITION WASTE REDUCTION PROGRESS REPORT <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 77 00 <br />CLOSEOUT PROCEDURES <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 78 23 <br />OPERATION AND MAINTENANCE DATA <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 78 39 <br />PROJECT RECORD DOCUMENTS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 79 00 <br />DEMONSTRATION AND TRAINING <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />01 91 13 <br />GENERAL COMMISSIONING REQUIREMENTS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />DIVISION 02 - EXISTING CONDITIONS <br />02 41 19 <br />SELECTIVE DEMOLITION <br />BP2 -Addendum 1 <br />10.13.17 <br />X' <br />X <br />DIVISION 03 - CONCRETE <br />03 30 00 <br />CAST -IN-PLACE CONCRETE <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />DIVISION 04 - MASONRY <br />04 20 00 <br />UNIT MASONRY (Reference Only) <br />Bid Package #2 <br />09.29.17 <br />x <br />x <br />04 26 13 <br />MASONRY VENEER <br />Bid Package #2 <br />09.29.17 <br />X <br />DIVISION 05 - METALS <br />Document Control Log <br />Pag44Df 8 <br />Print Date: 11/7/2017 <br />