Laserfiche WebLink
Document ID Document Title Latest Revisions Description <br />Latest Revision Issue <br />Date <br />13 11 14 <br />POOL MAINTENANCE AND OPERATIONS TESTING <br />Bid Package #2 <br />09.29.17 <br />x <br />13 11 18 <br />POOL CONCRETE <br />Bid Package #2 <br />09.29.17 <br />X <br />13 11 20 <br />POOL PIPE AND PIPE FITTINGS <br />Bid Package #2 <br />09.29.17 <br />x <br />13 11 23 <br />POOL PIPE SUPPORTS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />13 11 24 <br />POOL VALVES <br />Bid Package #2 <br />09.29.17 <br />X <br />13 11 25 <br />POOL CENTRIFUGAL PUMPS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />13 11 34 <br />VERTICAL POOL FIBERGLASS FILTERS <br />Bid Package #2 <br />09.29.17 <br />X <br />13 1140 <br />POOL HEATING SYSTEMS <br />Bid Package #2 <br />09.29.17 <br />X <br />13 1145 <br />POOL RAIL GOODS <br />Bid Package #2 <br />09.29.17 <br />X <br />13 1146 <br />POOL EQUIPMENT <br />Bid Package #2 <br />09.29.17 <br />X <br />13 11 60 <br />POOL QUARTZ AGGREGATE FINISH <br />Bid Package #2 <br />09.29.17 <br />X <br />13 11 61 <br />POOL CERAMIC TILE <br />Bid Package #2 <br />09.29.17 <br />X <br />DIVISION 14 - ELECTRIC TRACTION ELEVATORS <br />DIVISION 21 - FIRE SUPPRESSION <br />DIVISION 22 - PLUMBING <br />22 05 00 <br />COMMON WORK RESULTS FOR PLUMBING <br />Bid Package #2 <br />09.29.17 <br />X <br />22 05 53 <br />PLUMBING IDENTIFICATION <br />Bid Package #2 <br />09.29.17 <br />X <br />22 07 00 <br />PLUMBING INSULATION <br />Bid Package #2 <br />09.29.17 <br />X <br />22 08 00 <br />COMMISSIONING OF PLUMBING SYSTEMS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />22 10 00 <br />PIPE, VALVES AND PIPE SPECIALTIES <br />Bid Package #2 <br />09.29.17 <br />X <br />22 20 00 <br />PLUMBING SYSTEMS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />DIVISION 23 - HVAC <br />23 05 00 <br />COMMON WORK RESULTS FOR HVAC <br />Bid Package #2 <br />09.29.17 <br />X <br />23 05 48 <br />HVAC VIBRATION CONTROL <br />Bid Package #2 <br />09.29.17 <br />X <br />23 05 53 <br />MECHANICAL IDENTIFICATION <br />Bid Package #2 <br />09.29.17 <br />X <br />23 05 93 <br />TESTING, ADJUSTING, AND BALANCING <br />Bid Package #2 <br />09.29.17 <br />X <br />23 07 00 <br />HVAC INSULATION <br />Bid Package #2 <br />09.29.17 <br />X <br />23 08 00 <br />COMMISSIONING OF MECHANICAL SYSTEMS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />23 30 00 <br />AIR DISTRIBUTION <br />Bid Package #2 <br />09.29.17 <br />X <br />23 8100 <br />ELECTRIC HEATING TERMINALS <br />Bid Package #2 <br />09.29.17 <br />X <br />DIVISON 26 - ELECTRICAL <br />26 05 00 <br />COMMON WORK RESULTS FOR ELECTRICAL <br />Bid Package #2 <br />09.29.17 <br />X <br />26 05 19 <br />LOW -VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES <br />Bid Package #2 <br />09.29.17 <br />X <br />26 05 26 <br />GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS <br />Bid Package #2 <br />09.29.17 <br />X <br />26 05 29 <br />HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS <br />Bid Package #2 <br />09.29.17 <br />X <br />26 05 33 <br />RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS <br />Bid Package #2 <br />09.29.17 <br />X' <br />26 05 44 <br />SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING <br />Bid Package #2 <br />09.29.17 <br />X <br />26 05 53 <br />IDENTIFICATION FOR ELECTRICAL SYSTEMS <br />Bid Package #2 <br />09.29.17 <br />X <br />26 08 00 <br />COMMISSIONING OF ELECTRICAL SYSTEMS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />26 09 23 <br />LIGHTING CONTROL DEVICES <br />Bid Package #2 <br />09.29.17 <br />X <br />26 09 43 <br />NETWORK LIGHTING CONTROLS <br />Bid Package #2 <br />09.29.17 <br />X <br />26 24 16 <br />PANELBOARDS <br />Bid Package #2 <br />09.29.17 <br />X <br />Document Control Log <br />Pa4.f 8 <br />Print Date: 11/7/2017 <br />